Q-006

MYANMAR INTERNATIONL CONSULTING ENGINEERS GROUP Issue Date:

Effective Date:

CONCRETING INSPECTION CHECKLIST

Project Name: Location:

SR/NO Description Yes No NA Remark

Before Concreting

01 Rebar checked

02 Formwork checked

03 M & E opening checked

04 Type of slab joint according to drawing

05 Proper construction joint with existing cast element

06 Cleanliness

07 Finishing Level peg correctly set

08 No of cube to be taken:

During Concreting

01 Column rebar position checked and prepare after


concreting:

02 Working condition

03 Batching, Mixing, Consistency, Conveying

04 Placing & Compacting

05 Slump Test and Sampling for Compressive Strength Test

06 Construction Joints
07 Formwork & Embedded Fixtures

(Name / Signature / Date)

Request by:

Checked by:

Verified by:

-2-
Q-006

MYANMAR INTERNATIONL CONSULTING ENGINEERS GROUP Issue Date:

Effective Date:

Post Pour Inspection Checklist (After Concreting)


SR/NO Description Yes No NA Remarks

01 Adequate time for wring before striping


formwork

02 No visible surface bulging

03 No visible grout leakage

04 No visible honey comb

05 Construction tolerances within limits

06 Formwork Removing

07 Cleaning

08 Curing

09 Specimen Testing

(Name / Signature / Date)

Request by:

Checked by:

Verified by:

-3-