You are on page 1of 2

INTEGRATED MANAGEMENT SYSTEM

STANDARD OPERATING PROCEDURE

FABRICATION TOLERANCE CHART

DOC. NO. MUPL-IMS-QA-19


Issue No.: 01 Issue date: Revision date : -- Revision No. : 00
01/07/2019

1.0 PURPOSE

The purpose of this SOP is to define the Tolerances for Fabrication of Steel Structures.

2.0 SCOPE

This Standard Operating Procedure is applicable to entire Madhav Udyog Pvt. Ltd.

3.0 RESPONSIBILITIES
 Incharge – QA&I is overall responsible

4.0 PROCESS DESCRIPTION

Sr. Operation Inspection Parameters Tolerances


No.
1 Cutting/Cropping Total Length as per Job Card +2.0 mm
End Skewing +1.0 mm
2 Hole Diameter +0.5 mm
Edge Security ±2.0 mm
Punching & Back Mark ±1.0 mm
Drilling Hole to Hole Distance ±1.0 mm (consecutive )
±2.0 mm (cumulative)
3 As per Sketch N.A
Stamping Impression from top to bottom Refer limit sample ( if
required)
4 +5.0 mm on specified length
Notching Size of Notch
5 Heel Grinding Size of Grinding In length ±5.0%
In Thickness ±1.0 mm
6 Bending Bending ±2.0 mm in 300 mm lg.
7 Distance between Hols ±1.0 mm
Hole After Bending Back Mark ±1.0 mm
Distance from Hole to Bend Line ±1.0 mm
8 Welding Surface Preparation As per WPS
Fillets Size As per Shop Drawing

Prepared by: Reviewed by: Approved by:

Engineer QA-HOD Head - Operation

1
INTEGRATED MANAGEMENT SYSTEM
STANDARD OPERATING PROCEDURE

FABRICATION TOLERANCE CHART

DOC. NO. MUPL-IMS-QA-19


Issue No.: 01 Issue date: Revision date : -- Revision No. : 00
01/07/2019

You might also like