EXW-P008-0002-QM-PBR-FO-00045 P008-C2 - Construction & Upgrading of E-Ring Road - North/South Link Revision: CA Date:
Area: Discipline/Structure: Dry Utility / MEP (AWB-01 Pedestrian Bridge) Snag Date: 22-Dec-21
Item SNAG EXACT LOCATION SNAG DESCRIPTION CATEGORY PHOTO -BEFORE PHOTO - AFTER PLANNED ACTUAL CLOSED BY DEC CLOSED BY SC NOTE
No. DATE DATE SIGNATURE SIGNATURE
1 Lift Shaft (Typical) Horizontal Indicator is not visible during daytime Minor
Label missing
[1] Snag Category: Major - if has adverse impact with asset safe operation; Minor - if no impact with asset safe operation. [2] Location: LHS /or RHS - when facing @ INCREASING Chainage Proejct ID : IA 14/15 C 075 ST
Contract No. : C 2017 / 01
Page 2 of 6
EXW-P008-0002-QM-PBR-FO-00045 P008-C2 - Construction & Upgrading of E-Ring Road - North/South Link Revision: CA Date:
Area: Discipline/Structure: Dry Utility / MEP (AWB-01 Pedestrian Bridge) Snag Date: 22-Dec-21
Item SNAG EXACT LOCATION SNAG DESCRIPTION CATEGORY PHOTO -BEFORE PHOTO - AFTER PLANNED ACTUAL CLOSED BY DEC CLOSED BY SC NOTE
No. DATE DATE SIGNATURE SIGNATURE
[1] Snag Category: Major - if has adverse impact with asset safe operation; Minor - if no impact with asset safe operation. [2] Location: LHS /or RHS - when facing @ INCREASING Chainage Proejct ID : IA 14/15 C 075 ST
Contract No. : C 2017 / 01
Page 3 of 6
EXW-P008-0002-QM-PBR-FO-00045 P008-C2 - Construction & Upgrading of E-Ring Road - North/South Link Revision: CA Date:
Area: Discipline/Structure: Dry Utility / MEP (AWB-01 Pedestrian Bridge) Snag Date: 22-Dec-21
Item SNAG EXACT LOCATION SNAG DESCRIPTION CATEGORY PHOTO -BEFORE PHOTO - AFTER PLANNED ACTUAL CLOSED BY DEC CLOSED BY SC NOTE
No. DATE DATE SIGNATURE SIGNATURE
[1] Snag Category: Major - if has adverse impact with asset safe operation; Minor - if no impact with asset safe operation. [2] Location: LHS /or RHS - when facing @ INCREASING Chainage Proejct ID : IA 14/15 C 075 ST
Contract No. : C 2017 / 01
Page 4 of 6
EXW-P008-0002-QM-PBR-FO-00045 P008-C2 - Construction & Upgrading of E-Ring Road - North/South Link Revision: CA Date:
Area: Discipline/Structure: Dry Utility / MEP (AWB-01 Pedestrian Bridge) Snag Date: 22-Dec-21
Item SNAG EXACT LOCATION SNAG DESCRIPTION CATEGORY PHOTO -BEFORE PHOTO - AFTER PLANNED ACTUAL CLOSED BY DEC CLOSED BY SC NOTE
No. DATE DATE SIGNATURE SIGNATURE
[1] Snag Category: Major - if has adverse impact with asset safe operation; Minor - if no impact with asset safe operation. [2] Location: LHS /or RHS - when facing @ INCREASING Chainage Proejct ID : IA 14/15 C 075 ST
Contract No. : C 2017 / 01
Page 5 of 6
EXW-P008-0002-QM-PBR-FO-00045 P008-C2 - Construction & Upgrading of E-Ring Road - North/South Link Revision: CA Date:
Area: Discipline/Structure: Dry Utility / MEP (AWB-01 Pedestrian Bridge) Snag Date: 22-Dec-21
Item SNAG EXACT LOCATION SNAG DESCRIPTION CATEGORY PHOTO -BEFORE PHOTO - AFTER PLANNED ACTUAL CLOSED BY DEC CLOSED BY SC NOTE
No. DATE DATE SIGNATURE SIGNATURE
[1] Snag Category: Major - if has adverse impact with asset safe operation; Minor - if no impact with asset safe operation. [2] Location: LHS /or RHS - when facing @ INCREASING Chainage Proejct ID : IA 14/15 C 075 ST
Contract No. : C 2017 / 01
# Name Company
1 Eduardo Francisco WSP
2 Shazhad Khan DEC
3 Jerlibn Joseph DEC
4 Edwin Galicia DEC