Fosroc® Conbextra GP
Properties holes and fixing pockets must be blown clean of any dirt or
The following results were obtained at a water: powder ratio debris.
of 0.18 and temperature of 25°C.
Pre-soaking
Compressive strength : 26 N/mm2 @ 1 day
(ASTM C109) For a minimum of 2 hours prior to grouting, the area of
55 N/mm2 @ 7 days cleaned substrate should be flooded with fresh water.
66 N/mm2 @ 28 days Immediately before grouting takes place, any free water
should be removed. Particular care should be taken to blow
Flexural strength : > 10 N/mm2 @ 28 days out all bolt holes and pockets.
(BS EN196-1)
Modulus of Elasticity
Levelling shims
(ASTM C469-02) : >24000 Mpa
If the levelling shims are to be removed after the grout has
Expansion characteristics hardened, they should be treated with a thin layer of grease.
ASTM C940-98a : Up to 2% @ 24 hours
Formwork
Specification The formwork should be constructed to be leak-proof. This
Performance specification can be achieved by using foam rubber strip or mastic sealant
beneath the constructed formwork and between joints.
All grouting where shown on the drawing must be carried out
with a pre-packaged cement based product which is In some cases it is practical to use a sacrificial semi-dry sand
chloride-free. and cement formwork. The formwork should include outlets
for pre-soaking.
It shall be mixed with clean water to the required
consistency. The plastic grout must not bleed or segregate.
Unrestrained surface area
A positive volumetric expansion shall occur while the grout is The unrestrained area must be kept to a minimum. Generally
plastic by means of a gaseous system. the gap width between the perimeter formwork and the plate
edge should not exceed 150 mm on the pouring side and 50
The compressive strength of the grout must exceed
mm on the opposite side. It is advisable where practical to
50 N/mm² at 7 days and 66 N/mm² at 28 days.
have no gap at the flank sides.
The storage, handling and placement of the grout must be in
strict accordance with the manufacturer’s instructions. Mixing
For best results a mechanically powered grout mixer should
Supplier specification
be used. When quantities up to 50 kg are used, a slow
All grouting where shown on the drawing must be carried out
speed drill fitted with a Fosroc Mixing Paddle (MR3) should
using Conbextra GP manufactured by Fosroc and used in
be used. Larger quantities will require a high shear vane
accordance with the manufacturer’s data sheet.
mixer. Do not use a colloidal impeller mixer.
Page 2
Fosroc® Conbextra GP
Consistency of grout mix then leave for at least seven days - especially if exposed to
The quantity of clean water required to be added to a 25kg sunlight.
bags to achieve the desired consistency is given below.
Cleaning
Trowellable : 3.4 - 3.6 litres per 25kg bag
Conbextra GP should be removed from tools and equipment
Flowable : 4.2 - 4.5 litres per 25kg bag
with clean water immediately after use. Cured material
The selected water content should be accurately measured can be removed mechanically, or with Fosroc Acid Etch*†.
into the mixer. The total contents of the Conbextra GP bag
should be slowly added and continuous mixing should take Sampling procedure
place for 5 minutes. This will ensure that the grout has a Cementitious grouts cannot be tested as concrete. Special
smooth even consistency. sampling procedure are required refer to your local Fosroc
office for further details.
Placing
Typical hopper system
At 25°C place the grout within 15 minutes of mixing to gain
full benefit of the expansion process. Removable hopper: For larger pours the grout may be
hand placed or pumped into a removable hopper (trough).
Conbextra GP can be placed in a minimum thickness of
10mm up to a maximum thickness of 100mm in a single pour
when used as an under plate grout. For thicker sections it is
necessary to fill out Conbextra GP with well graded 10mm,
silt free aggregate to minimize exotherm. If bulking with
aggregate is used the ratio shall not exceed 1:1. Contact
Fosroc for details of pre-bagged supply. The properties of a
bulked grout will differ from those published in this data
sheet. For consistent results, the use of Conbextra TS is
advisable.
Pouring should be from one side of the void to minimize any High temperature working
air or pre-soaking water becoming trapped under the It is suggested that, for temperatures above 35°C,the
base-plate. It is advisable to pour the grout across the following guidelines are adopted as good working practice:
shortest distance of travel. The grout head must be
i) Store unmixed material in a cool (preferably
maintained at all times so that a continuous grout front is
temperature controlled) environment, avoiding
achieved.
exposure to direct sunlight.
Where large volumes have to be placed Conbextra GP may ii) Keep equipment cool, arranging shade protection if
be pumped. A heavy duty diaphragm pump is recommended necessary. It is especially important to keep cool those
for this purpose. Screw feed and piston pumps may also be surfaces of the equipment which will come into direct
suitable. contact with the material itself.
iii) Try to eliminate application during the hottest times of
Curing
the day and in direct sunlight.
On completion of the grouting operation, exposed areas
should be thoroughly cured using Concure P. There is no iv) Make sufficient material, plant and labour available to
need to remove Concure P as it will provide some protection ensure that application is a continuous process.
and won’t yellow. If using wet Hessian and plastic sheeting v) Water (below 20°C) should be used for mixing the
grout prior to placement.
Page 3
Fosroc® Conbextra GP
Limitations Fire
Should not be placed in any unrestrained situation. Conbextra GP is non-flammable.
However, can be used for bolt holes or pockets. For further
details contact Fosroc. Additional Information
Fosroc manufactures a wide range of complementary
Estimating products which include :
Supply ■ waterproofing membranes & waterstops
Conbextra GP : 25kg bags
■ joint sealants & filler boards
Yield ■ cementitious & epoxy grouts
Trowellable : 12 liters per 25kg bag ■ specialised flooring materials
Flowable : 13.25 liters per 25kg bag
Fosroc additionally offers a comprehensive package of
Note: Allowance should be made for wastage when products specifically designed for the repair and
estimating quantities required. refurbishment of damaged concrete. Fosroc’s ‘Systematic
Approach’ to concrete repair features the following :
Storage
■ hand-placed repair mortars
Conbextra GP has a shelf life of 12 months if kept in a dry
store in sealed bags. If stored in high temperature and high ■ spray grade repair mortars
humidity locations the shelf life will be reduced.
■ fluid micro-concretes
Important note
Fosroc products are guaranteed against defective materials and manufacture and are sold subject to its standard Conditions for the
Supply of Goods and Services, copies of which may be obtained on request. Whilst Fosroc endeavours to ensure that any advice,
recommendation, specification of information it may give is accurate and correct, it cannot, because it has no direct or continuous
control over where or how its products are applied, accept any liability either directly or indirectly arising from the use of its products,
whether or not in accordance with any advice, specification, recommendation of information given by it.
Fosroc International
www.fosroc.com
Page 4 Ref: ConbGP/DS/12/19