You are on page 1of 1
RAJAPUSHPA SUMMARY OF TOWERC i fi gy apo aie PS. cna of ha Poles = RAIAPUSHPA PROVINGIN ci Neng Fh : rig, a are er TOWER: € Tava area RCC form Work Guanes ; Savor | Cumatative Deseription Gradeot | “Concrete | SMUEEQY | Remarks TOWER AREAS — A Basemet-O4 to Baserent-03 1_[eLum pce 1p Cu ea 26431 2 frat - Gum 3525.08 1172.89 3 [cous WARDS WBS Cun 56889 2491.94 3 Slab Gum 19128 124655 3__]B-3 Spandral Beams ‘Cum 33.30 236003 @ _|[B-3 Beams Gum 66.63 455.32 7_[Staircase-1B4 10 BS ‘Cum “18 al §__[Staircase:2 B4 10 BS Cum aT 30.68 a Tasernet-03 to Basement 02 9 [Columns & Walls B-3 10 B2 Cam e028 ToT 10_|B-2 Slab Cum 188.02 1224.33 11 [B-2 Spandral Beams Cum 34.00 237.80 12 [8-2 Beams Cum Toat e815; 13 [Stairease-1 BS 10 B2 Cum 461 3028 14 |Staircase-2 B3 10 B2 [am 453 29.66 € Basemel-02 fo Bose TS__ [Columns & Walls B-2t0 B-l Cam 1556 T3391 16_]B=1 Slab [cum 190.92 1242.41 17 [B-1 Spandral Beams Cum 0.86 268.65 18 _[B-1 Beams Cum ois 3.08 19 |Stairease-1 B20 BI Cum 5.64 39.70 29 _[Staircase-2 8210 BL Cum) 6.03 4420 D Basemel-01 fo Ground Floor 31 |Cotumns & Walls B-1 vo Gr Cum 319.78 3505.14 32 |GF Slab Cum 17421 1309.66 23 _|GE Spandral Beams Cum $2.10 348.39 24 [GF Beams ‘Cum 263.95 1451.10 [Staircase-1 Bl to GF Cum 6.23 ae) ‘Cum 625 45.89 CBRE QS [Staircase-2 BI to GF RPPLOS PPL Incharge

You might also like