You are on page 1of 1

Q-005

MYANMAR INTERNATIONL CONSULTING ENGINEERS GROUP Issue Date:

Effective Date:

Filling Checklist

Project Name: Location:

SR/NO Description Yes No NA Remarks


01 Area within road reserve and mark out with collared pegs

02 Debris are removed before fill

03 Send samples of earthfill for CBR test and compaction test


to check suitability of earthfill, if required

04 Thickness of each layer of fill

05 Perform in-situ density test and keep proper record of each


layer of fill, if required

06 Final fill levels of fill she

07 Surface water control

08

09

10

11

12

(Name / Signature / Date)

Request by:

Checked by:

Verified by:

You might also like