Question 1 of 3

Review the image below. Melanie was asked to set up the phasing for a ducting
system. What does the ducting in red typically mean?


It is the existing ducting.

 It will be modified to the existing gray ducting.

Incorrect

 It will be demolished.

Correct

It will be new ducting.

Question 2 of 3
Jose changes the View Template to Plumbing Plan for two plumbing models under a
Floor plan. However, this changes the discipline. What should he do to set this up?


He should set the Discipline to Structural.

 He should set the Discipline to Mechanical.

Correct


He should set the Discipline to Architectural.

He should set the Discipline to Electrical.

Question 3 of 3
Vivienne arranged and added totals to the schedule of components shown below.
How did she do this?

You edited the properties for Sorting/Grouping and Filter.

 You edited the Appearance and Formatting.

Incorrect

 You edited the properties for Sorting/Grouping and Formatting.

Correct

 You edited the Fields and Formatting.

Incorrect