Professional Documents
Culture Documents
1 M/s Projexive 2250/= Include 2050/= 16 SWG 950 R.ft 1,947,500/= 3,054 R.ft 6,260,700/= 12x15x12 As Per Cover Area
2 M/s Total Service 1750/= Include 24 SWG 950 R.ft 1,66,2,500/= 3,054 R.ft 5,344,500/= 12x15x12 As Per Cover Area
3 Z.M Engineering. 440/= 24 SWG 950 R.ft 418,000/= 3,054 R.ft 1,343,760/= 12x15x12 As Per Cover Area
DESCRIPTION OF CIM :
• Total Cover area of Roof 80 x 160 = 12,800 sq.ft
• One section ondoline Shed size = 80 x 20 1600 sq.ft
• Eight Drainage system from Grad numbers = 80 x 8 = 640 R.ft ___ __ __ __ __ __
• One branch at Grad ( C ) = 160 R.ft
• Downspouts = 150 R.ft
• Total Measurement of Drainage system = 950 R.ft
DESCRIPTION OF CIF :
• Total Cover area of Roof 154 x 137 = 21,098 Sq.ft
• Eight Drainage system from Grad (2 to 9) numbers = 154 x 8 = 1,232 R.ft __ __ __ __ __ __
• Branches at Grad ( A to E ) = 137 x 6 = 822 R.ft
• Downspouts = 1,000 R.ft
• Total Measurement of Drainage system = 3,054 R.ft
Note :
• PPGI Sheet Size. 1 meter by 3 meter.
• One section ondoline Shed size = 1600 sq.ft .
• 20 Years Color coat Warranty .
• Sheet material Warranty 25 to 30 years .
• PPGI Installation warranty 01 year by Contractor.
• 0.5mm nominal thickness (24 gauge )
Drainage system :
Supply and Fixing of Gutters made of non-insulated Polyester Pre-Painted Galvanised Iron
Sheeting (Galvanised, not less than 80 gsm/sq.m, of 0.5mm nominal thickness (24 gauge ).
The outside face (exposed faced) shall be permanently color coated with polyester paint of 2050/= (24
2 DFT 20 microns (25 micron = 1 mm) .inner side (internal face) shall be coated with same paint
Rft 950
SWG)
1750/= (24 SWG)
of minimum DFT 10 microns (25 micron = 1 mm) with all fasteners and fixtures,scaffolding etc.
complete at all heights as per drawings and specifications including preparationof bill of
materials & shop drawings. Sheet Size. 1 meter by 3 meter 20 Years Color coad Warranty
1 Maintenance of wall with 5'' Block Masonry and Plaster on masonry work plaster thicness 1'' to 1.5'' . Ratio : 1 :3 1,25,000/=
2 Cemented Taper enclosed with wall and maintenance roof for the protection of rain water.Ratio : 1:3
3 Repairing of Gate Fram, alignment of relling over , downpanel work and welding work. 2 50,000/= 1,00000/=
5 Ms Railling for Barrication 450 R.ft 450 300/= 135,000/=
5 Walkway at CIM Roof 80' x 2' = 160 (8) sq.ft R.ft 1,280 300/= 384000/=
744,000/=
Heavy Rainfall recorded during the wet spell of September 2014.
Heavy rainfall of more than 200 milimeter (7.9 in ) recorded during the wet
spell of september 1 to 5 2014 in Pakistan based on data from the Pakistan
Meteorological Depart .
Rainfall Rainfall
City Stations Province
(mm) (in)
Islamabad Golra Sharif 211 8.3 Islamabad Capital Territory
Chaklala
Rawalpindi 345 13.6 Panjab
(Islamabad Airport)
Please Note : The contractor observes that 12x15x12 drainage is sufficient for this 557
mm rainfall.