You are on page 1of 1

Leveling and Adjustment Calculate

Job Title: Start Value : 46.0340


Job No: Finish Value : 42.4330
Date: Misclosure: -0.0060
Observer: Set-ups: 24.000
Staffman: Error/Set-up: -0.0003
?
Point Back Inter For Collimation Rise (+) Reduced Adjustment Adjusted Final
Remarks Point No
No Sight Sight Sight Height Fall (-) Level (m) Level Level

GPS -PUNJ LLOYED 212K 1.165 47.199 46.034 46.034 LHS EXT ROAD GPS -PUNJ LLOYED 212K 46.034
TS NEW BT EDGE PLL 0.106 1.192 46.113 -0.027 46.007 0.0003 46.007 TS NEW BT EDGE PLL 46.007
SB-9 NEAR KEPL CAMP 2.626 3.385 45.354 -3.279 42.728 0.0005 42.729 SB-9 NEAR KEPL CAMP 42.729
TBM-9 HANUMAN TEMPLE 0.800 1.337 44.817 1.289 44.017 0.0008 44.018 TBM-9 HANUMAN TEMPLE 44.018
TBM-8 LHS ROW PILLER 0.884 1.928 43.773 -1.128 42.889 0.0010 42.890 TBM-8 LHS ROW PILLER 42.890
D-8 NEW PILLER 1.280 43.773 -0.396 42.493 0.0013 42.494 D-8 NEW PILLER 42.494
TBM-7 IOCL PILLER 0.807 0.335 44.245 0.945 43.438 0.0013 43.439 TBM-7 IOCL PILLER 43.439
TBM-6A LHS IOCL CHEMBER BOX 0.438 44.245 0.369 43.807 0.0015 43.809 TBM-6A LHS IOCL CHEMBER BOX 43.809
TBM-6 LHS IOCL PILLER 0.672 1.040 43.877 -1.040 42.767 0.0015 42.769 TBM-6 LHS IOCL PILLER 42.769
TBM-5 RHS IOCL CHEMBER BOX 0.170 43.877 0.502 43.269 0.0018 43.271 TBM-5 RHS IOCL CHEMBER BOX 43.271
TBM-4 RHS ROW PILLER 205650 2.038 0.430 45.485 -0.430 42.839 0.0018 42.841 TBM-4 RHS ROW PILLER 205650 42.841
SB-7 RHS 3.093 2.447 46.131 -0.409 42.430 0.0020 42.432 SB-7 RHS 42.432
TBM-3 LHS RE-WALL 1.254 1.360 46.025 1.733 44.163 0.0023 44.165 205+420 TBM-3 LHS RE-WALL 44.165
TBM-2 RHS RE-WALL 0.541 0.219 46.347 1.035 45.198 0.0025 45.201 205+380 TBM-2 RHS RE-WALL 45.201
TBM-1 LHS RE-WALL 1.440 1.660 46.127 -1.119 44.079 0.0028 44.082 205+320 TBM-1 LHS RE-WALL 44.082
S-6 NEW PILLER LHS 3.212 2.878 46.461 -1.438 42.641 0.0030 42.644 S-6 NEW PILLER LHS 42.644
SB-6 RHS 4.245 3.682 47.024 -0.470 42.171 0.0033 42.174 SB-6 RHS 42.174
S-5 NEW PILLER LHS 3.824 3.818 47.030 0.427 42.598 0.0035 42.602 205+090 S-5 NEW PILLER RHS 42.602
S-4 NEW PILLER RHS 3.533 3.800 46.763 0.024 42.622 0.0038 42.626 205+120 S-4 NEW PILLER LHS 42.626
SB-4 RHS 3.974 3.614 47.123 -0.081 42.541 0.0040 42.545 205+080 SB-4 RHS 42.545
SB-3 RHS 1.395 3.785 44.733 0.189 42.730 0.0043 42.734 205+000 SB-3 RHS 42.734
S-3 NEW PILLER LHS CR ROAD 1.383 1.148 44.968 0.247 42.977 0.0045 42.982 204+950 S-3 NEW PILLER LHS CR ROAD 42.982
SB-2 LHS 1.840 2.104 44.704 -0.721 42.256 0.0048 42.261 SB-2 LHS 42.261
CP 1.869 1.955 44.618 -0.115 42.141 0.0050 42.146 CP 42.146
S-2 RHS NEW PILLER 0.935 1.507 44.046 0.362 42.503 0.0053 42.508 S-2 RHS NEW PILLER 42.508
S-1 LHS NEW PILLERUNDER TEMPLE 1.400 1.065 44.381 -0.130 42.373 0.0055 42.379 S-1 LHS NEW PILLERUNDER TEMPLE 42.379
CP 1.653 1.334 44.700 0.066 42.439 0.0058 42.445 CP 42.445
GPB-9 NEAR P-15 LHS GANGA 1.665 44.700 -0.012 42.427 0.0060 42.433 GPB-9 NEAR P-15 LHS GANGA 42.433

GPS NEW PLL LHS STATION ROOM 46.400


RAJENDRAPULL STATION STAIR 46.529