You are on page 1of 1

16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

LEGEND :

H H
ELECTRICAL
PROTECTIVE
UNIT
DEVICE
OPERATING
OPERATES

G G
RE-SET & AND
BLOCKED

PT. PLN (Persero)


F PUSAT ENJINIRING KETENAGALISTRIKAN
JLN. AIPDA K. S. TUBUN I/2, PETAMBURAN
F
JAKARTA BARAT

PROJECT :

NUA MHPP (2 x 4.4 MW)


E CENTRAL MALUKU E
GENERATOR WICKET GATES DRAWING TITLE
BREAKER CLOSE AT
OPENS FAST RATE
ELECTRICAL

D D
DRAWING SUB TITLE

TYPICAL ELECTRICAL TROUBLE


EXCITATION UNIT (EMERGENCY) STOP SEQUENCE
REMOVED DECELERATES

C NO SYMBOL REVISION DATE APPROVED C


CONSULTANT

BRAKES APPLIED
AT PRESET SPEED

DRAWN :
B B
DESIGN :
MAIN VALVE
CLOSE
SCALE DRAWN DESIGN CHECKED APPROVED

A UNIT
SHEET NO : REVISION :
A
DATE DATE DATE
STOPS DRAWING NO :

112117-NUA02-L-05-DW-SCIR-062

16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1