Name of the Company: M/s. RAJAPUSHPAPROPERTIES


PVT.LTD.

Project: "RAJAPUSHPAETERNA"at Puppalaguda, Hyderabad.

Subject: Water Proofing RECONCILIATIONSTATEMENTAS ON 01 December 2021

ArmGrout M45/M65 Coverage Remarks


Hydrocem (Kgs) Proofsol LWP
SLNO DESCRIPTION From 40mmto Coverage 1.5 Coverage
Upto 40mm dia
110mm pipe dia sqm/KG 100ml/50kg cement
pipe 0.008Kg/No.
0.022Kg/No.

Received Quantity 10.00 10.00 894.00 50.00

Work Done area As Per RA Bill 23.00 - 445.98 426.94

B Consumed Material 1.84 - 668.97 9.39

C Unbilled Quantity/(in Progress) 15.94 0.23

D Total Consumption, D=B+C 1.84 - 684.91 9.63

D PhysicalQty 4.00 4.00 200.00 35.00

E Wastage, E=A-D 4.16 6.00 9.09 5.37

F % Wastage, F = E/D % 552.17% 1.33% 55.82%

/~ ~
Contractor CBRE RPPL
RA-Ol

RA-02

-.-~~----~--~
4.66 '

RA-03
- _j
RA-Ol

RA-02

20.24 I
0.31 I
-0.33 i RA-03 I

-0.06 ;
CBRE
M
~I,~~!!~.~~;\
)O<~_.,

C OHT:

Chasing Opes/Drilling thr.onstruction joints and fixing nozzle at approximate I meter cl c or as per
requirements and grouting .. e same using cement slurry grout admixed with Cebex 100 @ 225
a grns/bags ofeement, Pro_ng and applying Hydrocem Flexible polymer modified cementitious Sqm 100.00 280.00 28,000.00 - -
coating sys_ applied in .. o coats at a total consumption of 1.5 kgs per sqm on the horizontal
surface pondilg with wala'lIl test water tightness. etc.

Providing aM laying sloprmaking concrete screed of average 75 mm using M 15 grade concrete


containing Faermesh SteM! e3 multi dimensional 100% virgin polypropylene fibers @ 0.6 Kg per
CU.Mt and Proofsol LWP@ lOOml per bag of cement with minimum thickness of 50 mm at the 3,900.00 - -
b Sqm 30.00 130.00
rain water o.IIet and a slapr of 1:120, making wattas at the junctions of horizontal and vertical
surfaces to a noat finish, \WI compacted, curing for 7 days etc. complete. (M15 grade concrete should
be supply fur of cost at silr),

Providing and applying 0. coat of acrylic based bond coat over the waterproofing membrane and
thereafter proriding and .."tying protective plaster of avg 25 mmthick on the verticle surface in 9,800.00 -
c Sqm 70.00 140.00
cement mor1ilr (1:3) incl .... g proofsollwp inegral waterproofing compound @ 100 ml per bag of
cement finishal smooth ewing for 7 days etc complete.

D Slab Below Swimming P.. Watelllroof"mR


ChemicleC_

Cleaning the sarface to o.,equirements and filling the water for 24 hrs to find out the leakages.
making smaD fillets (waltilS) around the periphery junctions and thereafter providing and applying
"Hydrocem" polymer modilied cementitious coating system applied in 2 coats at a total consumption
Sqm 360.00 280.00 1,00,800.00 233.45 65,366.114 233.45 65"l66.84
I of 1.50 Kg per Sq.Mt on ... horizontal surface and on the vertical surface upto 300mm above FFL
complete. Hydrocem has a eompressive strength of 13 N/mm2, tensile strength of 2.42 N/mm2 with
elongation capacity of 35% and is completely non toxic in nature [Note:· Actual treated area shall be
measured for payment]

Protective Coat:

Laying waterproof and prosective screed/plaster of avg 20mm thick on the floor and on the wall up to 54,000.00 214.41 32.16140 21441 32.161.40
2 Sqm 360.00 150.00
300mm height in eM (1:3) including mixing proofsol LWP @ 100ml per bag of cement.

E Brickbat Filling:

Filling sunken portion by providing and laying brickbat coba consisting of bricks, laid over a bed of
cement mortar (I:4), including Proofsol LWP integral waterproofing admixture @ 100 ml per bag of
cement, filling the joints in cement mortar (1:4) including Proofsol LWP @ 100 ml per bag of cement 60,000.00 7.12 8,545.35 7.12 1,545.35
1 Cum 50.00 1,200.00
and finishing on top with a screed of20 to 25 mm thick in cement mortar (1:4) including Proofsol
LWP @ 100 ml per bag of cement, keeping the surface broomed, curing and testing for water
lightness for 7 days etc. complete. eic., complete.

7,1W,375.00 1,68,752.00 33,88".2" 2,02,636.24


Grand Total Amount

Contractor ~ QS(CBRE)
«~.,,\-v...
QS(RPPL) SPM ACCOUNTS GM

Page 2 of 2
I .... "
____ ... I ._-,_., Ii' 11'" ~


CBRE
II
~~~~A
~~= .....
-
,"oject : Construction of Residential Apartments of Eterna PrOiert at PUPiJal82uda, Hvderabad.
lient : lajapushpa Properties Pvt., Ltd.
ontracler : Nina Percept Pvt. Ltd
~ature "Work: Waterproolin2 of Toilets, Utilities, Terrace and Below Swimmlnz Pool Slab Bottom Area
ItA Bill: 04
ABSTRACT
BOQ PREVIOUS PRESENT CUMULATIVE
a-rks
SNo. Description Amount
Unit Qty Rate Amount Quantity Amount Quantity Amount Quantity

A TOILET, UTILITY WATER PROOFING:


Bore Packing:

Grouting & sealing aroud the periphery of the pipes by polymer concrete admixed with Non shrink
1 grouting compound. Fixing the socket to the periphery of the pipe and grouting the socket by cement
slurry admixed with Pidicrete AM/ Intraplast N 200/ Cebex 100 @ 225 1200 gms per bag of cement.

a above 40 to 110 mm dia Pipe. Nos 60.00 225.00 13,500.00 - -


Nos 25.00 225.00 5,625.00 13.00 2,925.00 10.00 2,250.00 23.00 5,175.00
b Upto 40 mm dia Pipe.
Chemicle Coat:

Cleaning the surface to our requirements and filling the water for 24 hrs to find out the leakages.
making small fillets (wattas) around the periphery junctions and thereafter providing and applying
"Hydroeem" polymer modified cementitious coating system applied in 2 coats at a total consumption
Sqrn 550.00 280.00 1,54,000.00 138.96 38,909.20 73.57 20,599.04 212.53 59,508.24
2 of 1.50 Kg per Sq.Mt on the horizontal surface and on the vertical surface upto 300mm above FFL
complete. Hydrocem has a compressive strength of 13 N/mm2, tensile strength of2.42 N/mm2 with
elongation capacity of 35% and is completely non toxic in nature [Note:- Actual treated area shall be
measured for payment.]

Protective Coat:

laying waterproof and protective screed/plaster of avg 20mm thick on the 1100rand on the wall up to 82,500.00 138.96 20,84422 73.57 11,035.20 212.53 31,879.42
3 Sqm 550.00 150.00
300mm height in CM (I :3) including mixing proofsol l WP @ lOOml per bag of cement.

B TERRACEWATERPROOFING:

Cleaning the surface to our requirements and lilling the water for 24 hrs to find out the leakages.
making small fillets (wattas) around the periphery junctions and thereafter providing and applying
"Hydrocern" polymer modified cerncntitious coating system applied in 2 coals at a total consumption
I of 1.50 Kg per Sq.Mt on the horizontal surface and on the vertical surface upto 300mm above FFl Sqm 550.00 260.00 1,43,000.00 -
complete. Hydrocem has a compressive strength of 13 N/mm2, tensile strength of 2,42 N/mm2 with
elongation capacity of 35% and is completely non toxic in nature [Note:- Actual treated area shall be
measured for payment.]

laying brickbat coba ofa total average 115 mm thick laid to a slope of 1:120 with minimum
thickness of 50 mm at the rain water outlet all in c.m. (I :3) including Proofsol LWP integral
waterproofing admixture @ 100 ml per bag of cement, with smooth finish with false square marking 1,29,250.00
2 Sqm 550.00 235.00
of 300mm x 300 mm, or kept broomed to receive further finish, as directed, including making wattas
at the junctions of ODor and walls including curing and testing for water tightness by ponding with
water for 7 days etc. complete.
• .. _, J


CBRE
RAJAPUSHPA
rlf,'_H'~,,~~::
L,~ev-r.i..·H)
j!l .•.
"·'..·i&:o<;', .."';,I<I$<..... "

Date: 11-12-2021
Name of the Company : Rajapushpa Properties Pvt. Ltd.
Name of the Proiect : Eterna, Hvderabad.
SubJect: Abstract for Water Proofing - Club House RA - 04

Stalldard Previous Present Cum Remark


h I· ...... , '"," Work.,; .' Unit
""ciF~';"" I'
TOILETS
1 Ground Floor Sqm 56.21 58.12 55.21 55.21 95%
2 First Floor Sqm 56.64 58.12 55.21 55.21 95%
3 Second Floor Sqm 0.00
4 Third Floor Sqm 30.21 30.04 28.53 28.53 95%

5 Fourth Floor Sqm 0.00


6 Fifth Floor Sqm 56.77
Grand Total Sqm 146.28 138.96 0.00 138.96
BALCONY
1 Ground Floor Sqm 0.00 #DIV/Ol
2 First Floor Sqm 29.12 18.60 17.67 17.67 95%

3 Second Floor Sqm 29.12 18.60 17.67 17.67 95%


4 Third Floor Sqm 0.00 #DIV/Ol
5 Fourth Floor Sqm
6 Fifth Floor Sqm
Grand Total Sqm 37.20 0.00 35.34 35.34
Car Wash Area Sqm 58.95 40.24 38.23 38.23 95%

Grand Total Sqm 40.24 0.00 38.23 38.23


Grand Total 138.96 73.57 212.53
SWIMMING POOL BOTTOM
Main Pool Sqm 321.20 245.74 233.45 0.00 233.45 95%
1
2 Kids Pool Sqm 29.97 0.00 #DIV/OI

Grand Total Sqm 245.74 233.45 0.00 233.45


Released Qty 95% 0% 95%
CBR.E

Name of the Com les Pvt. Ltd.

Eterna erabad.

Su STATUS of Bore Packin

1 G .FLOOR 9 0

2 1st FLOOR 4 0 3

3 2nd FLOOR 2

4 3rd FLOOR

5 4th FLOOR

6 TERRACE

7 ABOVE TERRACE

8 B-1 CAR WASH AREA 5

TOTAL 13 0 0 0 0 0 5 0 5 0

Contractor RPPL
••
)

C.BR
RAJAPUSHPA
f'f;.{.Jf:;"JtTt;;:\. j~~~r,
~,1"%1_
"'U,f"~t htflrt1~'1l;t

Name of the Company: Rajapushpa Properties Pvt. Ltd.

Name of the Project: Eterna, Hyderabad.

Subject: STATUS of Water Proofing for Club House


RA04

1 G .FLOOR 1 1 1 1

2 1st FLOOR 1 1 1 1

3 2nd FLOOR

4 3rd FLOOR 1 1 1 1

5 4th FLOOR Main Swimming Pool Bottom

6 Terrace

7 Above Terrace

7 Other Car Wash Area Present

TOTAL 3 3 3 2

Contractor RPPL
._,
CBRE
~~~~~A
.~~

11-12-2021
Rajapushpa - Eterna

Work Order for Supplying & Applying of Waterproofing Works for Toilets, Balconies, Utilities, Terrace,OHf and below Work Order
Package Rs. 7,84,375.00
Swimmirc pool slab bottom areas - Club House Value
Change
Rs
Order(s) Value
C-ractor MIs. NINAPERCEPTPVTLTD
Total 7,84,375,00
Rs
Commitment
P.IJ./W.O. Details of Payment
Eterna/WO/39/2019-2O, Dt: 1~3-202O
No. & Date
Payment Advice Details ((BRE) Payment Details

This bill certified gross Recovery Ie)


Work 0I*f Value Cheque Amt Statutory Net
Description amount Net Amount Cheque
Ia) Payment Advice No.& Date Already Certified Deduction's Amount
Mobilization Material A=lb-e) Details
Ib) Other WitIIholds Id) leI B~ Id +e)
Advance Advance Amount

~----~------ ..
-----~---.-----.---+------------------------.---+--------.~.-----~-------4--.-------+---------~----------r_----4_-------4_------+_----~~----~
_ .... ________
....
__j.__----------------- . -+ +-__.__.~!-------_+--------_+--------_+_--------+----+------+__----_+------j.__--___1
~----~---.------+-----------_+------------------------+--------+--------j.-------4---------+--------+---------+-----+------+------+------+------+-----~
: :,:: ::~f,:::::+::::: :~::::=;,:=:- E: ~;~:----- .-- ---~; ~:~:~::: ---:~.-:-:--~:-~-~~-.:-~--+--.--
.--

~2i1:::~t~~~
~--------+--------j--------+--------j
RA.BiII- 3 INR7,84,375.00 INR1,19,468.29 PA/RPPL/WO/39/2019-20/RAB/03 INR5,973.41 L INR5,973.41 INR1,07,521.46
- ------ ------------- j~~'_::::-
. --INR 33,884.24 .!_A/RPPL/WO/39/2019-20/RAB/04=~'·I: 1~~694 -I.-=- - I INR1,694.21 ~ INR30,495.82

-=-- -------- - -- - ..------ I. -= 1----·----.----~ -~:------- --


Total ~ ':1
Format No. fOl4-8C·Fr+~O/Rev02/Aug2017
INR2,02,636.24 - '-- -- -.--- -- ----- --- "w.nLD' .. .:;. I .. o.oo f •• "" •." ._-..... - h~...,.m.,t;...-.~- .;~- .".•,.1".. ~+-------+.-------

RPPL
Contractor


CBRE
R,:.!!~~.~~~~"A
,~I!..I{'.""Sj"",.....".,.'"

Vendor Payment Advice


ProJect: RIJlpushpl • ETERNA Billed To:
Addressed To:
CBRESouth Asia Pvt. Ltd. M/s. Rajapushpa Properties Pvt., ltd.
Unit No.1-A, 1st Floor, ORWEll, Salarpuria Knowledge " Rajapushpa House" Plot No. 34, Silicon Valley, Madhapur,
City, Raidurg I Hyderabad- 500 081, India. Hyderabad.

Work Order for Supplying & Applying of Waterproofing Works


Package for Toilets, Balconies, Utilities, Terrace,OHT and below Running Account Bill No: 4
Swimming pool slab bottom areas - Club House
Payment Advice PA/RPPl/WO/39/2019-
Contractor M/s. NINA PERCEPTPVT lTD
Ref. No. 20/RAB/04

PO / WO Ref. No. Eterna/WO/39/2019-20, Dt: 19-03-2020 Original Contract Sum ~ 7,84,375.00

Contract Value ~ 7,84,375.00 Net Change Order Value

Vendor Invoice No. Dt: 05-12-2021 Contract Sum To Date ~ 7,84,375.00

PAYMENT DETAILS (All figures are in INR)

SINo. DESCRIPTION UPTO lAST Bill THIS Bill CUMULATIVE TO DATE

1 VALUE OF WORK DONE


--- ----- - -- -- --

1.1 Certified Invoice Value 1,68,752.00 33,884.24 2,02,636.24


~--- -- _---- -- -- -

1.2 GST @ % (as applicable) --- ----- --- - -


-
---

1.3 CGST@ % (as applicable) - ._- ------------- ---- - - -

1.4 SGST@ % (as applicable) _


- f------- ..._-- ---- ----

1.5 IGST@ % (as applicable) -----_ .. ------_ ..,,--- --- --


-

Total payable amount (A) Rs. 1,68,752.00 Rs. 33,884.24 Rs. 2,02,636.24

2 RECOVERIES
------------- -_._. -----'" -------_-
2.1 Mobilization Advance to be Deducted Prorata . ---- ------ -- - . _-- - ---

2.2 Secured advance against material ----- --- -- -----,. -------_ --_---- -
--_"-_.--
2.3 ,Retention money @ 5% to be deducted prorata 8,437.60 1,694.21 10,131.81
---_ ..-'_.-
-- --------- ------ ----- ----- - _.'_-- ----

2.4 IWith held upto submission of Guarantee Certifiacte @ 5% 8,437.60 1,694.21 10,131.81
-- -- -- ------- ---- ---- -----
2.5 Material issued by client -------- --- - ------_.-

2.6 Non-Compliance Deductions: _'.,----


-- ----- - ---

a) Against EHS -- -- ---

b) Against Quality
Total Deductions(8) Rs. 16,875.20 Rs. 3,388.42 Rs. 20,263.62
,., .... . ,.
Net Payaole Amount (AS'~) j'
Rs.1,S1,877.00 Rs. 30,496.00 Rs. 1,82,373.00

Details of Bank Guarantees Bearing No. Valid upto Issulng_>\_utt1o!_Ity_ ---- Remarks
--------- -
Mobilization Advance - .. -----
-
------ --_----

Performance -- --_ ...._-- .- ------'_ ---------

Security/Retention -
------

Details of Insurances - _._.--- ----- ._----------- ----- ----

Contractor's All RiskPolicy Not applicable as per PO


---------_---- --- ----_----------- -----

Workman's Compensation - As informed by Client, RPPLtaken the policies on behalf of


Third Party Liability - -- Contractor.

We have not deducted TDS,Mobilization & any advances,and other applicbale Statutory deductions may kindly be made at your end before releasing the
Note:
Payment
We have not considered any taxes pleasemade at your end before releasingthe payment.

We hereby tertify that under the terms of the alreement, an amount of INR30,496.00/- (RupeesThirty Thousand Four Hundred and Ninety Six Only) is payable to M/s.
NINA PERCEPT PVT LTD.,
I
Verified & Certified By :
Prepared bv II~
CBRE CBRE ~'
N.",.i Mol'I.",,,,.d All Name: Shaik Ashraf Ali
Designation: SPC-QS
Date: 11.12.2021 .
U~ Designation: DGM
Date: 11.12.2021
if fI It{ 21
Format No.F014-BC-Fr-049/Rev02/Aug 2017
CBRE
RA,APUSHPA
1'1WI'LRTlllSI'•.-t..rrn,
..-'JUI',""',.I;Jmh.w.1ri't-"'.f

RA BILLNo : 04

SNo ...~.. / u .Ac:tvity· H i


Oate&Time Remarks / Signatures
•••••••
Submissionof RA04 by Mis. Nina Percept Pvt Ltd.,. From

1 ID-Dec-21
RPPlto CBRE.
2 Corrected Bill with certifiable amount sent to RPPl. ll-Dec-21
Format No. FOl4-BC-Fr-Q48/Rev02/Aug2017

Contractor CBRE RPPl


CBR

Rajapushpa - ETERNA
Package: Work Order for Supplying & Applying of Waterproofing Works for Toilets, Balconies, Utilities,
Terrac:e,OHT and below Swimmin 01 slab bottom areas- Club House
Vendor: Mis. NINA PERCEPTPVT LTD RA-04

P.O. I W.O. No. & Date: Eterna/WO/39/2019-20, Dt: 19-03-2020


Date of
SI.No. Document Enclosed No. of Pages Attestation
Approval

1: A Rajapushpa Properties Pvt., Ltd.- HO


.9:!
U
8 Rajapushpa Properties Pvt., Ltd.- SO
1 RA Bill Certification ProcessTracker 1

2 Payment Advice 1

3 Reconciliation Sheet
4 Unit Rate Verification
5 Quantity Certification

6 Quality Certification 1

7 Invoice Covering Itr. Enclosed

8 Invoice copy (NSC)

9 Measurement Sheets j Attachments 1

10 Delivery Challans
11 'ESIChalian
'-
o 12 'PF Challan
'0
C
Q)
> 13 Muster Roll
14 Form V
15 PAN No.
16 GSTINjUIN
17 CARPolicy no.
18 Workmen's Compensation Policy no.
(in addition to the above)

1 Copy of Substantial Completion Certificate

~ Copy of HOTOcertificate signed by Client,


CBREand Vendor
'-
o 3 Copy of Technical Documents Handing Over
'0
C
Q)
Certificate for the
> 4 I· Original Full and Final no claim certificate
from Vendor on their letter head
5 I Original Site clearance certificate - issued
I CBRE& Client
[Orlgtnal No dues certificate or any debit note
6
[from Client
Format No. F014-BC-Fr-047/Rev02/Aug2017
ABSTRACT

Description

Providing and laying slope making concrete screed of average 75 mm using M20 grade concrete
containing Fibermesh Stealth e3 multi dimensional 100% virgin polypropylene fibers @ 0.6 Kg per
03 Civil Finishes! Water Proofing Cu.Mt and Procfsal LWP @ 100ml per bag of cement with minimum thickness of 50 mm at the
Works
rain water outlet and a slope of 1:120, making wattas at the junctions of horizontal and vertical c.oc 30.0000 0.00 0.00 o
surfaces to a float finish, well compacted. curing for 7 days etc. complete. (M20 grade concrete
should be supply free of cost at site) (Free issue: Cement, Sand & M-20) Mode of Measurement:
area shall be Measured.
applying one coat acrylic based bond coat over the waterproofing membrane and
providing and applying protective plaster of average 25 mm thick on the vertical surface
03 Civil Finishes! Water Proofing i mortar (1 :3) inctuding Proofsol LWP integral waterproofing compound @ 100 mt per bag
Works finished smooth, curing for 7 days etc. complete. (Note. Actual treated area shall be 0.00 70.0000 0.00 0.00 o
for payment) (Free issue: Cement, Sand & M·20) Mode of Measurement: Treated area

360.00 100800.0000 0.00 233.45

I . laying waterproof and protective screed/plaster of average 20mm thick on


and on the wall up to 300mm height above FFL in cement mortar (1 :3) including and
03 Civil Finishes! Water Proofinq "H:UL'~~;UL lWP liquid integral waterproofing admixture@ 100ml per bag of Cement,
Works watas at the junctions of floor and wall, keeping the surface broom finished to receive 360.00 54000.0000 0.00 214.41
for 7 days etc., complete. (Free issue: Cement & Sand) Mode of
area shall be Measured.

0.0000

03 Civil Finishes! Water PrOOfing


Works 50.00 60000.0000

Contractor Accounts Department AGMIDGM GM Projects VP Projects

Page 2 of 2
ABSTRACT
Nina Upto
Percept I \\'9 784375.0000 Prev Bill 49,281 This Bill 33885 Abstract 1)81775 Bill No Bill no: 04/04
Work Order No: WO/Elcn020-211149 Contractor
t~:~~~veoS! Am! Am! '...-2~j..!.

APUSHPA WODate:
Mar19,
2020 - Oct
WO
Value
Prev Bill
Amt
119464 up~:tte 1
""
202,630 Status
Abst.
Date
Dec 20,2021
31,2021
CLUB HOUSE
Sub Project Name:
WO Rate for WO.Qty WOAmnt Upto Pre. Balance This Bill Upto UptoPrev This Bill UP!o BOQRemarks
BOQ CATEGORY Description Unit
BOQ Bill Qty Qty Qt\' Date Qty BiIIAmt Am! Date Am!

S:..p:iy & ApplYing of Water Proofing works fer Toilet, Utilities, Terrace, OHT and Belew Swimming 0.0000 0.00 0.0000 0.00 0.0000 0.00 0.00 0 0 0
03 Civil Finishes! Wa!er Procfmq Sqm
Works Pool Slat: Areas etc.
0.0000 0.00 0.0000 0.00 0.0000 0.00 000 0 0
03 Civil F;'1ishesl Water Prccfinq Tenets. Utii;ty water Prcofirg scro
Works
BORE PACKING: Grouting and sealing around the periphery of the pipes by polymer concrete
admixed with non-shrink grouting compound. Fixing the socket to the periphery of the pipe and 0.00 0.0000 0.00 0.0000 0.00 0.00 0 0
03 Civil FinishesJ Water Proofing Nos 0.0000
Works grouting the socket by cement slurry admixed wit~; PIOICRETE AMIINTRAPLAST N 20C ICEBEX
100@ 225/200 gms per bag of cement. (Free issue: Cement & Sand)
03 Civil Finishesl Water Proofing Nos 225.0000 60.00 13500.0000 0.00 60.0000 0.00 0.00 0
Above 40 to 110 mm dia Pipe
Works
25.00 5625.0000 13.00 12.0000 10.00 23.00 2,925 2,250 5,175
03 Civil Finishes/ Water Proofing Up to 40 mm dia Pipe Nos 225.0000
Works
CHEMICAL COAT: Cleaning the surfaces, grouting all construction joints/cracks, etc. with cement
slurry admix with non-shrink grouting compound, making nnetsjwatas) at the Junctions of floor and
walls and thereafter providing and applying NINIA '5 "Hydrocem" flexible and elastic, two 73.57 212.52 38,906 20,600 59,506
03 Civil FinishesJ Water Proofing Sqm 280.0000 550.00 154000.0000 138.95 411.0500
component, polymer modified, cementatious coating system applied in two coats in the form of
Works slurry at a total consumption of 1.50 Kg/Sqm. over the RCC slab and on vertical surfaces up to a
height of 300mm above FFL, ponding the floor with water, for 3 days to test water tightness etc.
complete. (Free issue: Cement & Sand) Mode of Measurement; Treated area shall be Measured.
PROTECTIVE COAT: Laying waterproof and protective screed/plaster of average 20mm thick on
the floor and on the wan up to 300mm height above FFL in cement mortar (1 :3) including and
mixing PROOFSOL LWP liquid integral waterproofing admixture@ 100ml per bag of Cement, 550.00 82500.0000 138.95 411.0500 73.57 212.52 20,843 11,036 31,878
03 Civil FinishesJ Water Proofing Sqm 150.0000
Works making watas at the junctions of floor and wall, keeping the suriace broom finished to receive
further finishing, curing for 7 days etc., complete. (Free issue: Cement & Sand) Mode of
Measurement: Treated area shall be Measured.
TERRACE WATERPROOFING: Cleaning the surfaces, grouting all construction joints/cracks, etc.
with cement slurry admix with non-shrink grouting compound, making fillets(watas) at the junctions
of floor and walls and thereafter providing and applying NINA's "Hydrocem" flexible and elastic, two
03 Civil Finishes! Water Proofing component, polymer modified, cernentatious coating system applied in two coats in the form of 260.0000 550.00 143000.0000 0.00 550.0000 0.00 0.00 0 0 0
Sqm
Works slurry at a total consumption of 1.50 KglSqm. over the RCC slab and on vertical surfaces up to a
height of 300mm above FFL, ponding the floor with water, for 3 days to test water tightness etc.
complete (Free Issue: Cement, Sand & Brickbats) Mode of Measurement: Treated area shall be
Measured
Laying brickbat coba of total average 115mm thick laid to a slope of 1:120 with minimum thickness
of 75mm at rain water outlet a!: ir. CM(1 ;3) including PROOFSOL LWP integra! waterproofing
compound admixture @ 100ml per bag of cement, with smooth finish with false square marking of 0.00 0 0 0
03 Civil Finishesl Water Proofing 235.0000 550.00 129250.0000 0.00 550.0000 0.00
300mm x 300mm, or kept broom to receive further finish, as directed, including making watas at the Sqm
Works junctions of floor and wall including curing and testing for water tightness by pending with water for
water tightness by ponding with water for 7 days etc. complete. Mode of Measurement: Treated
area shall be Measured. (Free Issue: Cement, Sand & Brickbats)
03 Civil Finishes/ Water Proofing 0.0000 0.00 0.0000 0.00 0.0000 0.00 0.00 0 0 0
OHT Tank Sqm
Works
Chasing open/Drilling the construction joints & fixing nozzles at approximate 1.0mtr c/c or as per
our requirement and Grouting the same using cement slurry grout admixed with CEBEX 100 @225
grams/bag of cement. Providing and applying "Hydrocem" flexible polymer modified cementitious 100.00 28000.0000 0.00 100.0000 0.00 0.00 0 0 0
03 Civil Finishes/ Water Proofing Sqm 280.0000
Works coating system applied in 2 coats at a total consumption of 1.5 Kg per Sq.Mt. on the horizontal
surface, ponding with water to test water tightness etc. complete. (Free issue: Cement, Sand & M-
20) Mode of Measurement: Treated area shall be Measured.