Professional Documents
Culture Documents
Vetted Oh Rubrics Project Draft v1 17nov2021 Cp041221
Vetted Oh Rubrics Project Draft v1 17nov2021 Cp041221
(CP1: KP3 -Engineering Fundamentals; KP4 -Specialist Knowledge; KP6 – Engineering Practice and KP8 – Research Literature)
(CP2 – Conflicting requirement, CP6 – Extent of stakeholder and CP7 – Interdependence)
OCT 2021 – JAN 2022
SUB-TOTAL
/2.5 marks
1
RUBRICS (PERFORMANCE CRITERIA) PROJECT – COMPLEX PROBLEM (CONT’D)
(CP1: KP3 -Engineering Fundamentals; KP4 -Specialist Knowledge; KP6 – Engineering Practice and KP8 – Research Literature)
(CP2 – Conflicting requirement, CP6 – Extent of stakeholder and CP7 – Interdependence)
OCT 2021 – JAN 2022
SUB-TOTAL /15
marks
2
RUBRICS (PERFORMANCE CRITERIA) PROJECT – COMPLEX PROBLEM (CONT’D)
(CP2 – Conflicting requirement, CP4 – Familiarity of issues, CP6 – Extent of stakeholder and CP7 – Interdependence)
CP6 - Extent of Differentiate the diverse Provide one (1) Compare and Compare and Compare and Compare and
stakeholder groups of stakeholders with group differentiate 2 differentiate 3 differentiate 4 differentiate more
involvement and widely varying needs groups groups groups than 4 groups of
conflicting (Task a) stakeholders/custo
requirements = mers that varying
diverse groups of in needs /2.5 marks
stakeholders with
widely varying
Select stakeholder interests Select ONE (1) Select TWO (2) Select TWO (2) Select THREE (3) Select more than
needs
and requirements that give stakeholder and stakeholders and stakeholders and stakeholders and THREE (3)
(CLO2-PLO6)
impact on the problem discuss impact. compare impact. justify impacts. justify impacts. stakeholders and
(Task a) justify impacts.
/2.5 marks
SUB-TOTAL
/5 marks
3
RUBRICS (PERFORMANCE CRITERIA) PROJECT – COMPLEX PROBLEM CONT’D)
(CP2 – Conflicting requirement, CP4 – Familiarity of issues, CP6 – Extent of stakeholder and CP7 – Interdependence)
SUB-TOTAL
/7.5 marks
TOTAL
/30
Prepared and Marked By : Verification By: Resource Person Complex Problem Committee Verification: