You are on page 1of 32

ATDMC

AIP, MEASUREMENT SHEET


Landhi,Karachi. 6th Running Bill

S.No Description Unit No L B H Quantity


3 Door frame

Pantry D-7 1 18.00 1.00 18.00


Ladies toilet D-8 1 18.00 1.00 18.00
Exicutive toilet D-7 1 18.00 1.00 18.00
Exicutive toilet D-9 4 7.00 1.00 28.00
Exicutive Locker D-7 1 18.00 1.00 18.00
Exicutive lockert D-9 4 7.00 1.00 28.00
DB wall D-10 1 21.00 1.00 21.00
Inspection room D-6A 1 18.50 1.00 18.50
Open office D- 5 2 18.50 1.00 37.00
Meeting room 1 D - 6 1 18.50 1.00 18.50
Reception D - 4 1 18.50 1.00 18.50
Reception D - 6 1 18.00 1.00 18.00

Total 259.500

4a Oak play vision panel shutter


985mm wide
Reception D - 4 ( Solid with
Vision) 985mm 1 1.00 1.00 1.00

Total 1.000
4b Formica finish vision panel
shutter 900mm wide
Inspection room D-6A ( Solid with
Vision) 909mm 1 1.00 1.00 1.00
Open office D- 5 ( Solid with
Vision) 909mm 2 1.00 1.00 2.00
Meeting room D - 6 ( Solid with
Vision) 909mm 1 1.00 1.00 1.00

Total 4.000

06/14/2021 Page 1 of 32 Arch Hall Qty (2)


ATDMC
AIP, MEASUREMENT SHEET
Landhi,Karachi. 6th Running Bill

S.No Description Unit No L B H Quantity


4b Formica finish vision panel
shutter 760mm wide
Reception D - 6 ( Solid with
Vision) 760mm 1 1.00 1.00 1.00

Total 1.000

Formica finish vision panel


4c shutter with louvers 760mm
wide
Pantry D-7 (Vision with louver)
760mm 1 1.00 1.00 1.00
Ladies toilet D-8 (Solid core)
760mm 1 1.00 1.00 1.00
Exicutive toilet D-7 (Vision with
louver) 760mm 1 1.00 1.00 1.00
Exicutive Locker D-7 (Vision with
louver) 760mm 1 1.00 1.00 1.00

Total 4.000

4d Formica finish without vision


panel shutter 760mm wide

4e Formica finish change/rest room


shutter 675mm wide
Exicutive toilet D-9 (Solid core)
675mm 2 1.00 1.00 2.00
Exicutive lockert D-9 (Solid core)
675mm 2 1.00 1.00 2.00

Total 4.000

4f DB wall D-10 ( Solid with louver)


954mm 2 1.00 1.00 2.00

Total 2.000

06/14/2021 Page 2 of 32 Arch Hall Qty (2)


ATDMC
AIP, MEASUREMENT SHEET
Landhi,Karachi. 6th Running Bill

S.No Description Unit No L B H Quantity

5 M.S Openable Door


Reception D - 1 ( Solid with
Vision) 985mm 1 3.50 7.00 24.50
CI Foundary toilet D-2 ( Solid with
Vision) 909mm 1 3.17 7.00 22.19
Inspection room D-3 ( Solid with
Vision) 1025mm 1 7.00 7.00 49.00
Locker room D-2A (Vision with
louver) 909mm 1 3.17 7.00 22.19
Washroom lobby D-2A (Vision
with louver) 909mm 1 3.17 7.00 22.19

Total 140.070

8 Door Closers for MS door


Reception D - 1 ( Solid with
Vision) 985mm 1 1.00 1.00 1.00
CI Foundary toilet D-2 ( Solid with
Vision) 909mm 1 1.00 1.00 1.00
Inspection room D-3 ( Solid with
Vision) 1025mm 2 1.00 1.00 2.00
Locker room D-2A (Vision with
louver) 909mm 1 1.00 1.00 1.00
Washroom lobby D-2A (Vision
with louver) 909mm 1 1.00 1.00 1.00

Total 6.000

12 Paneling (Polyurethane polish


finish)
Meeting room 1 9.00 9.00 81.00
Reciption room 1 6.00 9.00 54.00

Total 135.000

06/14/2021 Page 3 of 32 Arch Hall Qty (2)


ATDMC
AIP, MEASUREMENT SHEET
Landhi,Karachi. 6th Running Bill

S.No Description Unit No L B H Quantity


17 Gypsum Board Ceiling

Meeting room 1 1 12.00 ### 222.00

1 14.00 0.75 10.50


Reception 1 10.50 ### 126.00
Meeting room 2 1 12.00 7.50 90.00
Staff locker room 1 14.50 ### 174.00
Open office 1 19.00 7.50 142.50

1 31.00 ### 651.00

1 31.00 8.00 248.00

1 27.00 2.50 67.50


Dsign section 1 12.00 ### 120.00
Inspection room 1 21.00 ### 399.00
Exicutive toilet lobby 1 7.50 7.00 52.50

1 13.00 5.00 65.00


Exicutive Locker 1 18.00 7.00 126.00
Total 2,494.000
18 Water Resistant Ceiling

Pantry 1 8.00 7.00 56.00


Ladies toilet 1 7.00 7.00 49.00

1 7.00 2.00 14.00


Exicutive toilet 1 12.00 7.00 84.00
1 7.00 2.00 14.00
Staff toilet lobby 1 4.00 4.00 16.00
Staff toilet 1 10.00 5.00 50.00
1 23.00 ### 345.00
1 15.00 2.00 30.00
1 10.00 2.00 20.00
CI Foundary toilets 1 42.00 ### 546.00
Total 1,224.000

06/14/2021 Page 4 of 32 Arch Hall Qty (2)


ATDMC
AIP, MEASUREMENT SHEET
Landhi,Karachi. 6th Running Bill

S.No Description Unit No L B H Quantity


23 Porcelain Tiles

Meeting room 1 1 12.00 ### 228.00

1 14.00 1.00 14.00


Reception 1 10.50 ### 126.00
Meeting room 2 1 12.00 7.50 90.00
Staff locker room 1 15.00 ### 180.00
Open office 1 19.00 7.50 142.50

1 31.00 ### 651.00

1 31.00 8.00 248.00

1 27.00 2.50 67.50


Dsign section 1 12.00 ### 120.00
Exicutive toilet lobby 1 7.50 6.50 48.75

1 13.00 5.00 65.00


Exicutive Locker 1 18.00 6.25 112.50

Total 2,093.250

24a Marble fixing on Door Threshold

Meeting room 1 1 3.17 1.00 3.17


Reception 2 3.50 1.00 7.00
Meeting room 2 1 2.75 1.00 2.75
Staff locker room 1 3.17 1.00 3.17
Open office 1 3.17 1.00 3.17
Inspection room 1 3.17 1.00 3.17
Staff toilet lobby 1 3.17 1.00 3.17
Staff toilets 8 2.50 1.00 20.00
Paintry 1 2.75 1.00 2.75
Ladies toilet 1 2.75 1.00 2.75
Exicutive toilet 1 2.75 1.00 2.75

06/14/2021 Page 5 of 32 Arch Hall Qty (2)


ATDMC
AIP, MEASUREMENT SHEET
Landhi,Karachi. 6th Running Bill

S.No Description Unit No L B H Quantity


Exicutive toilet 2 2.50 1.00 5.00
Exicutive Locker 1 2.75 1.00 2.75
Exicutive Locker 2 2.50 1.00 5.00
CI Foundary toilets 1 3.17 1.00 3.17
CI Foundary toilets 14 2.50 1.00 35.00

Total 104.770

24b Marble Window sill

Meeting room 1 1 13.00 1.00 13.00


Reception 1 5.00 1.00 5.00
Open office 1 13.00 1.00 13.00
Inspection room 1 5.00 1.00 5.00

1 8.00 1.00 8.00

Total 44.000

25 MS Sliding door

D - 12 1 14.00 ### 184.38


D - 12A 1 7.17 9.75 69.91

Total 254.288

06/14/2021 Page 6 of 32 Arch Hall Qty (2)


ATDMC
AIP, MEASUREMENT SHEET
Landhi,Karachi. 6th Running Bill

S.No Description Unit No L B H Quantity

26 Internal Paint

26a Distemper Paint.

Grid A - C / 9 1 85.00 ### 1,700.00


Window jam 4 11.00 1.00 44.00
Deduction window -4 7.00 2.00 (56.00)
Window jam 4 16.00 1.00 64.00
Deduction window -4 4.50 3.50 (63.00)
Grid A / 2 - 3 1 155.00 ### 3,100.00
Window jam 5 11.00 1.00 55.00
Door jam 1 13.00 1.00 13.00
Deduction window -5 7.00 2.00 (70.00)

-1 3.00 6.50 (19.50)


Window jam 7 16.00 1.00 112.00
Deduction window -7 4.50 3.50 (110.25)
Grid C / 2 - 9 1 154.00 ### 3,080.00
Window jam 5 11.00 1.00 55.00

2 7.50 1.00 15.00


Door jam 1 18.00 1.00 18.00
Deduction window -5 7.00 2.00 (70.00)

-2 3.75 2.00 (15.00)

-1 12.00 3.00 (36.00)


Window jam 6 16.00 1.00 96.00
Deduction window -6 4.50 3.50 (94.50)
Sinage wall 1 32.00 4.00 128.00
Grid A - C / 3 - 4 1 87.00 9.00 783.00
Window jam 2 16.00 1.00 32.00

1 16.00 1.00 16.00


Door jam 1 7.00 1.00 7.00

06/14/2021 Page 7 of 32 Arch Hall Qty (2)


ATDMC
AIP, MEASUREMENT SHEET
Landhi,Karachi. 6th Running Bill

S.No Description Unit No L B H Quantity

1 11.00 1.00 11.00


Deduction window -2 12.67 1.00 (25.34)

-1 5.00 1.00 (5.00)

-1 3.17 1.00 (3.17)

-1 7.00 1.00 (7.00)


Grid A - C / 2 1 87.00 ### 1,305.00
Beam/Column Boot

Column boot 64 2.67 1.33 1.00 227.27


Beam boot 32 1.25 1.00 3.00 120.00

32 0.50 1.00 3.00 48.00


Center column 6 7.00 1.00 22.00 924.00
Center beam 1 129.00 1.00 8.50 1,096.50

Total ###
26b Enamel paint.

Grid A - C / 9 1 85.00 6.00 510.00


Window jam 4 13.00 1.00 52.00
Deduction window -4 7.00 3.00 (84.00)
Grid A / 2 - 3 1 127.00 6.00 762.00
Window jam 4 13.00 1.00 52.00
Door jam 1 12.00 1.00 12.00
Deduction window -4 7.00 3.00 (84.00)

-1 3.00 6.50 (19.50)


Grid C / 2 - 9 1 127.00 6.00 762.00
Window jam 4 13.00 1.00 52.00
Door jam 1 14.00 1.00 14.00
Deduction window -4 7.00 3.00 (84.00)
Sinage wall 1 31.00 6.00 186.00
Grid A - C / 3 - 4 1 87.00 6.00 522.00

06/14/2021 Page 8 of 32 Arch Hall Qty (2)


ATDMC
AIP, MEASUREMENT SHEET
Landhi,Karachi. 6th Running Bill

S.No Description Unit No L B H Quantity


Window jam 2 16.00 1.00 32.00

1 16.00 1.00 16.00


Door jam 1 7.00 1.00 7.00

1 11.00 1.00 11.00


Deduction window -2 12.67 3.00 (76.02)

-1 5.00 3.00 (15.00)

-1 3.17 6.00 (19.02)

-1 7.00 6.00 (42.00)


Beam/Column Boot
Center column 6 7.00 1.00 6.00 252.00

Total 2,818.460

26c Matt finish

Meeting room 1 12.00 ### 228.00

1 61.00 ### 610.00


Door jam 1 17.17 1.00 17.17
Deduction window -1 12.67 4.00 (50.68)

-1 7.00 3.17 (22.19)


Reception room 1 10.50 ### 126.00

1 44.33 ### 443.30


Window jam 1 17.33 1.00 17.33
Door jam 2 17.17 1.00 34.34
Deduction window -1 4.67 4.00 (18.68)

-2 7.00 3.17 (44.38)


Small meeting room 1 12.00 7.50 90.00

1 39.00 ### 390.00


Deduction window -1 4.67 4.00 (18.68)

-1 7.00 3.17 (22.19)

06/14/2021 Page 9 of 32 Arch Hall Qty (2)


ATDMC
AIP, MEASUREMENT SHEET
Landhi,Karachi. 6th Running Bill

S.No Description Unit No L B H Quantity


Open office hall 1 19.00 7.50 142.50

1 31.00 ### 651.00

1 31.00 8.00 248.00

1 142.00 ### 1,420.00


Center column 1 7.00 1.00 10.00 70.00
Deduction window -1 12.67 4.00 (50.68)

-1 5.00 4.00 (20.00)

-1 7.58 4.00 (30.32)

-4 3.17 7.00 (88.76)

-1 7.00 7.00 (49.00)

-1 8.33 7.00 (58.31)


Design room 1 12.00 ### 144.00

1 48.00 ### 480.00

-1 8.33 7.00 (58.31)


Inspection room 1 20.25 ### 384.75

1 78.50 ### 785.00

-1 5.00 4.00 (20.00)

-1 7.58 4.00 (30.32)

-1 7.00 7.00 (49.00)

-1 3.17 7.00 (22.19)


Wash room Block
Staff Locker room 1 53.00 ### 530.00
Ceiling 1 14.25 ### 185.25
Window jam 1 18.00 1.00 18.00

1 19.50 1.00 19.50


Door jam 1 17.17 1.00 17.17

-1 4.00 5.00 (20.00)

-1 8.00 1.75 (14.00)

-1 3.17 7.00 (22.19)

06/14/2021 Page 10 of 32 Arch Hall Qty (2)


ATDMC
AIP, MEASUREMENT SHEET
Landhi,Karachi. 6th Running Bill

S.No Description Unit No L B H Quantity


Staff toilets 1 16.00 ### 192.00

1 86.00 3.00 258.00


Ceiling 1 27.33 ### 389.45
Door jam 1 20.67 1.00 20.67

1 17.17 1.00 17.17

-1 4.00 8.33 (33.32)

-3 3.17 7.00 (66.57)


Executive lobby area 1 48.00 ### 480.00
Ceiling 1 12.50 5.00 62.50

1 8.00 7.00 56.00


Door jam 4 16.75 0.67 44.89

-4 7.00 2.75 (77.00)

-1 6.50 7.00 (45.50)


Executive locker area 1 57.00 ### 570.00
Ceiling 1 18.00 6.25 112.50

-1 7.00 2.75 (19.25)


Ppantry 1 29.00 2.00 58.00
Ceiling 1 7.00 8.00 56.00
Executive ladies toilet 1 26.00 2.00 52.00
Ceiling 1 6.75 6.17 41.65
Executive toilet 1 37.50 2.00 75.00
Ceiling 1 6.75 ### 81.00
CI foundry toilets 1 111.00 2.00 222.00
Ceiling 1 42.00 ### 546.00
Total 9,434.620
27 External paint

External Walls 2 - 9/ A, C 2 144.00 ### 8,064.00


Column sides 28 0.50 ### 336.00
External Walls 1 - 2/ A, C 2 15.08 ### 573.04

06/14/2021 Page 11 of 32 Arch Hall Qty (2)


ATDMC
AIP, MEASUREMENT SHEET
Landhi,Karachi. 6th Running Bill

S.No Description Unit No L B H Quantity


External Walls A - C / 9 1 85.00 ### 2,380.00
External Walls A - C / 2 1 84.00 ### 1,260.00
External Walls A - C / 1 1 84.00 ### 1,596.00
Wash romm internal parapet wall 1 111.00 6.50 721.50
Deduction

External Walls 1 - 9/ C

Windows -4 7.00 5.00 (140.00)

-6 4.50 3.50 (94.50)

-2 3.75 5.00 (37.50)

-1 4.00 5.00 (20.00)


Door -1 3.50 8.00 (28.00)

-1 12.50 ### (125.00)


Tile wall -1 12.00 ### (180.00)
External Walls 1 - 9/ A

Windows -5 7.00 5.00 (175.00)

-7 4.50 3.50 (110.25)


Door -1 6.50 ### (65.00)
External Walls A - C / 9

Windows -4 7.00 5.00 (140.00)

-4 4.50 3.50 (63.00)


External Walls A - C / 1

Windows -5 5.00 4.00 (100.00)

-1 8.00 1.75 (14.00)


Door -1 4.00 8.00 (32.00)

-1 3.17 8.00 (25.36)


Window Sill -
Grid 1-9 / A 5 7.00 2.00 70.00

7 4.50 2.00 63.00


Grid 9 / A - C 4 7.00 2.00 56.00

06/14/2021 Page 12 of 32 Arch Hall Qty (2)


ATDMC
AIP, MEASUREMENT SHEET
Landhi,Karachi. 6th Running Bill

S.No Description Unit No L B H Quantity

4 4.50 2.00 36.00


Grid 2-9 / C 4 7.00 2.00 56.00

6 4.50 2.00 54.00

2 3.75 2.00 15.00

1 4.00 2.00 8.00


Grid A - C / 1 5 4.00 2.00 40.00

1 8.00 2.00 16.00


For Projection -
Mid Level -
Grid 2-9 / A 5 8.25 5.00 206.25

1 18.50 5.00 92.50


Grid 9 / A - C 4 8.25 5.00 165.00
Grid 2-9 / C 4 8.25 5.00 165.00

2 18.50 5.00 185.00


Sinage roof 1 16.00 5.00 80.00
Top level -
Grid 2-9 / A 7 6.00 5.00 210.00
Grid 9 / A - C 4 6.00 5.00 120.00
Grid 2-9 / C 6 6.00 5.00 180.00

Total 15,398.68

06/14/2021 Page 13 of 32 Arch Hall Qty (2)


COMPARATIVE TENDER SUMMARY
SHIRAZI INVESTMENT WAREHOUSE
NORTH WESTERN ROAD PORT QASIM, KARACHI

THE
K&T
ENGINEERIN ENGINEERS &
S-# DESCRIPTION ASSOCIATESA REMARKS
G AMOUNT CONSTRUCTO
MOUNT
RS AMOUNT
Structure & Architectural work
1 Structural Warehouse 1,276,670 1,491,440 1,379,775

Total 1,276,670 1,491,440 1,379,775

LESS REBATE 0.00 % - -

Total 1,276,670 1,491,440 1,379,775

14
COMPARATIVE BILL OF QUANTITIES
PROJECT : ATLAS WAREHOUSE AT PORT QASIM
THE ENGINEERS
& K & T ASSOCIATES
OWNER : ATLAS GROUP CONSTRUCTORS
STRUCTURAL WORK ENGINEERING SHAHID MAJEED TAHA CHOHAN
S.#. DESCRIPTION UNIT Qty RATE AMOUNT RATE AMOUNT RATE AMOUNT
1 Dismantling Work
Remove existing, floor, building and loose debris from site including Bushes, shrubs,
trees, etc remove from the site. Hand over all salvageable items to Owner's representative.
Remove top soil of 9”/ 225mm from all surfaces and its disposal as required by law and
away from the site
a Dismantling column & beam Cft 120 110 13,200.00 85 10,200.00 100 12,000.00
b Dismantling Ramp side 200mm thick edges Sft 21 60 1,260.00 50 1,050.00 55 1,155.00
c Dismantling paver for pad Sft 825 15 12,375.00 35 28,875.00 20 16,500.00
d Cutting PEB sheets Sft 30 45 1,350.00 175 5,250.00 75 2,250.00
e Remove existing road blocker Job 1 40,000 40,000.00 55,000 55,000.00 45,000 45,000.00

2 Excavation
Visit site and examine the soil condition in order to determine the nature of the ground to
be excavated. Excavation should be carried out in accordance with excavation plans and
section and as directed by the site Engineer. The major portion of excavation should be
carried out by mechanical excavator’s including leveling, trimming, and finishing to the
required levels. Shoring should be put in place where required during excavation to
protect workers, adjacent paving, structures and utilities. The term shoring shall also be
deemed to cover whatever methods the Contractor establishes with prior approval of the
Project Engineer.
Including mechanical compaction up to 98%. Excavated earth/material should be disposed
off outside the Municipal Limits or as directed by the Project Engineer.
Excavation for ramp beam Cft 220 25 5,500.00 30 6,600.00 25 5,500.00

3 Earth Filling
Provide and fill the approved selected material in excavated area. The filling material
should be free from slurry, mud, organic or other unsuitable matter and capable for
compaction by ordinary means. The filling work should include loading, unloading,
transporting, placing, stocking, spreading of earth, watering, compacting, ramming, rolling
etc complete in all respects. Material for filling should be placed in layers of 200mm
measured as compacted material and saturated with sufficient water and compacted to
produce in-situ density not less than 95% of the maximum density optimum moisture
content. Complete in all respects and conforming to the requirements of drawings,
specifications and to the entire satisfaction of the Project Engineer. ( Recommended
Imported Earth Morum / Gerra / Khaka )
Cft 400 45 18,000.00 50 20,000.00 48 19,200.00

4 Stone Soling 150mm th


Provide and Lay rubble stone soling over compacted earth including leveling with
mechanical compacting, ramming, rolling, loading, unloading, transporting, placing,
stocking, spreading, watering and also include fill voids with stone and fine sand etc
complete in all respects and conforming to the requirements of drawings, specifications
and to the entire satisfaction of the Project consultant
For ramp Sft 120 50 6,000.00 55 6,600.00 50 6,000.00
COMPARATIVE BILL OF QUANTITIES
PROJECT : ATLAS WAREHOUSE AT PORT QASIM
THE ENGINEERS
& K & T ASSOCIATES
OWNER : ATLAS GROUP CONSTRUCTORS
STRUCTURAL WORK ENGINEERING SHAHID MAJEED TAHA CHOHAN
S.#. DESCRIPTION UNIT Qty RATE AMOUNT RATE AMOUNT RATE AMOUNT

5 Cement concrete having 1800 psi cylindrical strength


Provide and lay plain cement concrete used under footing, in situ wall and under other
foundation, Minimum cylindrical strength of concrete should be 1800/psi on 28 days use
SR cement.
Form work centering and shuttering should be made with steel plate close and tight to
prevent leakage or mortar, with necessary props, bracings, and wedges, sufficiently strong
and stable.
a Under ramp footing Cft 22 230 5,060.00 245 5,390.00 235 5,170.00
d For ramp Cft 40 250 10,000.00 245 9,800.00 240 9,600.00
COMPARATIVE BILL OF QUANTITIES
PROJECT : ATLAS WAREHOUSE AT PORT QASIM
THE ENGINEERS
& K & T ASSOCIATES
OWNER : ATLAS GROUP CONSTRUCTORS
STRUCTURAL WORK ENGINEERING SHAHID MAJEED TAHA CHOHAN
S.#. DESCRIPTION UNIT Qty RATE AMOUNT RATE AMOUNT RATE AMOUNT
6 Cement concrete having 3000 psi cylindrical strength
Provide and lay, straight or curved cast-in place designed mix reinforced structural cement
concrete, Minimum cylindrical strength of concrete should be 3000/psi on 28 days, use SR
cement, including the addition of admixture.

Mix with mixing machine including form work centering and shuttering shall be made
with steel plate provided as required, as per standard specifications. (Excluding cost of
steel reinforcement but including the cost of sleeves and all embedded items)

a For Pad Cft 810 550 445,500.00 625 506,250.00 575 465,750.00
b For ramp beam Cft 115 550 63,250.00 625 71,875.00 600 69,000.00

SUPER STRUCTURE
7 Cement concrete having 4000 psi cylindrical strength
Provide and lay, straight or curved cast-in place designed mix reinforced structural cement
concrete, Minimum cylindrical strength of concrete should be 4000/psi on 28 days, use
OPC cement, including the addition of admixture to achieve the required strength if felt
necessary by the structural consultant. Water should be clean and free from alkaline &
acidic matters and suitable for drinking purposes.
Mix with mixing machine including form work centering and shuttering shall be made
with steel plate provided as required, as per standard specifications.
a Column Cft 15 625 9,375.00 675 10,125.00 625 9,375.00
COMPARATIVE BILL OF QUANTITIES
PROJECT : ATLAS WAREHOUSE AT PORT QASIM
THE ENGINEERS
& K & T ASSOCIATES
OWNER : ATLAS GROUP CONSTRUCTORS
STRUCTURAL WORK ENGINEERING SHAHID MAJEED TAHA CHOHAN
S.#. DESCRIPTION UNIT Qty RATE AMOUNT RATE AMOUNT RATE AMOUNT
8 Cement concrete having 3000 psi cylindrical strength
Provide and lay, straight or curved cast-in place designed mix reinforced structural cement
concrete, Minimum cylindrical strength of concrete should be 3000/psi on 28 days, use
OPC cement, including the addition of admixture to achieve the required strength if felt
necessary by the structural consultant.. Water should be clean and free from alkaline &
acidic matters and suitable for drinking purposes.
Mix with mixing machine including form work centering and shuttering shall be made
with steel plate provided as required, as per standard specifications.
i RCC Beam Cft 40 650 26,000.00 650 26,000.00 650 26,000.00
SOG Floor for ramp Cft 85 375 31,875.00 500 42,500.00 400 34,000.00
Screed on pad Sft 540 145 78,300.00 145 78,300.00 135 72,900.00

9 Steel Cutting & Fixing


Provide and fix in position mild steel or deformed reinforcement bars ( hot rolled) of any
size of any diameter with 60,000 lbs. per sq. inch yield strength including the cost of
straightening cutting, wastage and such overlaps as are not shown on the drawings in
position on M.S. Chairs and should be free from corrosion, loose rust scales, oil, grease,
paint, etc. The steel bar should be round and capable of being bent without fracture. Bars
should be hooked and bent accurately and placed in position as per design and drawing
and bound together tight with 16 SWG annealed steel wire at their point of intersection.
Bars should be bent cold by applying gradual and even motion. Bars of 40mm and above
diameter may be bent by heating to dull red and allowed to cool slowly. Joints in the bar
should be avoided as far as possible, when joints have to be made an overlap of 40 times
diameter of the bar or as specified in the drawing. Bigger diameter bars should be jointed
by welding and tested before placing in position. Kg 675 155 104,625.00 135 91,125.00 145 97,875.00

10 External Plaster
Provide and Apply 20mm thick internal plaster, first coat 10mm thick ratio 1:5 cement,
sand mortar and second coat 10mm thick plaster or specified thickness and layers on all Sft 300 55 16,500.00 55 16,500.00 50 15,000.00
externals surfaces.

METAL WORKS
11 Security Roller Shutters
Provide and install Aluminum anodized finish ( Including Cost of Motor ) from Malaysia,
security roller shutter , Electric Operated vertically folded including G.I. channel with
rubber gas kit, end caps, spring etc complete as per approved by the architect
(Recommended Supplier: The Protectors). Complete in all respects and conforming to the
requirements of drawings, and to the entire satisfaction of the Project consultant.
Sft 220 1,650 363,000.0 2,150 473,000.00 2,000 440,000.00
COMPARATIVE BILL OF QUANTITIES
PROJECT : ATLAS WAREHOUSE AT PORT QASIM
THE ENGINEERS
& K & T ASSOCIATES
OWNER : ATLAS GROUP CONSTRUCTORS
STRUCTURAL WORK ENGINEERING SHAHID MAJEED TAHA CHOHAN
S.#. DESCRIPTION UNIT Qty RATE AMOUNT RATE AMOUNT RATE AMOUNT
12 External Paint
Provide and apply four coats of weather shield paint of approved manufactured (ICI /
Berger ) to external surfaces of the building including grinding, rubbing, cleaning and
preparation of the base plus the cost of scaffolding or suspended platform wherever
required complete in all respects. conform to the requirements of drawings, and to the
entire satisfaction of the Project consultant. Sft 500 40 20,000.0 45 22,500.00 45 22,500.00

13 Re-Install pavers Sft 100 55 5,500.0 45 4,500.00 50 5,000.00

TOTAL AMOUNT ### ### ###


BAR BENDING SCHEDULE

PROJECT: - _______________________________________________ DATE: - _______________

DRAWING REFERENCE: - ____________________________________ SHEET NO: - ____________

BAR NO. OF TOTAL CUT TOTAL


S# DETAILS MAR DIA ø BAR BARS LNTH LNTH SHAPE
K EACH NOS. Rft. Rft.

ROOF SCREED

3 -

3 -

3 -

3 -

3 -

3 -

3 -

3 -

3 -

main Bars 3 -

SIZE OF BAR 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL WEIGHT

Page 20 of 32
Kg/Rft 0.076 0.171 0.303 0.473 0.681 1.21
Kg/METER 0.248 0.56 0.994 1.552 2.235 3.975
LENGTH IN Rft. -
WEIGHT OF BARS (IN Kg) - - - - - - -

Prepared by, Checked & Verified by,

___________________ ___________________

Page 21 of 32
BAR BENDING SCHEDULE

PROJECT: - _______________________________________________ DATE: - _______________

DRAWING REFERENCE: - ____________________________________ SHEET NO: - ____________

BAR NO. OF TOTAL CUT TOTAL


S# DETAILS MAR DIA ø BAR BARS LNTH LNTH SHAPE
K EACH NOS. Rft. Rft.

PLINTH BEAMS

Rings
500 + 500 + 550
+550+150 +150+100+100 3 -

Distribution 3 -

main (3+3) 5 -

main 4 -
-

Column Pedestal 4 -

Ring (1300) 3 -

Column 4 -

Ring (1300) 3 -
-

Bracing beam 4 -

Rings 3 -

SOG Dowels 3 -

SIZE OF BAR 1/4" 3/8" 1/2" 5/8" 3/4" 1" TOTAL WEIGHT

Page 22 of 32
Kg/Rft 0.076 0.171 0.303 0.473 0.681 1.21
Kg/METER 0.248 0.56 0.994 1.552 2.235 3.975
LENGTH IN Rft. - - -
WEIGHT OF BARS (IN Kg) - - - - - - -

Prepared by, Checked & Verified by,

___________________ ___________________

Page 23 of 32
S.No DESCRIPTION UNIT QTY RATE AMOUNT
1 PVC Skirting
Provide and fix PVC skirting 3" high as per approved design/color complete in
all respects and conform to the requirements of drawings, and to the entire
satisfaction of the Project consultant. (Recommend vendor: Modul Art or
equivalent) Rft 1,050 -

2 Hardonate Metal top trowel finish Floor with 110mm


Provide and apply Hardonate Metal top floor (Mitchell's construction
chemicals)
Step I:- Laying 1:2:4 - 100 to 75mm thick screed.
Step II:- After an hour Laying 20mm thick 1:2 ( 1 part cement & 2 parts
natural stone chips 6mm down) green concrete.
Step III:- Apply 12 mm th Non oxidizing metal top hardonate by Mitchell's in a
ratio of 2:1 (2 pats hardonate & I part cement, well mixed before water is
added in low ratio. Water cement ratio should not exceed 0.30
Work execute in alternate panels as per suggestion and recommendation the
Manufacturer including 14 days curing, during the curing period the surface
should be protected from any traffic, etc. complete in all respect and
conforming to the requirements of drawings, and to the entire satisfaction of
the Project Consultant. .
Sft 6,500 -

3 Door Frames
Provide, make and Install Beech wood Door frame to take solid core or glazed
shutters. The Beech wood should be of the best quality well seasoned and free
from saps, knots, warps and other defects. The frame should be properly
framed and joined by mortise and tenon, joint with hard wooden pins and the
joints should be coated with white lead before being fitted together. The frame
should be of section as per Drawing. All faces other then canceled once should
be painted with a primer coat before fixing in position etc also included
Polyurethane polish finish, rebates, beading/architraves as required. Complete
in all respects and conforming to the requirements of drawings, and to the
entire satisfaction of the Project consultant. All wooden material to be properly
treated with termite proofing chemical recommended: solignum by jaffar
brothers.

Frame sectional size 150 x 50mm Rft 315 -

4 Door Shutters (Formica Finish)


Provide, make and install solid core shutter. The shutter may be paneled and
louver Formica finish with Beech wood lipping or as specified. The thickness
of shutter shall be 1¾” or as specified. The panels shall be planed and neat and
truly finished to the exact dimensions with necessary brass hinges, tower bolts,
hock bolts etc. Screws should be of suitable length and correct diameter and
should be fixed with screw driver not by hammering. All wooden material to
be properly treated with termite proofing chemical (recommended: solignum
by jaffar brothers) Complete in all respects and conforming to the
requirements
Formica finish of drawings,
vision and to
panel shutter the entire
985mm wide satisfaction of the Project No 4 -
consultant.
Formica finish vision panel shutter 900mm wide No 6 -
Formica finish vision panel shutter with louvers 760mm wide No 2 -
Formica finish without vision panel shutter 760mm wide No 2 -
Formica finish change/rest room shutter 675mm wide No 4 -

5 M.S Openable Door


Provide, fabricate and fix Openable vision panel MS door as per drawing
including Red Oxide & finished with 3 coats of Enamel Paint complete with
hinges, handle, etc. complete in all respects and conforming to the
requirements of drawings, specifications and to the entire satisfaction of the
Project consultant. Sft 60 -

6 Door Locks
Provide and install door lock lever type mortise lock with 5 pin cylinder and
lever in SS satin finish. Approved manufacturer: Bonco or approved
equivalent. Conforming to the requirements of drawings, and to the entire
satisfaction of the Project consultant. (Basic Rate Rs. 4500/-) (Recommend
vendor: JB saeed) No 20 -

Suite No. 209, 2nd Floor, Almas Heights, PECHS, Block-2, Shahrah-e-Faisal, KarachiTel: +92 21 34327838 / +92 21
4229120 Cell: 0333-2019706
S.No DESCRIPTION UNIT QTY RATE AMOUNT
7 Door Closers
Provide and install imported sprayed silver ( New star) make door closer as
approved and conforming to the requirements of drawings, and to the entire
satisfaction of the Project consultant. (Basic Rate Rs. 4500/-) (Recommend
vendor: JB saeed) No 14 -

8 Door Closers for MS door


Provide and install imported sprayed silver ( New star) make door closer for
MS exit door as approved and conforming to the requirements of drawings,
and to the entire satisfaction of the Project consultant.(Recommend vendor: JB
saeed) No 3 -

9 Tempered Glass Doors


Provide and install 12mm thick tempered Glass Door including imported (New
Star) floor hinges (chrome imported patch fitting with lock) etc complete in
all respects and conforming to the requirements of drawings, and to the entire
satisfaction of the Project consultant
Sft 21 -

10 Glass Door Handles


Provide and install best quality imported S.S. Door handle as approved and
conforming to the requirements of drawings, and to the entire satisfaction of
the Project consultant. Size: 16" high (Basic Rate Rs. 4000/-) Set 1 -

11 Wooden chair rail


Provide and install 6" x 1/2" Beech wood chair rail fixed with 1" long counter
sunk screws and plugged with beech wood plugs at 2'-0" c/c including water
base polyurethane polish finish, grinding of edges and joints and finishing
complete in all respects and conforming to the requirements of drawings,
specifications and to the entire satisfaction of the consultant.
Rft 75 -

12 Paneling (Polyurethane polish finish)


Provide, make and Install ½" thick M.D.F board with Beech ply paneling at
walls with 1” x 2” thick rough wood (as per drawing) so lignum treated
intermediate framing with screw of suitable length & dia with outer faces
Beech wood lipping including rubbing, maintain clean edges etc complete and
conforming to the requirements of drawings, and to the entire satisfaction of
the Project consultant. All wooden material to be properly treated with termite
proofing chemical recommended: so lignum by jaffar brothers.
Sft 150 -

13 Wooden Bench for change room


Provide and install Beech wood wooden bench including water base
polyurethane polish finish, grinding of edges and joints and finishing complete
in all respects and conforming to the requirements of drawings, specifications
and to the entire satisfaction of the consultant.
No 2 -

14 Kitchen Base Cabinets


Provide and install 36" high, 24" deep and length as per drawing kitchen
cabinet, floor unit made of ¾” thick Commercial veneer board pressed on both
sides textured Formica with PVC lipping on all edges, imported hinges, locks,
S.S handles including pre-polished marble top with fine edges. All wooden
material to be properly treated with termite proofing chemical recommended:
so lignum by jaffar brothers. Complete in all respects and conforming to the
requirements of drawings, and to the entire satisfaction of the Project
Consultant.
Rft 6 -

15 Kitchen Hanging Cabinets


Provide and install 12" deep and 24" high kitchen wall cabinets made of ¾”
thick Commercial Veneer Board pressed on both sides textured Formica with
P.V.C. lipping on all edges, imported hinges, locks, SS handles complete.
Interior partitions to be also made of Commercial Veneer pressed with Formica
on both sides. All wooden material to be properly treated with termite proofing
chemical recommended: so lignum by jaffar brothers. Complete in all respects
and conforming to the requirements of drawings, and to the entire satisfaction
of the Project Consultant.
Rft 6 -

16 Mineral Fiber ceiling


Provide and install powder coated T-bar ceiling 2'x 2' lay by structural slab
with heavy G.I suspension system.

Suite No. 209, 2nd Floor, Almas Heights, PECHS, Block-2, Shahrah-e-Faisal, KarachiTel: +92 21 34327838 / +92 21
4229120 Cell: 0333-2019706
S.No DESCRIPTION UNIT QTY RATE AMOUNT
a) Infill Panels of Mineral Fiber 5/8" thick with revealed joint made by Sft 1,175 -
Daiken imported from Japan or equivalent.

17 Gypsum Board Ceiling


Provide and install ½” thick imported gypsum board suspended ceiling hung 22
SWG galvanized mild steel channels, heavy duty suspension system with rigid
connection including making provision for lighting coves, tapered ends,
fluorescent and incandescent spot light fixtures but without paint include extra
salutes for A.C etc. Include for imported mud / gypsum filling and gauze tape
over joints etc Recommended Manufacturer: Elephant Brand imported from
Thailand, complete and conforming to the requirements of drawings, and to the
entire satisfaction of the Project consultant.

Sft 1,340 -

18 Water Resistant Ceiling


Provide and install ½” thick water resistant gypsum suspended ceiling hung by
22 SWG galvanized mild steel channels, heavy duty suspension system with
rigid connection including making provision for lighting coves, tapered ends,
fluorescent and incandescent spot light fixtures but without paint. Include for
imported mud / gypsum filling and gauze tape over joints etc Recommended
Manufacturer: Elephant Brand imported from Thailand, complete as per
drawings and to the entire satisfaction of the Project consultant.
Sft 120 -

19 M.S Raised Floor Tiles


Providing and Installing raised flooring with PVC skirting for I.T room with
imported farming / supports raised by adujustable 12" to 18" complete with
MS channel for side supports and complete all fitting accessories etc Complete
in all respects and conforming to the requirements of drawings, specifications
and to the entire satisfaction of the Architect Recommend Manufacturer:
merro, make German. (Basic rate 1450/sft) Sft 120 -

20 Glass Partition
Provide and Install 12mm thick flot glass partition from floor to ceiling with
3M safety film hang with MDF boxing on top and fixed on floor by 100mm x
50mm and 2mm section in champagne anodized finish with 8mm thick clear
glass, as shown on the drawings, with 2mm thickness of section and 20 micron
anodic film of approved make or its equivalent make as indicated on the
drawings and approved by the Project Engineer , using stainless steel screw,
glazed, PVC glazing channel weathered strip between open able portion and
aluminum trimming complete with handle, lock, application of silicone for
joints etc. complete in all respects and conform to the requirements of
drawings, specifications and to the entire satisfaction of the Project Consultant.
Recommended manufacture:- ALCOP and PAKISTAN CABLE Sft 30 -

21 Aluminum Window with 8mm clear glass


Providing and fixing in position fully glazed aluminum windows and
ventilators consisting of glazed open able panels with fly screen 100mm x
50mm and 2mm section in champagne anodized finish with 8mm thick clear
glass, as shown on the drawings, with 2mm thickness of section and 20 micron
anodic film of approved make or its equivalent make as indicated on the
drawings and approved by the Project Engineer , using stainless steel screw,
glazed, PVC glazing channel weathered strip between open able portion and
aluminum trimming complete with handle, lock, application of silicone for
joints etc. complete in all respects and conform to the requirements of
drawings, specifications and to the entire satisfaction of the Project Consultant.
Recommended manufacture:- ALCOP and PAKISTAN CABLE
Sft 950 -

22 Aluminum Window with vacuum


Providing and fixing in position fully glazed aluminum windows and
ventilators consisting of glazed open able panels with fly screen 100mm x
50mm and 2mm section in champagne anodized finish with 20mm thick
vacuum glass, as shown on the drawings, with 2mm thickness of section and
20 micron anodic film of approved make or its equivalent make as indicated on
the drawings and approved by the Project Engineer , using stainless steel
screw, glazed, PVC glazing channel weathered strip between open able
portion and aluminum trimming complete with handle, lock, application of
silicone for joints etc. complete in all respects and conform to the requirements
of drawings, specifications and to the entire satisfaction of the Project
Consultant. Recommended manufacture:- ALCOP and PAKISTAN CABLE
Sft 100 -

Suite No. 209, 2nd Floor, Almas Heights, PECHS, Block-2, Shahrah-e-Faisal, KarachiTel: +92 21 34327838 / +92 21
4229120 Cell: 0333-2019706
S.No DESCRIPTION UNIT QTY RATE AMOUNT

23 Porcelain Tiles
Provide & Fix matt porcelain tile 400 x 400mm or equivalent with other colour
border patterns, set in cement sand mortar (1:4) and filling the joints with neat
cement slurry, using matching colour / pigment, at any height or any floor,
over including 50mm to 75mm thick 1:2:4 cement concrete bedding of groove
key to sub structure, leveling as per slope, curing, cleaning etc. complete in all
respects and conform to the requirements of drawings, and to the entire
satisfaction of the Project consultant. Recommended (Basic Rate: 1800/ Meter)

On Floor with 50 to 75mm C.C 1:2:4 bed to required level Sft 2,350 -
On wall with 12mm thick base plaster Sft 500 -

24 Marble
Provide and Fix selected Peralino marble 20mm thick, pre-polished with
chamfered and fine edges on 12mm thick 1:6 cement and sand bed to required
surface as per drawing Including with grout (Stile) neat and clean etc. complete
in all respect and conforming to the requirements of drawings, and to the entire
satisfaction of the Project Consultant. .
Marble fixing on Door Threshold Rft 50 -
Window sill Rft 210 -

25 M.S Sliding Door


Provide, fabricate and fix (Sliding Door) 14 S.W.G. M.S. Sheet & 14 S.W.G
hollow pipe frame all edges having welded joints finished with grinding, Red
Oxide & finished with 3 coats of Enamel Paint complete with bearing, hinges,
handle, M.S railing M.S. Wheel etc. complete with glider M.S. floor plate etc
complete in all respects and conforming to the requirements of drawings,
specifications and to the entire satisfaction of the Project consultant.
Sft 300 -

26 Internal Paint
Provide and apply 4 coats of paint to internal plastered walls, partitions,
structural ceiling including grinding, cleaning, rubbing, sanding, filling and
preparing base with primer coat; all to be done in strict accordance with the
( ICI / Berger ) manufacturer's specification etc. complete in all respects and
conforming to the requirements of drawings, specifications and to the entire
satisfaction of the Project consultant. .
Distemper Paint. Sft 10,500 -
Enamel paint. Sft 5,000 -
Matt finish Sft 9,500 -

27 External Paint
Provide and apply four coats of paint of approved manufactured to external
surfaces of the building including grinding, rubbing, cleaning and preparation
of the base plus the cost of scaffolding or suspended platform wherever
required etc. complete in all respects and conforming to the requirements of
drawings, specifications and to the entire satisfaction of the Project
consultant. . Sft 8,900 -

Total Architecture Work -

Suite No. 209, 2nd Floor, Almas Heights, PECHS, Block-2, Shahrah-e-Faisal, KarachiTel: +92 21 34327838 / +92 21
4229120 Cell: 0333-2019706
S.No DESCRIPTION UNIT QTY RATE AMOUN
T
1 Installation of Air Conditioning Unit
Installation of air conditioning units with commissioning & testing.
Complete and conform to the requirements of drawings, and to the entire
satisfaction of the Project consultant.

1.5 & 2.0 Ton's Nos 12 -

2 Copper piping with Wiring


Copper piping with insulation for split units (charged as per final
measurement on site). The return and supply copper tubing to be sized as
per manufacturer's recommendation and to be drawn in separate Aeroflex
insulators including covering the insulation with Grey tape or cloth
warped and pasted over it. Also included are the supports, hangers, G.I.
trays etc. including wiring from outdoor unit to indoor with 2 x 1.5 mm.sq.
+ 1 x 1.5 mm.sq wire drawn in a separate PVC 'D' class conduit clipped to
wall or ceiling (wiring make Pakistan Cables or Pioneer Cables) complete
as per drawings and as directed by the Architect.

Copper piping 3/8 , 5/8 " dia for 1.5 & 2.0 Ton Unit Rft 900 -

3 UPVC drain pipe


Provide & fix UPVC drain pipe (medium) conforming to BSS 1307 of
1957, along with UPVC fittings such as tees, elbows, unions, reducers,
sockets, teflon tape for jointing, hangers, supports, sleeves, including
testing and commissioning and insulation with Aeroflex insulation.
Complete as per drawings and as directed by the Architect.

25mm dia Ru.ft 500 -

4 Angle Iron bracket


Providing and installing Angle Iron bracket / supports treated with rust
proof paint and enamel coating for external A/c units fixed to the wall slab
with Hilti bolts. Complete as per drawings and as directed by the
Architect.
Ground floor Nos 12 -

Total Amount -

Suite No. 209, 2nd Floor, Almas Heights, PECHS, Block-2, Shahrah-e-Faisal, KarachiTel: +92 21 34327838 / +92 21 4229120 Cell: 0333-2019706
No. DESCRIPTION UNIT QTY RATE AMOUNT
1 English type Water Closet
Provide and Fix best quality European type glazed earthenware water closet
(Make Porta with Master or equivalent fitting ) with cistern with seat cover
including fix inlet pipe, cistern, lid, cistern kit, stop cock deluxe and
accessories & fitting materials, making requisite No. of holes in walls and floor
for pipe connection and making good with approved material and conforming
to the requirements of drawings, and to the entire satisfaction of the Project
consultant.
Nos. 2 15,000 30,000

2 Asian type Water Closet


Provide and Fix best quality Asian type water closet (Make Porta with Master
or equivalent fitting ) with low Down flushing cistern complete with all
accessories and fittings waste and traps, CP flexible pipe, including tee stop
cock with check nuts, all joints plugging and screwing as necessary to the
structure, making requisite No. of holes in walls and floor for pipe connection
and making good with approved material and conforming to the requirements
of drawings, and to the entire satisfaction of the Project consultant. Nos 15 12,000 180,000

3 Urinal
Provide and Fix best quality flat back lipped front urinal (Make Porta with
Master or equivalent fitting ) of glazed earthenware including fix 3/4" dia C.P
flush valve, a pet cock CI or WI brackets, standard flush pipe with fittings,
bottle trap connection. Make required holes in walls & floors for pipe
connections and make good with approved material and conforming to the
requirements of drawings, and to the entire satisfaction of the Project
consultant.

15,000
4 Semi Pedestal Wash Basin
Provide and Fix best quality glazed earthenware wash basin (Make Porta with
Master or equivalent fitting ) with single hole chromium plated mixer tap 15
mm (1/2"), two tee stop cocks, flexible pipes, bottle trap waste plug with chain,
silicon, sealant, waste pipe. Make requisite holes in walls & floor for pipe
connections and make good with approved material and conforming to the
requirements of drawings, and to the entire satisfaction of the Project
consultant.
Nos 8 21,500 172,000

5 Floor Drains
Provide and Fix floor drain / Floor Gully of approved design grating (Make
Dadex), including requisite number of holes in wall plinth or floor for pipe
connection and making good the same as necessary with non-shrink grout to
the structure complete including gasket and clamp complete and conforming to
the requirements of drawings, and to the entire satisfaction of the Project
consultant. Nos. 17 3,000 51,000

6 Toilet Paper Holder


Provide and Fix of C.P toilet paper holders with bracket and screws and
conforming to the requirements of drawings, and to the entire satisfaction of Nos. 2 3,000 6,000
the Project consultant.

7 Soap Dispenser
Provide and Fix Soap Dispenser size as per drawing with C.P screws and
conforming to the requirements of drawings, and to the entire satisfaction of Nos. 4 4,500 18,000
the Project consultant.

8 Muslim Shower
Provide and Fix Bibcock with Muslim showers(Make Master or equivalent ) ,
complete with Tee stop cock and controlled spray head and conforming to the
requirements of drawings, and to the entire satisfaction of the Project
consultant. Nos. 2 5,000 10,000

9 Shower Head
Provide and Fix long shower head (Make Master or equivalent ) and
conforming to the requirements of drawings, and to the entire satisfaction of Nos. 8 1,500 12,000
the Project consultant.

10 Mirror
Provide and Fix "Belgium glass" with chromium plated screws and 3.2 mm
thick commercial back ply including fixing of packing tape back of mirror and
white silicon fill around of mirror etc. complete and conforming to the
requirements of drawings, and to the entire satisfaction of the Project
consultant. Sft 70 600 42,000

Suite No. 209, 2nd Floor, Almas Heights, PECHS, Block-2, Shahrah-e-Faisal, KarachiTel: +92 21 34327838 / +92 21
4229120 Cell: 0333-2019706
No. DESCRIPTION UNIT QTY RATE AMOUNT
11 Long Bib Cock
Provide and Fix long bib cock (Make Master or equivalent ) and conforming
to the requirements of drawings, and to the entire satisfaction of the Project Nos. 25 3,000 75,000
consultant.

12 Coat Hook
Provide and Fix Best quality chromium plated coat hook double in all W.C and
conforming to the requirements of drawings, and to the entire satisfaction of
the Project consultant.
Nos. 25 1,500 37,500

13 Clean Out
Provide and fix upvc clean out (Floor / ceiling type, Make Dadex) with s/s
cover, marking requisite number of holes in walls, Plinth or floor for pipe
connection and making good the same as necessary to the structure including
rubber gasket and clamp etc. and conforming to the requirements of drawings,
and to the entire satisfaction of the Project consultant.
Nos. 5 2,500 12,500

14 P.P.R Pipe & Fitting


Provide, fix and joint, testing poly propylene pipe (Make Dadex) as
manufactured by "Dadex" as per BS 5174 or DIN 8028 including specials
fittings such as socket, tees, elbows bends, reducer plug and union etc.)
supported on wall or buried in walls or suspended from roof slab as per
specifications including color tagging complete in all respect, providing sleeve
in wall.

20mm dia Rft 250 300 75,000


25 mm dia Rft 15 350 5,250
32 mm dia Rft 125 400 50,000
40 mm dia Rft 160 400 64,000
50 mm dia Rft 105 450 47,250
63 mm dia Rft 105 600 63,000

15 Gate Valve
Providing, Fixing of full way gate valves of bronze trim up to 2” (50 mm) dia
with threaded ends cast iron body bronze trim flanged ends for 3" dia (75 mm)
and above or equivalent or similar for 125 psi together with all additional
material required for a complete installation as describe in the specification
and as shown on drawings and to the entire satisfaction of the Project
consultant.
50 mm dia Nos. 2 5,500 11,000
25 mm dia Nos. 1 4,500 4,500
20 mm dia Nos. 6 4,000 24,000

16 UPVC Pipes
Providing, Fixing in position uPVC pipes (Make Dadex) push fit type for soil,
waste water & vent pipe embedded in floor and wall or suspended from slab or
clamped to wall including plugs, clamps, hanger collars, supports, specials
(bend, tees, y-tee etc.) making requisite number of holes in walls and floors
and filling holes around the pipe with non shrink grout of approved make
where required and making good the same as necessary to the structure
labeling testing to 6.5 ft. water height complete. and conforming to the
requirements of drawings, and to the entire satisfaction of the Project
consultant.

50mm dia Rft 40 350 14,000


75mm dia Rft 325 500 162,500
100mm dia Rft 225 650 146,250
150mm dia Rft 190 1,200 228,000
300mm dia B class Rft 50 2,000 100,000

17 Upvc Cowl
Provide and fix Upvc cowl (Make Dadex) for vent pipe of the following dia
including all accessories complete.

75mm dia No 3 1,000 3,000


100mm dia No 2 1,000 2,000

Suite No. 209, 2nd Floor, Almas Heights, PECHS, Block-2, Shahrah-e-Faisal, KarachiTel: +92 21 34327838 / +92 21
4229120 Cell: 0333-2019706
No. DESCRIPTION UNIT QTY RATE AMOUNT

18 Gully Trap
Provide and fix gully trap Alpine make 200x200mm cast iron frame and cover
with R.C.C gully trap chambers, including excavation, backfilling, masonry,
plaster internally and externally vitreous China trap etc. complete and
approved by the Engineer and conforming to the requirements of drawings,
and to the entire satisfaction of the Project consultant.
No 2 9,000 18,000

19 Roof Drain Pipe


Providing & Fixing UPVC roof drain (Make Dadex) including clamps,
Hangers & Wall Bracket Supports as required embedded in exposed surface rft 500
complete in all respect.

20 R.C.C MANHOLE
Provide and make manhole depth as per drawing including excavation, 3"
thick 1:3:6 lean, R.C.C 6" thick bed in 1:1½ : 3, R.C.C 6" thick wall above
bed, 1" thick plaster 1:4 ratio Internal & External sides of wall, Make chamfer
in 1:1½ : 3 slop as per drawing, plaster with puddlo in 1:4 ratio internally and
8" thick top slab, Plaster with puddlo work av depth4'-6" (total 50 Sft inside
Plaster). Main Hole cover Filling & fixing 24" x 24" cover C.C Smooth finish
with the provision of conduiting or other embedded items, removing excess
material etc. complete in all respect and conforming to the requirements of
drawings, and to the entire satisfaction of the Project consultant. (including
steel as per drawing)

( 600mm x 600mm ) Nos. 2 25,000 50,000

21 Fiber Tank
Provide and Fix Horizontal Type Fiber Glass Tank ( Make Master ) 5000
gallon along all accessories and conforming to the requirements of drawings,
and to the entire satisfaction of the Project consultant.
No 3 200,000 600,000

Total Plumbing Work 2,313,750

Suite No. 209, 2nd Floor, Almas Heights, PECHS, Block-2, Shahrah-e-Faisal, KarachiTel: +92 21 34327838 / +92 21
4229120 Cell: 0333-2019706
INTER DEVELOPER
Item No Description Unit Qty Rate Amount
1.0 NOS 72.00 2,450 ###

A: Material
Quantity
Item Description Unit Rate Amount Gross
Actual Wastage Total

1 STAIR 1 1.00 8,000.00

Total 8,000.00 8,000.00

B: Labour
Quantity
Item Description Unit Rate Amount Gross
Actual Wastage Total
1 labour 2.00 - 0.50 1,200.00 600.00
2
3 -

Total 600.00 8,600.00

C: TOOLS AND PLANTS


Quantity
Item Description Unit Rate Amount Gross
Actual Wastage Total
1 ToolS and Plants 1 1.00 - 1.00 500.00 500.00

Total 500.00 9,100.00

D: Others
Item Description % Amount Gross
1 Overheads 10.00 910.00 10,010.00
2 Profit ### 2,002.00 12,012.00
2 Tax 10.00 1,201 11,211.20
11,211.20
-