You are on page 1of 10

KOD CU JUMLAH PECAHAN MASA (%) PECAHAN MASA (JAM)

JAM(y) BERSEMUKA KENDIRI PENILAIAN JUMLAH BERSEMUKA KENDIRI PENILAIAN

(A) (B) (C) (A/100 X Y) (B/100 X Y) (C/100 X Y)


EE-320-2:2012-C01 144 66 19 15 100 95 27.4 21.6

EE-320-2:2012-C02 576 90 5 5 100 518.4 28.8 28.8

EE-320-2:2012-C03 72 75 10 15 100 54 7.2 10.8

EE-320-2:2012-C04 200 70 20 10 100 140 40 20

EE-320-2:2012-C05 72 75 15 10 100 54 10.8 7.2

EE-320-2:2012-C06 144 70 20 10 100 100.8 28.8 14.4

JADUAL PENETAPAN PERATUSAN MASA AKTIVITI PEMBELAJARAN DAN PENILAIAN


TAHAP 2
EE-320-2:2012 SINGLE PHASE ELECTRICAL INSTALLATION AND MAINTENANCE
EE-320-2:2012-C03 SINGLE PHASE WIRING MAINTENANCE .
1. Competency Profile Chart (CPC)

SECTOR ELECTRICAL POWER


SUB SECTOR INDUSTRIAL ELECTRICAL
JOB AREA SINGLE PHASE ELECTRICAL INSTALLATION & MAINTENANCE
JOB LEVEL TWO (2) JOB AREA CODE

COMPETENCY UNIT

SINGLE SINGLE PHASE SINGLE PHASE


SINGLE PHASE PHASE WIRING MOTOR & MOTOR
CORE DRAWING WIRING MAINTENANCE CONTROL
COMPETENCY INSTALLATION

EE-320-2:2012-C01 EE-320-2:2012-C02 EE-320-2:2012-C03 EE-320-2:2012-C04

SINGLE PHASE
WIRING TESTING AND
COMMISSIONING

EE-320-2:2012-C06
SINGLE PHASE
ELECTRICAL JADUAL PEMBAHAGIAN MASA PEMBELAJARAN BERSEMUKA
APPLIANCES
MAINTENANCE

EE-320-2:2012-C05
EE-320-2:2012 SINGLE PHASE ELECTRICAL INSTALLATION AND MAINTENANCE
EE-320-2:2012-C03 SINGLE PHASE WIRING MAINTENANCE .
MASA MASA
PELAN MENGAJAR TEORI PELAN MENGAJAR AMALI
AKTIVITI KERJA BERSEMUKA BERSEMUKA
(TAJUK) (TAJUK)
(TEORI) (AMALI)
EE-320-2:2012-C02/P(1/24)/PM
(PENGENALAN KEPADA
1.44
KAWALAN TURUTAN
DOMESTIK SATU FASA)

EE-320-2:2012-C02/P(2/24)/PM
(PENGENALAN KEPADA 1.44
LITAR AKHIR)
EE-320-2:2012-C02/K(1/12)/PM
1. Mengenal pasti EE-320-2:2012-C02/P(3/24)/PM
( BUAT PENDAWAIAN
spesifikasi dan prosedur (PENGENALAN KEPADA 1.44 41.4
PERMUKAAN LITAR AMPU
pendawaian satu fasa PENGALIR DAN KABEL)
KAWALAN SUIS SATU HALA )

EE-320-2:2012-C02/P(4/24)/PM
1.44
(PENGENALAN KEPADA FIUS)

EE-320-2:2012-C02/P(5/24)/PM
(PENGENALAN KEPADA ALAT
1.44
PERANTI PERLINDUNGAN
LITAR)
EE-320-2:2012-C02/P(6/24)/PM
(PENGENALAN KEPADA
1.44
SISTEM PENDAWAIAN
PERMUKAAN)

EE-320-2:2012-C02/P(7/24)/PM
(PENGENALAN KEPADA
1.44
SISTEM PENDAWAIAN
TERSEMBUNYI)

EE-320-2:2012-C02/P(8/24)/PM
(PENGENALAN KEPADA
1.44
SISTEM PENDAWAIAN
KONDUIT)

EE-320-2:2012-C02/P(9/24)/PM
(PENGENALAN KEPADA
1.44
SISTEM PENDAWAIAN SALUR
(DUCTING))
EE-320-2:2012-C02/P(10/24)/PM
(SISTEM PENDAWAIAN
1.44
SESALUR (TRUNKING) DAN
CASING PVC)
EE-320-2:2012-C02/P(11/24)/PM
(PENGENALAN KEPADA
SISTEM PENDAWAIAN 1.44
DULANG KABEL (CABLE
TRAY))

EE-320-2:2012-C02/P(12/24)/PM
(PENGENALAN KEPADA
SISTEM 1.44
PENDAWAIAN KABEL BAWAH
TANAH)

EE-320-2:2012-C02/P(13/24)/PM
(AKTA DAN PERATURAN 1.44
ELEKTRIK)

EE-320-2:2012-C02/P(14/24)/PM
(PERMASAALAHAN AKTA 1.44
DAN PERATURAN ELEKTRIK)
EE-320-2:2012-C02/P(15/24)/PM
1.44
(PERATURAN MS IEC 60364)
EE-320-2:2012-C02/K(2/12)/PM
( BUAT PENDAWAIAN
2. Mengenal pasti alat, EE-320-2:2012-C02/P(16/24)/PM
PERMUKAAN LITAR LAMPU DAN
peralatan dan bahan (PENGENALAN KEPADA 18
SUIS SATU HALAL SECARA SIRI 37.8
pendawaian satu fasa PERALATAN TANGAN)
DAN SELARI)

EE-320-2:2012-C02/K(3/12)/PM
EE-320-2:2012-C02/P(17/24)/PM
( BUAT PENDAWAIAN
3. Menjalanakan aktiviti (PENGENALAN KEPADA
28.8 PERMUKAAN LITAR LAMPU 41.4
pendawaian MESIN ELEKTRIK (POWER
KAWALAN SUIS PEMALAP DAN
TOOLS))
SUIS DUA HALA)
EE-320-2:2012-C02/K(4/12)/PM
4. Menjalanakan EE-320-2:2012-C02/P(18/24)/PM
( BUAT PENDAWAIAN
pemasangan sistem (PENGENALAN KEPADA 21.6
PERMUKAAN LITAR LAMPU DAN
36
pembumian satu fasa SISTEM PEMBUMIAN)
S/S/O 13A)
EE-320-2:2012-C02/K(5/12)/PM
( BUAT PENDAWAIAN
PERMUKAAN LITAR LAMPU
18
DAN, S/S/O 13A-LITAR JEJARI,
D.O.L STATER DAN KIPAS
EE-320-2:2012-C02/P(19/24)/PM SILING )
5. Menjalankan
( PENGENALAN KEPADA EE-320-2:2012-C02/K(6/12)/PM
pemasangan kotak
PEMASANGAN DAN 21.6 ( BUAT PENDAWAIAN
agihan (DB) logan atau
PENDAWAIAN KOTAK FIUS PERMUKAAN LITAR
terlindung satu fasa
AGIHAN (D/B) SATU FASA) LAMPU,S/S/O 13A,-LITAR
GELANG & LITAR JEJARI, 18
LAMPU KECEMASAN, KIPAS
SILING, S/S/O 15A DAN D.O.L
STATER )

EE-320-2:2012-C02/K(7/12)/PM
( BUAT PENDAWAIAN
PERMUKAAN LITAR
LAMPU,S/S/O 13A,-LITAR
18.9
GELANG, LAMPU KECEMASAN,
EE-320-2:2012-C02/P(20/24)/PM KIPAS SILING, S/S/O 15A,
6. Menjalanakan
( PENGENALAN KEPADA PEMANAS AIR DAN D.O.L
pemasangan dan 21.6
ALAT TAMBAH ATAU STATER)
pemasangan aksesori
EKSOSERI ELEKTRIK) EE-320-2:2012-C02/K(8/12)/PM
( BUAT PENDAWAIAN
TERSEMBUNYI LITAR LAMPU,
18.9
S/S/O 13A-LITAR GELANG DAN
LAMPU KECEMASAN)

7. Menjalankan EE-320-2:2012-C02/P(21/24)/PM 14.4 EE-320-2:2012-C02/K(9/12)/PM 30.6


(PENGENALAN KEPADA
( BUAT PENDAWAIAN KONDUIT
JENIS-JENIS PENGUJIAN
pemeriksaan visual PVC SATU FASA BAGI LITAR
SERTA ASAS MENJALANKAN
sistem pendawaian LAMPU DAN S/S/O 13A )
PEMERKSAAN PENGLIHATAN
(VISUAL))
EE-320-2:2012-C02/K(10/12)/PM
( BUAT PENDAWAIAN KONDUIT
EE-320-2:2012-C02/P(22/24)/PM
GI SATU FASA SUIS SATU HALA
8. Menjalankan ujian litar (ASAS MENJALANKAN UJIAN
mati PEMASANGAN PENDAWAIAN
14.4 MENGAWAL 1 LAMPU DAN SUIS 25.2
DUA HALA MENGAWAL SATU
DALAM LITAR MATI)
LAMPU)

EE-320-2:2012-C02/K(11/12)/PM
( BUAT PENDAWAIAN SESALUR
EE-320-2:2012-C02/P(23/24)/PM MINI-PVC CASING, SATU FASA
9. Menjalankan ujian litar (ASAS MENJALANKAN UJIAN
14.4 LITAR LAMPU SUIS 2 HALA DAN 25.2
hidup PEMASANGAN PENDAWAIAN
SUIS PERTENGAHAN
DALAM LITAR HIDUP)
MENGAWAL 2 LAMPU)

EE-320-2:2012-C02/K(12/12)/PM
EE-320-2:2012-C02/P(24/24)/PM
10. Menyediakan laporan ( BUAT PENDAWAIAN SESALUR
aktiviti kerja satu fasa
( ASAS MENYEDIAKAN 10.8
LOGAM-GI TRUNKING SATU 19.8
LAPORAN AKTIVITI)
FASA UNTUK LITAR LAMPU
DAN S/S/O 13A-LITAR JEJARI)
JUMLAH : 518.4 187.2 331.2
RUJUKAN UNTUK PENGIRAAN MASA BERSEMUKA TEORI DAN AMALI

(RUJUK COCU:C02)
TRAINING HOUR
WORK ACTIVITY
RELATED RELATED
KNOWLEDGE SKILLS
1) Identify single phase wiring specifications and procedures 24 46
2) Identify single phase wiring tools, equipment and material 20 42
3) Carry out wiring activities 32 46
4) Carry out single phase earthing system installation 24 40
5) Carry out single phase distribution board (db) metallic or insulated installation 24 40
6) Carry out fitting and accessories installation 24 42
7) Carry out wiring system visual inspection 16 34
8) Carry out dead circuit test 16 28
9) Carry out live circuit test 16 28
10) Prepare single phase work activities report 12 22
(TRAINING DURATION=576) 208 368
JADUAL PENETAPAN PERATUSAN MASA AKTIVITI PEMBELAJARAN DAN PENILAIAN (TEORI)
TAHAP 2
EE-320-2:2012 SINGLE PHASE ELECTRICAL INSTALLATION AND MAINTENANCE
EE-320-2:2012-C03 SINGLE PHASE WIRING MAINTENANCE .

JUMLAH PECAHAN MASA (%) PECAHAN MASA (JAM)


JAM(y) BERSEMUKA KENDIRI PENILAIAN JUMLAH BERSEMUK KENDIRI PENILAIAN
KOD CU A
(A) (B) (C) (A/100 X Y) (B/100 X Y) (C/100 X Y)
EE-320-2:2012-C02 208 90 5 5 100 187.2 10.4 10.4
JADUAL PENETAPAN PERATUSAN MASA AKTIVITI PEMBELAJARAN DAN PENILAIAN (AMALI)
TAHAP 2
EE-320-2:2012 SINGLE PHASE ELECTRICAL INSTALLATION AND MAINTENANCE
EE-320-2:2012-C03 SINGLE PHASE WIRING MAINTENANCE

JUMLAH PECAHAN MASA (%) PECAHAN MASA (JAM)


JAM(y) BERSEMUKA KENDIRI PENILAIAN JUMLAH BERSEMUK KENDIRI PENILAIAN
KOD CU A
(A) (B) (C) (A/100 X Y) (B/100 X Y) (C/100 X Y)
EE-320-2:2012-C03 368 90 5 5 100 331.2 18.4 18.4

JUMLAH PECAHAN MASA (%) PECAHAN MASA (JAM)


JAM(y) BERSEMUKA KENDIRI PENILAIAN JUMLAH BERSEMUK KENDIRI PENILAIAN
KOD CU A
(A) (B) (C) (A/100 X Y) (B/100 X Y) (C/100 X Y)
EE-320-2:2012-C02 576 90 5 5 100 518.4 28.8 28.8

JADUAL PENETAPAN PERATUSAN MASA AKTIVITI PEMBELAJARAN DAN PENILAIAN


TAHAP 2
EE-320-2:2012 SINGLE PHASE ELECTRICAL INSTALLATION AND MAINTENANCE
EE-320-2:2012-C03 SINGLE PHASE WIRING MAINTENANCE .

You might also like