You are on page 1of 1

File Name: Flowchart of the production

File Number: W1-751-06-02

Send back to the Return goods and get


Production Plan Purchasing Plan Purchasing Raw Material Inspection
purchasing department supplemental materials

Subcontract(non-SMD)

Get the materials Put into the Send out from


warehouse the warehouse
Subcontract(patching,
programming, testing)

Semi-finished
Pre- products
processing welding

Programming High temperature aging Install the battery


Assembly Assembly Assembly Assembly Assembly
station 1 station 2 station 3 station 4 station 5
Replace the module
Non-Replacement module

Assembly Assembly Assembly Assembly Assembly


station 10 station 9 station 8 station 7 station 6
Machine
maintenance

Put out of the Pack and put out of Outgoing quality Inspection of the
Packing Machine testing Safety testing appearance and basic
warehousel the warehouse control
function

Non-Replacement module

Note: Module testing debugging and programming are regarded as the key process, and welding is defined as the special process.
Machine maintenance

You might also like