j. Install: Operations at project site, including unloading, unpacking, assembly, erection,
placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning, and similar requirements. k. Indoors: Located inside the exterior walls and roof of the building. l. Outdoors: Located outside the exterior walls and roof of the building. m. Provide: Furnish and install, complete and ready for intended use. n. Unconditioned: Spaces without heating or cooling including ceiling plenums. 3. Abbreviations a. For a list of general abbreviations refer to Section 2.2. b. The following abbreviations apply to this section: 1) AGA: American Gas Association 2) ANSI: American National Standards Institute 3) ASPE: American Society of Plumbing Engineers 4) ASSE: American Society of Sanitary Engineers 5) ASTM: American Society for Testing and Materials 6) AWWA: American Water Works Association 7) ADA: Americans with Disabilities Act 8) AWS: American Welding Society 9) CISPI: Cast Iron Soils And Pipe Institute 10) DFU: Drainage Fixture Unit 11) GEM: Guiding Engineering Manual 12) IAPMO: International Association of Plumbing and Mechanical Officials 13) IP: Ingress Protection 14) NFPA: National Fire Protection Association 15) NSF: National Standards Foundation 16) OSHA: Occupational Safety and Health Administrations 17) PPFA: Plastic Pipe and Fitting Association 18) PDI: Plumbing and Drainage Institute 19) RCJ: Royal Commission of Jubail 20) SASA: Saudi Arabian Standards Association 21) SBC: Saudi Building Code 22) TDS: Total Dissolved Solids 23) UL: Underwriters Laboratories, Inc. 24) WSFU: Water Supply Fixture Unit 4. General Requirements