You are on page 1of 6

Page 1 of 6

EXW-P008-0002-QM-PBR-FO-00045 P008-C2 - Construction & Upgrading of E-Ring Road - North/South Link Revision: CA Date:

Area: Discipline/Structure: Dry Utility / MEP (AWB-01 Pedestrian Bridge) Snag Date: 22-Dec-21

Item SNAG EXACT LOCATION SNAG DESCRIPTION CATEGORY PHOTO -BEFORE PHOTO - AFTER PLANNED ACTUAL CLOSED BY DEC CLOSED BY SC NOTE
No. DATE DATE SIGNATURE SIGNATURE

1 Lift Shaft (Typical) Horizontal Indicator is not visible during daytime Minor

2 (General) CCTV camera installation to be done Minor

3 Electrical Room Fix Miissing screw Minor

Electrical Room Earth cable to be termintaed properly Minor

Electrical Room Cable truck cover missing Minor

Label missing

[1] Snag Category: Major - if has adverse impact with asset safe operation; Minor - if no impact with asset safe operation. [2] Location: LHS /or RHS - when facing @ INCREASING Chainage Proejct ID : IA 14/15 C 075 ST
Contract No. : C 2017 / 01
Page 2 of 6

EXW-P008-0002-QM-PBR-FO-00045 P008-C2 - Construction & Upgrading of E-Ring Road - North/South Link Revision: CA Date:

Area: Discipline/Structure: Dry Utility / MEP (AWB-01 Pedestrian Bridge) Snag Date: 22-Dec-21

Item SNAG EXACT LOCATION SNAG DESCRIPTION CATEGORY PHOTO -BEFORE PHOTO - AFTER PLANNED ACTUAL CLOSED BY DEC CLOSED BY SC NOTE
No. DATE DATE SIGNATURE SIGNATURE

Uncused holes to be covered

CCTV Cable laying to be completed

AC drain pipe shall be changed to out door type

CCTV Camera to be installed

Touch up pain to be applied at the cutting portion.

[1] Snag Category: Major - if has adverse impact with asset safe operation; Minor - if no impact with asset safe operation. [2] Location: LHS /or RHS - when facing @ INCREASING Chainage Proejct ID : IA 14/15 C 075 ST
Contract No. : C 2017 / 01
Page 3 of 6

EXW-P008-0002-QM-PBR-FO-00045 P008-C2 - Construction & Upgrading of E-Ring Road - North/South Link Revision: CA Date:

Area: Discipline/Structure: Dry Utility / MEP (AWB-01 Pedestrian Bridge) Snag Date: 22-Dec-21

Item SNAG EXACT LOCATION SNAG DESCRIPTION CATEGORY PHOTO -BEFORE PHOTO - AFTER PLANNED ACTUAL CLOSED BY DEC CLOSED BY SC NOTE
No. DATE DATE SIGNATURE SIGNATURE

Identification label for Eletrcical room missing

FeederPillar Identification label for circuits missing

FeederPillar Heat shrinkable sleeves to be used for termination

FeederPillar Earth cable termination to be tightened propely

FeederPillar Permananet cable tag to be provided

[1] Snag Category: Major - if has adverse impact with asset safe operation; Minor - if no impact with asset safe operation. [2] Location: LHS /or RHS - when facing @ INCREASING Chainage Proejct ID : IA 14/15 C 075 ST
Contract No. : C 2017 / 01
Page 4 of 6

EXW-P008-0002-QM-PBR-FO-00045 P008-C2 - Construction & Upgrading of E-Ring Road - North/South Link Revision: CA Date:

Area: Discipline/Structure: Dry Utility / MEP (AWB-01 Pedestrian Bridge) Snag Date: 22-Dec-21

Item SNAG EXACT LOCATION SNAG DESCRIPTION CATEGORY PHOTO -BEFORE PHOTO - AFTER PLANNED ACTUAL CLOSED BY DEC CLOSED BY SC NOTE
No. DATE DATE SIGNATURE SIGNATURE

Anto corrosion tape missing in the earth pit

FeederPillar To be cleaned to remove all the dirt.

AC Unit Proper Power supply for AC Unit to be provided

Extra opening/ sleeve to be closed to avoid dust entry


Extra Opening
inside shaft

provide a sleeve for flexible pipe and closed with


Wall penetration cable
approved sealant

[1] Snag Category: Major - if has adverse impact with asset safe operation; Minor - if no impact with asset safe operation. [2] Location: LHS /or RHS - when facing @ INCREASING Chainage Proejct ID : IA 14/15 C 075 ST
Contract No. : C 2017 / 01
Page 5 of 6

EXW-P008-0002-QM-PBR-FO-00045 P008-C2 - Construction & Upgrading of E-Ring Road - North/South Link Revision: CA Date:

Area: Discipline/Structure: Dry Utility / MEP (AWB-01 Pedestrian Bridge) Snag Date: 22-Dec-21

Item SNAG EXACT LOCATION SNAG DESCRIPTION CATEGORY PHOTO -BEFORE PHOTO - AFTER PLANNED ACTUAL CLOSED BY DEC CLOSED BY SC NOTE
No. DATE DATE SIGNATURE SIGNATURE

Inside cabin lift ceiling to be cleaned and Illumination


Lift Ceiling to be checked

[1] Snag Category: Major - if has adverse impact with asset safe operation; Minor - if no impact with asset safe operation. [2] Location: LHS /or RHS - when facing @ INCREASING Chainage Proejct ID : IA 14/15 C 075 ST
Contract No. : C 2017 / 01
# Name Company
1 Eduardo Francisco WSP
2 Shazhad Khan DEC
3 Jerlibn Joseph DEC
4 Edwin Galicia DEC