Name of Project

Address
Client Name
Architect
Bidder:
Package-1
Scope of Work
S.No. Scope of work
1 Excavation
All excavation including basement and back filling at the depths and dimensions after providing the layout for the
same as per the specification will be done by the Civil Contractor.
Filling will be done including compaction.
JCB Or Manual Excavation will be borne by the Contractor.

2 PCC (1:4:8)
Providing and laying in position cement concrete below the foundation and grade slab of 1:4:8 (M10) including the
cost of centering and shuttering.

3 RCC Work:
All RCC Work including shuttering, centering, and scaffolding will be in the scope of work of the contractor includin
RCC Work for the Underground water tank, Septic Tank, and Overhead tanks, however the amount for Septic Tank
Underground water tank and Overhead tank will be paid separately as per enclosed BOQ.
The rate for Reinforcement Steel (TMT Bar Fe500) work including binding wire is included in the scope and nothing
extra will be payable for reinforcement.
The building is planned considering 5.5 g/Sq.Ft (average for basement, Stilt and upper floors) for TMT Bars
(excluding Binding wire and chairs, wastage).
The Actual consumption will be calculated as per Bar bending schedule prepared using excel or other 3 d modeling
software. Variations in quantity of steel from 5kg/Sqft will be paid extra or recovered if the actual consumption is
less than 5.5 kg/Sqft.
Note: Wastage, Bonding Wire and Chair will not be counted towards the consumption.

4 Electrical Connection and Water Supply for Construction


The contractor has to arrange for water supply on his own for the construction.
Client will arrange for the temporary electrical connection, however, the bill for the same will be paid by the
contractor.

6 Anti Termite Treatment


Anti-Termite treatment in the foundation is in the scope of the contractor.
7 Shuttering Specification:
Steel plate, Props, and shuttering will be used for the slab bottom and film face waterproof ply for sides and
bottoms for the beams
Beam, Wall or Column if width is more than 2ft than Shuttering will done with Ghuggu tool
8 RCC (M-25) work
Nursing Home at Gurgaon

Hipster Decor
NOOR INTERIOR & CONSTRUCTION
Civil & Structure Work (Rev-01) Date 16.01.2023
rk
ope of work
avation
excavation including basement and back filling at the depths and dimensions after providing the layout for the
e as per the specification will be done by the Civil Contractor.
ng will be done including compaction.
Or Manual Excavation will be borne by the Contractor.

(1:4:8)
viding and laying in position cement concrete below the foundation and grade slab of 1:4:8 (M10) including the
of centering and shuttering.

Work:
RCC Work including shuttering, centering, and scaffolding will be in the scope of work of the contractor including
Work for the Underground water tank, Septic Tank, and Overhead tanks, however the amount for Septic Tank,
derground water tank and Overhead tank will be paid separately as per enclosed BOQ.
rate for Reinforcement Steel (TMT Bar Fe500) work including binding wire is included in the scope and nothing
a will be payable for reinforcement.
building is planned considering 5.5 g/Sq.Ft (average for basement, Stilt and upper floors) for TMT Bars
luding Binding wire and chairs, wastage).
Actual consumption will be calculated as per Bar bending schedule prepared using excel or other 3 d modeling
ware. Variations in quantity of steel from 5kg/Sqft will be paid extra or recovered if the actual consumption is
than 5.5 kg/Sqft.
e: Wastage, Bonding Wire and Chair will not be counted towards the consumption.

trical Connection and Water Supply for Construction


contractor has to arrange for water supply on his own for the construction.
nt will arrange for the temporary electrical connection, however, the bill for the same will be paid by the
tractor.

ti Termite Treatment
-Termite treatment in the foundation is in the scope of the contractor.
ttering Specification:
el plate, Props, and shuttering will be used for the slab bottom and film face waterproof ply for sides and
ttoms for the beams
m, Wall or Column if width is more than 2ft than Shuttering will done with Ghuggu tool
(M-25) work
9

11
12
13
14
15
16
17
18

19

20

21

Make:
Cement: ACC, Ultratech,
TMT Bar: SAIL, Jindal, JSW, Tata, Rathi
Bill of Quantity
Footing Casting and Slab Casting will done by Ready Mix Concrete (RMC) with concrete Grade of M25
(Shaila,Vikram,PSY or equivalent)
Plinth Beam Casting and Column Casting will done by Manual concreting with grade of M25 having Ratio 1:1:2 (1:
Cement, 1: Stone Dust), 2: Aggregate (Rodi)
Masonry Work
Sub Structure and Super Structure Masonry Brickwork wall having 9" thickness with Ratio 1:6 (1: Cement, 6: Sand)
and wall having half brick work with Ratio 1:4 (1: Cement, 4: Sand)
Fixing of Door & Window Wooden Frame (Material Will Provided by Client).
Internal Wall Plastering work 12 mm and 15 mm (Rough side of wall) (1:6, Cement : Sand ratio)
Ceiling Plastering work is not of scope of work.
External Plastering work 18mm (1:6, Cement : Sand ratio) (25% sand and 75% dust)
Chicken Mesh of Joints between RCC & Masonry wall
Co-ordination with All/allied work agencies associated with the Project.
If the electrician or plumber uses any building material, it will be borne by client .
Disposal of all mulba and claring the site as per requirement of local authority is the responsibility
of the Contractor and nothing extra shall be payable for this by the client.
To obtain the necessary labor license and safety compliance to same is the responsibility of
contractor and contractor will be responsible for any non compliance and mishappening at the site.

Water Proofing for Basement:


Laying of pre-applied, high-density polyethylene (HDPE) sheet waterproofing membrane treated with unique
pressure-sensitive adhesive and protective coating below the raft slab and on the outer surface of the retaining
wall. The membrane on the retaining wall outsides to be protected by HDPE dimple boards before backfilling of soil
in the excavated areas.
Make - BASF / FOSROC

Water Proofing for Water Tank


Outer surface - Grouting of joints and cracks with Pidilite / SIKA Crack Filler, use of hydro swelling gaskets and
application of 2-3 layers of Acrylic Polymer Modified Cementitious waterproof coating. For additional protection,
the inside surface will be covered with ceramic tiles also.
Product - Sika Top 107 seal, Fosroc Brushbond etc.

Make:
Cement: ACC, Ultratech,
TMT Bar: SAIL, Jindal, JSW, Tata, Rathi
Bill of Quantity
Sl. Item Description Quantity Unit Quoted Rate (Rs.) Amount (Rs.)
No.
1 Construction of basement floor as 3390 Sq.Ft 1600 64,41,000
per the scope of work mentioned above

2 Construction of the Upper floor from 15257 Sq.Ft 1550 2,44,11,200


Ground to 4th floor as per scope of work
mentioned above the average Floor to
floor height for all the floor will be
approximately 3.35 M
(Area for mumty and Machine room is not
included in this area and will be paid on
prorata basis for the actual area of Mumty
and
Machine Room)

3 Construction of Balcony with fixing of the 505 Sqft 1000 5,05,000


base plate for installation of railing and
including 150mm high RCC Railing.

4 Fire Staircase in MS Structure. The column 860 Sqft 1200 10,32,000


beam will be erected in MS Tubular
sections and landing , Steps floor will be of
MS chequered plate. Roof of Fire staircase
will be of Galvalume sheet.
The weight of Tubular section is
considered @ 10kg/sqft.
The Price to be quoted for complete
staircase. The tubular structure should be
provided with primer coating with ready
mixed red oxide zinc chromate primer of
approved brand (Asian, Dulux, Berger). The
extra weight of Tubular Section will be
paid extra as well if weight is less than
10kg/Sqft, a deduction will be applicable
(Quoted Rate should include the
necessary foundation and pedestal for the
Staircase)

5 Construction of RCC Underground Water 75 Cum 12000 9,00,000


Tank including partition for (Internal
fire and domestic water. Volume
Sl. Item Description Quantity Unit Quoted Rate
No. (Rs.)
of
Water Tank)

6 Construction of RCC Overhead tank 40 Cum 12000


including partition for Fire and Domestic (Internal
water Volume of
Water Tank)

7 Waterproofing for basement LS 50/SQFT


including retaining walls and base
slab/foundation
Total Amount
Total Amount in Word : THREE HUNDRED FOURTY ONE LACS.
Extra payable/Recoverable for 1 Per Kg
TMT Bar above or below 5.5kg/Sq.ft

Extra payable/Recoverable for MS 1 Per Kg


Tubular Structure weight above or below
the 10kg/Sqft.
Payment Schedule:
Sl. No. Stage Percentage Payable Remark
1 Basement Floor
Completion of Grade Slab & Foundation 30% % age of Amount Quoted for
basement
Completion of Retaining Wall 15%
Completion of Basement Roof 10%
Completion of Brick Work 30%
Completion of Plaster Work 15%

2 Upper Floors
Columns 10% % age of Payment Quoted
Slab & Beam 35% for upper floor However for
each floor the amount will
Brick Work 30% be
Internal Plaster 10% calculated on prorate basis
External Plaster 15%

3 RCC Underground, Overhead tank & Septic No Part payments


Tank
4 Water Proofing for basement
Advance 10%
Water Proofing of Base slab & Raft 20%
Water Proofing of Retaining Walls 70%
Annexure: floor Plans
Amount (Rs.)

4,80,000

3,37,500

3,41,06,700

Remark

% age of Amount Quoted for


basement

% age of Payment Quoted


for upper floor However for
each floor the amount will
be
calculated on prorate basis