CALCULATIONS
AREA (m ) 2
WEIGHT IN AIR (kg) WEIGHT OF UNIT BUOYANCY OF UNIT PIPE - B (Kg) PIPELINE
CONC. PIPE IN AIR STRING LENGTH
CASE STEEL - AS STEEL - Ws Wcp (kg) MEDIUM BUOYANCY (m)
tsi = 2.96E-02 2792.19 5090.18 Swamp 5386.14 0
tsii = 3.25E-02 3064.88 5362.87 Creek 4312.36 1000
TOTAL
W'GHT OF SUBMERGED
ABSORBED H2O IN PIPELINE SPREAD
UNIT PIPE (3%) - AVG UNIT SUBMERGED WGHT OF WGHT KPxx - Kpxy
CONC COAT - Aconc CONC COAT - Wconc Waw (kg) LINE PIPE - Wsa (Kg/m) (Kg)
tsi = SWAMP -19.11
tsii = 6.09E-02 2221.99 66.66 CREEK 93.10 93097.75
PULLING DATA
PULLING WINCH CAP. (TON)
TOTAL REQUIRED BUOYANCY TO FLOAT PIPE SPREAD KP0.00 TO KP0.00 (MTon) === 93.098
Note:
Submerged unit pipe weight (kg) - Ws = Wcp + Waw - B
Ave. unit submerged wght of line pipe (kg/m) - Wsa = Ws / La
Prepared By:
Date: