Professional Documents
Culture Documents
Remove Inflatable Tent from Roll out the Inflatable Tent. Lay the Inflatable Tent out flat.
Protective Cover.
FOUR FIVE SIX
Inflatable Tent Accessories* Attach the accessories using zips. Each leg on the Inflatable Tent has a valve.
Layout your Walls and Awnings and Select valve to attach pump, screw inflatation
value closed and leave cap off.
confirm positioning. On all other valves screw tight and fix cap.
Connect the pump to selected Inflation During the inflation process raise legs Ensure all legs are lined up and canopy
Valve and begin inflation. into the center until all legs are upright. is centered. Check frame is firm.
TEN
IMPORTANT NOTES:
Check the wind and weather
conditions before commencing
construction.
Ensure you have the correct ground
fixings for your application.
Fix Stakes and Guide Ropes or attach When the tent is in use, do not leave Over pressure relief valve system
Sandbags. your tent unattended. DO NOT TOUCH.
Remove Stakes and Guide Ropes or Ensure area is clear of persons. Remove all air from the tubes.
detach Sandbags. Ensure area is dry and clean.
Unscrew all valves to deflate Tent.
FOUR FIVE
IMPORTANT NOTES:
Ensure Canopy and Walls Fabrics are
completely dry before packing down
and fitting the Protective Covers.
During transport do not put heavy
items on top if the Tent.
Fold Tent up neatly laying the Canopy Pack the dry and clean Inflatable Tent
and Legs on top of each other. into Protective Cover.
Roll Tent up.
ACCESSORIES
INCLUDED ITEMS:
NOT INCLUDED