You are on page 1of 5

DOC NO

REVISION
SUMMARY COMPRSSED AIR LEAKAGE INSPECTION
AREA Building
DATE ISSUED 2/16/2022

Leak Flow Energy Looses Looses per month


NO MACHINE LEAK GRADE Picture (l/min) (kWh/month) (IDR/month) Status Repair Date

1 STU 01 Medium 40 172.8 207,360.00 Open

2 STU 01 Medium 38 164.16 196,992.00 Open

3 STU 03 High 67 289.44 347,328.00 Open


4 STU 03 Medium 56 241.92 290,304.00 Open

5 STU 05 Medium 21 90.72 108,864.00 Open

6 STU 10 High 120 518.4 622,080.00 Open

7 STU 10 Medium 58 250.56 300,672.00 Open

8 BTU 01 Medium 40 172.8 207,360.00 Open


9 BTU 01 High 140 604.8 725,760.00 Open

10 BTU 02 High 130 561.6 673,920.00 Open

11 BTU 03 High 81 349.92 419,904.00 Open

12 BTU 04 Medium 35 151.2 181,440.00 Open

13 BTU 05 Very High 200 864 1,036,800.00 Open


14 BTU 08 Medium 57 246.24 295,488.00 Open

15 BTU 09 High 71 306.72 368,064.00 Open

16 BTU 10 Medium 41 177.12 212,544.00 Open

17 BTU 013 Very High 180 777.6 933,120.00 Open

18 BTU 013 High 83 358.56 430,272.00 Open


Total 1458 6,299 7,558,272

Note:
Leak Grade Leak FLow (l/min)
Very High >150
High 60>Flow³150
Medium 20>Flow³60
Low Flow£20

Planned Check Total Machine Building + MRU 32


Aktual Check Total Machine Building + MRU 32
Total Leakage (Machine) 13
Total Leakage (Points) 18
Total Repair 0
Result Achievment Check 100%
Result Achievment Repair 0%