Professional Documents
Culture Documents
Via Conforti,2 16147 Genova – Italy Phone : +39 010 3993682 Fax: +39 010381718
Mail: info@zafferrani.com 1
The Company guarantees that the machine has been tested in all its parts
in a satisfactory way. The Guarantee is valid for a period of 12 months
and it is limited to the good quality of the machine, of its components
and to the absence of faults in its construction. Excluded from the
guarantee are the electrical motors and any other part which is not of
our production. In this instances however supply the guarantees of the
manufacturing firm of these components. The purchaser has the unique
right of substitution of the defective parts excluding the cost of transport,
packaging and or eventual borrowing to cover operations.It is however
excluded from the guarantee any damage derived from misuse of the
machine, lack of observance of normal maintenance or damage caused
by ill-trained operators.
No reimbursement will be made for possible inactivity of the machine.
WARNINGS
The Company guarantees that the machine has been tested in all its parts
in a satisfactory way. The Guarantee is valid for a period of 12 months
and it is limited to the good quality of the machine, of its components
and to the absence of faults in its construction. Excluded from the
guarantee are the electrical motors and any other part which is not of
our production. In this instances however supply the guarantees of the
manufacturing firm of these components. The purchaser has the unique
right of substitution of the defective parts excluding the cost of transport,
packaging and or eventual borrowing to cover operations.It is however
excluded from the guarantee any damage derived from misuse of the
machine, lack of observance of normal maintenance or damage caused
by ill-trained operators.
No reimbursement will be made for possible inactivity of the machine.
Glass Thickness 4 - 25 mm
Minimum workable piece 500 x 300 mm
Max Glass size 2400 x 3210 mm
Installed Power 8,0 kW
Spindle max speed 9000 rpm
Working Height 800 mm
Overall dimensions 4284x950x222 H mm
Weight 1280 kG
Milling tool lenght 75 mm
6
2 7
4
3 1
Position the body of the machine (1) in your workshop where is possible
to connect the machine to:
- water net
- water discharge
- electrical power
- compressed air
In case of 380 volts, you have to connect the 3phases and the ground tom
the pins inside the main electrical box (see picture)
The setting of all the gauges has to be done one time only
when you install the machine.
The suggested pressures are the followings:
Using a level upon the body of the machine, level the the body using
the feets (3).
6
2 7
4 sx 4 dx
3 1
Position the short conveyor with rollers (2) on the support (4sx) and fix it
with the .
Use a trestle to help you in this operation.
Position the left frame (5) and fix it to the conveyor (2) with the screws
2000x1000x8
Foot_pedal
supports
IMPORTANT:
AT THE END OF THE FIRST INSTALLATION THE TWO SUPPORTS HAVE TO BE
REMOVED
Adjust the height of the short conveyor till the rubber wheels are in
contact with the lower edge of the glass (see piucture) if the conveyor is
correctly adjusted it shoul be at the same level of the body of the
machine.
Repeat the same operation for the long conveyor.
Now it is necessary to adjust the two conveyors (long and short) till they
are at the same level one to each other and till they are in the correct
position referring to the the body.
Proceed as following:
10
Now you have to check if the two conveyors are on the same plane and
proceed as follow;
Let’s start to check the long conveyor, get a glass sheet 2000x1000x8 mm,
put the glass in the clamp and lock it pressing the foot pedal.
Check the distance X in the A zone and in the B zone, these measures must
be the same. Adjust the conveyor if necessary.
A B
11
Now screw in a strong way the screws of the support of the conveyors and
the scews of the frames.
Important: when the machine is on level, you have to screw the locknuts of
the feets.
Now you have to mount and adjust the rolller frames (8):
Always using a glass sheet, put in different positions (see picture) , lock
the glass in the clamp by pressing the pedal foot.
Now adjust the four frames till the rollers of the roller frames are in
contact with the glass.
Now screw all the screws of the frame and of the roller frames.
Important: at the end of the adjustment check if the glass hurt against
the rear part of the clamp in the moment it enters into the body of the
machine.
If necessary adjust the rolller frames toward the operator.
12
1- Touch screen
2- Emergency button
3- Motor Power ON
4- Motor PowerOFF
5- Start Working
1 2
13
1 2
3
4
5
14
15
1) You can reach the page of JOG by pressing the blu arrow.
2) In this page you can move the axis in a manual mode, adjust the
working speed of the axis and adjust the rotation speed of the
motor of the tool.
This is the
JOG PAGE
16
17
“Automatic”
“Programs”
“Programmazione”
18
19
20
21
22
Click on tool N1
23
24
25
26
27
Now we will see how to postion the glass sheet and hov to lock it.
To position the glass sheet in the correct position you have to move
manually the glass tiil you can reach by your hands the plastic stroke.
Now tou have to pull out by hand the plastic stroke, to to put the glass
in contact with the stroke.
Press the foot pedal (see picture). Now the glass is strogly lolcked in the
macjine and in the correct position.
28
Press now the button START WORKING and the machine will start to
work the notch on the glass.
Remember that if you have chosen a double tool, after the first
roughuing passage the machine will automatically, after some seconds,
strt the second finishing passage.
After the second passage, you can unlock the glass by pressing the foot
pedal.
In case the programs provides more than one notch, see the elatine
chapter.
29
The tools for the AZVMILL are standard tolls and availabe all over the
world.
The have screw attack of ½ “ gas + standard cone and they are 75 mm
long.
The tool can be a double tool, by a double tool you can make two different
processings by one tool only.
Just for greater understanding let’s study the two tools we have used to
make a notch in chapter HOW TO CREATE A PROGRAM AND MAKE A NOTCH
30
31
32
Diam = diameter of the tolls (the parts which remove the galss)
33
OVM = (mm) “allowance”, how may millimeter the tool doesn’t remove and
which will be removed by a further finishing passage with another tool
Max Diam: maximum diameter of the tool (any part which cuold go in
collision with the glass)
Let’s uppose to load the Toll N°3 we have used in the previous chapter.
The realtive parameters are:
34
OVM = 0mm because the tool has to reach the dimension of the notch
without any further passage.
This means that the removal of this tool is 0,5 mm because the previous
passage by the toll N°1 had an OVM=0,5mm
35
Click “Programms”
Click “LIST”
36
Click “CONFIRM”
37
Then click on
“INSERISCI”
38
Click on “INSERISCI”
and you will reach the
following page.
39
40
Click “Programs”
41
Four parametric
figures are shown.
42
43
Pre-milling Milling
44
45
46
Click “COPY”
47
48
49
50
51
Figures NR 1
Figure NR 2
52
Moreover, clicking on
“ESCLUDI” one of the figure
can be temporary deleted.
By clicking on “SPOSTA
MACRO””you can change the
working sequence of the
figures.
53
54
Click on
“NUOVE DIM”
55
56
57
58
59