You are on page 1of 1

A B C D A B C D A B C D

11.00 11.00 11.00


3.67 3.67 3.67 3.67 3.67 3.67 3.67 3.67 3.67
1.83 1.83 1.83 1.83 1.15 1.83 1.83

CL3 CL3 CL3


4 4 4

2.15
2.15

2.15
CL1 CL1 CL2 CL2

3.00

3.00
CL3

CL3
4.50

4.50
CL2 CL2

1.00 0.85
3
2.35

2.35
CL1 CL2

9.00
3.00

3.00
9.00

9.00
3 3

CL3
2.50

2.50
CL2 2

1.00
4.50

4.50
CL3
CL2 CL2
2 2

3.00

3.00
2.00
2.00

2.00
1 CL3 1 1
CL3 CL3

1.50
1.50

1.50

CEILING VENTS

SEE CEILING DETAILS


3.67 3.67 3.67 3.67 3.67 3.67 3.67 3.67 3.67

CEILING HEIGHT = 2.70 mts. FFL. TO CEILING. CEILING HEIGHT = 2.70 mts. FFL. TO CEILING. 0.50mm THK. PRE-PAINTED LONG SPAN RIB
TYPE ROOFING SHEETS (COLOR: BROWN)
WITH TEKS SCREW 2 12"
ROOFING AND WALL SIDING
GROUND FLOOR SECOND FLOOR
1 REFLECTED CEILING PLAN 2 REFLECTED CEILING PLAN 1 ROOF PLAN
A4 SCALE 1:100MTS A 4 SCALE 1:100MTS A3 SCALE 1:100MTS

CEILING FINISHES :

EXPOSED UNDERSIDE OF
CL1 CONCRETE SLAB ( PAINTED FINISH )
4.5mm THICK FIBER CEMENT BOARD
4.5mm THICK FIBER CEMENT BOARD ( PAINTED ) ON METAL FURRING
CL2 ( PAINTED ) ON METAL FURRING CHANNELS @ 400mm O.C.
CHANNELS @ 400mm O.C.

CL3 8mm PAINTED SPANDREL

DESIGNED:
PROJECT TITLE & LOCATION: SHEET CONTENTS: CHECKED / REVIEWED BY: SUBMITTED BY: RECOMMENDING APPROVAL: APPROVED BY: SET No. SHEET No.
ANGELBERT P. GOMEZ
REPUBLIC OF THE PHILIPPINES ARCHITECT II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ENCODED:
TARLAC 1ST
DISTRICT ENGINEERING OFFICE
BASIC INFRASTRUCTURE PROGRAM
CONSTRUCTION OF EVACUATION CENTER,
PRINCESS KATHERINE V. MARPURI
LENIN C. CABALU DIANA P. MELEGRITO ERELINA B. SANTOS
A 0
REGIONAL OFFICE III
ARCHITECT I
ANNABELLE C. BASILIO
PARSOLINGAN, GERONA, TARLAC BARANGAY SAN FELIPE, SAN MANUEL, TARLAC SURVEYED: 0 0 33
RODERICK T. MALLILLIN ENGINEER II OIC. CHIEF, PLANNING & DESIGN SECTION OIC. ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ENGINEER II

You might also like