JINDAL POWER LIMITED, TAMNAR RAIGARH
4X 600 MW POWER PLANT
SOP FOR AIR PRE-HEATER
STANDARED OPERATION PROCEDURE
FOR
AIR PRE-HEATER
[JPL/600/SOP/17]
Issue Date: | 01.04.15
Revision No: 00 Date: | 01.04.15 | No of Pages
06
Prepared by: Lokpal Patel
Signature: Cpe.
Reviewed by‘ Ravindra Sonkusare _| Approved by: .R K Choudhai
Spat OGIO Tl soon Bees are
Designation: Dy. Manager
Designation: Asst. General Manager | Designation: General Manager
JPL4Xx600 MW SOP
Page 1] JINDAL POWER LIMITED, TAMNAR RAIGARH
4X 600 MW POWER PLANT
SOP FOR AIR PRE-HEATER
Amendment Record
‘Acknowledge
‘Amendment | Amendmen Description
by Reviewer
RevNo. | Page No. | t Pate
1 a
Page 2
JPL4X600 MW SOP] JINDAL POWER LIMITED, TAMINAR RAIGARH ]
nog 4X 600 MW POWER PLANT
SOP FOR AIR PRE-HEATER |
PURPOSE: This procedure is used as work instruction of Starting/Stopping of Air Pre-Heater.
‘SCOPE: This procedure is applicable to Air Pre-Heater located in JPL 4X60 MW.
RESPONSIBILITY: Boiler operator, Desk Engineer ,Unit control engineer& Shift In charge.
SPECIFICATION OF AIR PRE-HEATE!
GENERAL
No. per boiler / size 2.Nos. / 32.5 VIMT 2000 (72" PA)
HEATING ELEMENTS
Hot end heating elements
Element type 0.8 mm ~ DU profile
Element height 850mm
Material Carbon steel
Hot int, heating elements
Element type 0.8 mm —DU profile |
Element height 850 mm
Material Carbon steel |
Cold end heating elements |
Element type 1.2 mm —NF6 profile
Element height 300 mm
Materi Corten steel
ROTOR SEALS
Radial seals — Hot End 2.5 mm Corten A
Radial seals ~ Cold end 2.5 mm Corten A
Axial seals 2.5 mm Corten A
Bypass seals 1.6 mm Corten A
Rotor post seals HE & CE 6.0 mm IS 2062
ROTOR DRIVE ASSEMBLY
Motor 30 KW, 1500 rpm, 415 V, 3 phase, 50
He, Frame: 200 L
Speed Reducer Type 8APB, 3 input, down shaft
( M/s shanti Gears Itd
Fluid Coupling 14.5 FCU-Pembril / Fluiodomat
AUXILIARY DRIVE
Air motor M/s IEC Dusterloh
Coupling M/s Bibby Coupling type R24H
Solenoid Valve 230 V, 1 Phase, AC, 50 Hz~1” BSP
Pressure Switch 4% NPT (F), 0-10 ke/em2
Filter & Lubricator "BSP
BEARINGS
| Guide Bearing Spherical Roller 23192 / CAK/ C3/ W33
Taper Bore
Support Bearing Spherical Roller Thrust 294/850 EF
RTD 1” BSP (M) Duplex Thermo well
OIL CIRCULATION SYSTEM.
nn
JPL 4X600 MW SOP Page 3Jog
JINDAL POWER LIMITED, TAMNNAR RAIGARH
4X 600 MW POWER PLANT
Motor ~ Guide & Support Brg.
Pump
Filter
Cooler
Coupling
Pr. Gauge with needle valve
Flow switch
Dial thermometer with well
CLEANING DEVICE ASSY ~ LRNR
Motor
Nozzle travel & traverse speed
Steam pr, qty & blowing rate
Operating time ~ Forward + Return
Nozzles size
Blowing
FIRE SENSING DEVICE
Location
Make
SERVICE WATER CONSUMPTION
Water washing ~ hot end
Water washing ~ cold end
Deluge assy — hot end
Deluge assy ~cold end
STEAM COIL AIR PREHEATER
Number of SCAPH
Size of SCAPH
Installed Position
Design Pressure
Design temperature
Hydraulic Test pressure
Weight of one SCAPH
Supplier
SET POINTS
Lub Oil systems (Guide & Support Brgs)
Oil Flow Switch
Relief valve set pressure
RTD ~Start temperature of LOS
RTD ~Alarm temperature
Main drive assy ~ Air line components
Pressure switch ~ Before solenoid valve
Pressure switch ~ After solenoid valve
Fire sensing device
Alarm temperature
SEAL SETTING VALUES
Radial seals ~ Hot end inboard
JPL 4X600 MW SOP
‘SOP FOR AIR PRE-HEATER
0.75 kW, 3 ph, 1500 rpm, fr. 90S
Tushaco~ Delta, model: T35-25 / 46
John
Fowler / HP Values ~ 15 LPM
M/s united Heat transfer / Nasik
Love joy L095
M20 x 1.5; 0-10 kg/em2
Universal Flow monitors
%" BSP, O- 100 oC
0.25 kW, 3 phase, 415 V, 50 Hz
11860 mm & 90 mm / min
14 kg/cm’, 1135 kg & 54.94 ke/min
20.67 min + 20.67 min
12.5 mm (1 no.) & 16 mm (2 nos.)
Forward traverse only
Thermocouple ~ 12 + 12 point T/C
Gas outlet & Air outlet
M/s Pyrotech Electronic/ Udaipur
300 cum / hr / pipe
300 cum / hr / pipe
300 cum / hr / pipe
300 cum / hr / pipe
2'/ boiler
6000x3900x350
Horizontal
16 kg/cm?
210°C
30 kg/cm?
3650 kg/unit
M/s Patel Air Temp Pvt Ltd.
7LPM
5S kg/cm?
40°C
70°C
5 kg/cm? (g)
3 kg/cm? (g)
450°C
0.50 mm.
Page 4,JPL4X600 MW SOP
(| | JINDAL POWER LIMITED, TAMNAR RAIGARH
smog 4X 600 MW POWER PLANT |
‘SOP FOR AIR PRE-HEATER |
Hot end outboard 0.50 mm
Cold end inboard 0.50 mm
Cold end out board 29.5 mm
Axial seals Hot end 124mm
Cold end 7.1mm
By pass Seals ~ Hot end 6.6mm
Cold end 19mm
INDUCTION MOTOR
Make KIRLOSKER ELECTRIC CO. LTD
Power 30KW
Speed 1470
Volts 41sv
Current 52 Amps
| AIR MoToR
Make IEC DUSTERLOH PVT LTD.
Power 6.8KW
| RPM 3000 rpm
Air Pressure 6.33 ke/em2
Ratio 08:01:00
Output RPM 375 RPM
LUBE OIL SYSTEM
MOTOR
Make NGEF
Volts 415V
Current 70 Amps
| RPM 1400
KW 0.75
Pump
Make TUSHAKO PUMP PVT LTD.
Capacity 15LPM
Pressure 5 KG/CM2
PROCEDURE:
LINE UP PROCEDURE :
1) NoPTWis pending
2) AILAPH manholes are closed.
3) APH fire water MIVs are closed.
4) APH wash water MIVs are closed.
5) APH MOTOR module is ON and in remote.
| 6) GB, SB lube oil pumps (A, B) modules are ON and in remote.
7) At least one DMICW SG pump Is in service.
| 8) Atleast one Service air compressor should be running and air'pressure adequate.
9) Line-up cooling water to lube oil coolers. (DMCW supply and return MIVs are open )
10) Open lube oil pump suction valve, cooler outlet valve.
Page SJINDAL POWER LIMITED, TAMNAR RAIGARH
snag 4X 600 MW POWER PLANT
‘SOP FOR AIR PRE-HEATER
11) DMCW |/L and O/L MIVs for oil carry over probe should open’
12) Open air isolation MIV for air motor and ensure air pressure low switch is in reset condition.
| STARTUP:
1) Start Guide Bearing lube oil pump (Starts in AUTO at 40'c).
2) Start Support Bearing lube oil pump (Starts in AUTO at 40'c).
3) Start Air Motor and check AIR inlet solenoid valve opens in Auto.
4) Start APH Motor and observe that Air Motor Stops in Auto.
‘SHUT DOWN:
1) Flue gas temperature at APH inlet should be less than 90°C
2) Stop APH Motor.
3) Ensure Support Bearing lube oil pumps Stops when bearing temperature is below 38c.
4) Ensure Guide Bearing lube oll pumps stops when bearing temperature is below 38c.
ISOLATION PROCEDURE:
1) Close air motor air supply manual isolation valves ( Solenoid inlet, outlet , bypass )
2) Isolate the APH motor module.
3)_ Isolate Guide Bearing lube oil pumps (A, B) modules.
4)_ Isolate Support Bearing lube oil pumps (A, B) modules.
(CROSS REFERENCE: Air Pre-Heater Manual.
RECORDS: The records are maintained in field log book and in CCR log book
JPL 4x60 MW SOP Page 6