Using Future Data


to Predict your Process
2015 TechCon Session

OSIsoft, LLC
777 Davis St., Suite 250
San Leandro, CA 94577 USA
Tel: (01) 510-297-5800
Web: http://www.osisoft.com

© 2015 by OSIsoft, LLC. All rights reserved.

No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or
by any means, mechanical, photocopying, recording, or otherwise, without the prior written permission
of OSIsoft, LLC.

OSIsoft, the OSIsoft logo and logotype, PI Analytics, PI ProcessBook, PI DataLink, ProcessPoint, PI Asset
Framework (PI AF), IT Monitor, MCN Health Monitor, PI System, PI ActiveView, PI ACE, PI AlarmView, PI
BatchView, PI Coresight, PI Data Services, PI Event Frames, PI Manual Logger, PI ProfileView, PI
WebParts, ProTRAQ, RLINK, RtAnalytics, RtBaseline, RtPortal, RtPM, RtReports and RtWebParts are all
trademarks of OSIsoft, LLC. All other trademarks or trade names used herein are the property of their
respective owners.

U.S. GOVERNMENT RIGHTS

Use, duplication or disclosure by the U.S. Government is subject to restrictions set forth in the OSIsoft,
LLC license agreement and as provided in DFARS 227.7202, DFARS 252.227-7013, FAR 12.212, FAR
52.227, as applicable. OSIsoft, LLC.

Published: May 8, 2015

2|P age
Using Future Data to Predict your Process

Contents
Objectives ................................................................................................................................................. 4
Prerequisites ............................................................................................................................................. 4
Materials ................................................................................................................................................... 4
Instructions ............................................................................................................................................... 4
1. Introduction ...................................................................................................................................... 5
2. Challenge........................................................................................................................................... 7
3. Use PI Coresight to visualize raw data .............................................................................................. 9
4. Integrate future data in PI AF.......................................................................................................... 11
4.1. Associate future tags with PI AF Attributes ............................................................................ 12
4.2. Create asset-based analytics to leverage future data in PI AF................................................ 15
5. Create an element relative PI Coresight display ............................................................................. 25
6. Create a PI DataLink Report to Schedule Maintenance Teams (Time allowing) ............................ 26
7. Create a PI ProcessBook Display to show anticipated production from solar panels (Time
allowing).................................................................................................................................................. 33
Annex A: List of PI AF substation parameters ......................................................................................... 42
Annex B: PI AF Categories ....................................................................................................................... 44
OSIsoft Virtual Learning Environment ........................................................................................................ 46

3|P age
2015 TechCon Session

Objectives
o Define “future data” in the PI System
o List the ways future data can be injected into the PI System
o Describe why PI AF is the best container for metadata
o Configure AF templates that reference these future PI points
o Create AF elements based on those templates
o Create AF analyses that that shows delta between forecast and actual
o Create PI Event Frames to capture the metadata around the results
o Create a PI Coresight Display to show your data
o Create a PI DataLink Report and a PI ProcessBook Display to show your data (optional – time
permitting)

Prerequisites
o Some familiarity with PI Data Archive and PI Asset Framework
o Some familiarity with the PI Visualization clients (PI Coresight, PI ProcessBook, PI DataLink)

Materials
Provided for you:

o PI Data Archive server with PI Points and data


o PI Asset Framework with a base hierarchy
o PI Clients installed: PI Coresight 2015, PI ProcessBook 2015, PI DataLink 2014 SP1

Instructions
◊ This lab consist of 5 exercises (2 optional).
◊ The exercises can be performed independently by using the CaliforniaWeather_Completed
database for sections 5,6, and 7
◊ For each exercise, general instructions are provided followed by step-by-step instructions.
◊ If you feel comfortable with the general instructions, go ahead and try to do the exercises on
your own. Don’t hesitate to ask questions to the lab instructor if needed.
◊ If you choose to follow the step-by-step instructions, complete each action marked by a red
diamond symbol.

4|P age
Using Future Data to Predict your Process

1. Introduction
In this session, we will describe one way to use “future data” in the PI System. Let’s start with a
common definition, in this case from Wikipedia:

Forecasting is the process of making statements about events whose actual outcomes (typically) have
not yet been observed. A commonplace example might be estimation of some variable of interest at
some specified future date. Prediction is a similar, but more general term. Both might refer to formal
statistical methods employing time series, cross-sectional or longitudinal data, or alternatively to less
formal judgmental methods. Usage can differ between areas of application: for example, in hydrology,
the terms "forecast" and "forecasting" are sometimes reserved for estimates of values at certain specific
future times, while the term "prediction" is used for more general estimates, such as the number of times
floods will occur over a long period.1

And in the PI System, we define “future data” as time-series data that isn't measured and collected in
real-time from machine sensors, and will typically have a timestamp in the future. From its primary
function as a data historian, the PI Data Archive is designed to preserve all time-series data, which
includes future data. As a result, future or "non-measured" data will exist in the future but also in
the past (e.g., important forecasts kept for subsequent analysis, optimization, or auditing).
Future data is now handled natively by PI System 2015 –including storage, analytics, data access,
reporting, and visualization– and is most useful when compared or combined with real-time or
historical data.
Although the internals of future data in the PI System and the configuration and
administration tasks associated to it are not in the scope of this lab, let’s take a quick look
at how future data can be stored into the PI System.

In PI System 2015, a new concept has been introduced: future PI Points. Those can be
created by setting the new “future” attribute to 1 at point creation. This attribute can be
set using the PI SMT Point Builder or the Excel PI Builder add-in and cannot be modified
after the point has been created.

Tags with the attribute set to 0 – referred to as “historical tags” – are identical to the tags in all previous
versions and will reject data with timestamps more than 10 minutes into the future.

1
http://en.wikipedia.org/wiki/Forecasting

5|P age
2015 TechCon Session

The picture below shows a couple ways to create future tags

Generally speaking, future tags should be used when storing data that is not collected sequentially in
chronological order. For example, process or operational data should be kept in historical tags because it
is measured and collected in real time. On the other hand, forecasts or any form of predictive data over
an arbitrary time range are perfectly suited for future tags. Data for all future tags is stored in
completely separate archive files. Future data never moves to the historical archive files even after the
future data ages into the past. The archive files for future tags will be created automatically as data is
written to the tags. All future archive files will be created in the directory specified during installation,
and this location can be changed any time afterwards using the new Archives plug-in included with PI
SMT 2015.

Writing data to future tags is just like writing data to historical tags – just with different timestamps.
Thus, in general, you should be able to use all your favorite programs and tools for writing data. The
allowed timestamp range is January 1970 to January 2038. Some common options are the following:

o Standard OSIsoft interfaces like the PI UFL, PI RDBMS, or PI HTML Interfaces


o Configured analyses and calculations with Asset Analytics, starting with PI Server 2015 Beta 3
o A custom application using PI AF SDK, PI Web API, or PI OLEDB Enterprise
o PI SMT Archive Editor

The ways in which you use future data are only as limited as your need and creativity. In this example
we will use the analytics capability of the PI Server 2015 to determine forecast error from actual, create
more forecast values, etc.

For more information, please watch our webinar titled, Capturing Future Data with PI Server 2015 BETA,
available on our website (www.osisoft.com) under Resources  Webinars  Webinars on demand
(http://www.osisoft.com/Templates/item-abstract.aspx?id=11985)

6|P age
Using Future Data to Predict your Process

2. Challenge
You have been hired as a consultant by Sunshine Corp, LLC to help them take advantage of the new
future data features of the PI System 2015.

On your first day, you’re provided with weather data from weather stations in the following airports, all
in the beautiful state of California:

o Bakersfield Meadows Field Airport (KBFL)


o Los Angeles International Airport (KLAX)
o Palo Alto Airport (KPAO)
o Porterville Municipal Airport (KPTV)
o San Francisco International Airport (KSFIO)
o San Jose International Airport (KSJC)
o Oakland International Airport (KOAK)

For each one of the above airports, the following PI Points are available

Real-time data tags Future data tags

• NWS_<Airport Code>_PressureIn • <City>.ChanceOfFog.Forecast


• NWS_<Airport Code>_RelativeHumidity • <City>.ChanceOfFrost.Forecast
• NWS_<Airport Code>_Temp • <City>.ChanceOfHighTemp.Forecast
• NWS_<Airport Code>_Visibility • <City>.ChanceOfOvercast.Forecast
• NWS_<Airport Code>_Weather • <City>.ChanceOfRain.Forecast
• NWS_<Airport Code>_WindDirection • <City>.ChanceOfRemDry.Forecast
• NWS_<Airport Code>_WindSpeed • <City>.ChanceOfSnow.Forecast
• <City>.ChanceOfSunshine.Forecast
• <City>.ChanceOfThunder.Forecast
• <City>.ChanceOfWindy.Forecast
• <City>.CloudCover.Forecast
• <City>.DewPoint.Forecast
• <City>.FeelsLike.Forecast
• <City>.HeatIndex.Forecast
• <City>.Humidity.Forecast
• <City>.Precipitation.Forecast
• <City>.Pressure.Forecast
• <City>.Temperature.Forecast
• <City>.Visibility.Forecast
• <City>.WeatherDescription.Forecast
• <City>.WindChill.Forecast
• <City>.WindDir16Point.Forecast
• <City>.WindDirDegree.Forecast
• <City>.WindGust.Forecast
• <City>.WindSpeed.Forecast

7|P age
2015 TechCon Session

After discussing with your customer, you decide to take the following approach:

o Look at some of the raw data points using PI Coresight


o Put some context around the data by creating a structure in PI Asset Framework (PI AF)
o Build a few PI AF analyses to compare forecasts with simulated process data, and create
aggregated calculations using future data.
o Use PI Coresight to create a display showing significant weather data for different sites
o Create an event report using PI DataLink to keep track of significant weather events

8|P age
Using Future Data to Predict your Process

3. Use PI Coresight to visualize raw data


First we want to build a PI Coresight display holding all forecasted temperature.

The display should look as follows:

Play around with this display and explore PI Coresight functionalities. Try to answer the following
questions:

• How is the current time represented?


• What does the Now button do? Do you notice any particular behavior? (Hint: Navigate in the
past until the current time is not displayed on the trend, then do the same in the future)

9|P age
2015 TechCon Session

Step-by-step instructions:

◊ Open Internet Explorer, navigate to the PI Coresight landing page (http://localhost/Coresight),


and create a new display.

◊ In the Search Pane, search for all temperature forecast tags on the PI Data Archive Server.

◊ Drag all the forecast PI tags returned by the search onto the display, and display them as value
symbols.
◊ Build a trend underneath the values showing all forecasted temperatures.
◊ Using the Timebar control, change the time range of the trend to show exactly 1 day in the past
and 1 day in the future. Notice the dotted line representing the current time.
◊ Modify the trend to show one scale for all traces and compare the temperature forecasts
between them.
◊ Navigate in the past/future. Do the values displayed by the Value symbols change? When?
◊ Change the trend to a Table symbol, and note the Maximum/Minimum values of the forecasted
temperature over 48 hours periods.
◊ PI Coresight automatically saves your work. Change the table back to a trend and modify the
display with the name of your choice.

10 | P a g e
Using Future Data to Predict your Process

4. Integrate future data in PI AF


Our customer has a PI AF Structure that already holds real-time data.

Take some time to familiarize yourself with the database (how is it organized, what are the templates,
which data references are used, etc.). Pay close attention to the template NWS_WeatherStation, as it is
the one we are going to use the most throughout the rest of the lab.

11 | P a g e
2015 TechCon Session

4.1. Associate future tags with PI AF Attributes


We now need to integrate the future data tags into our PI AF Structure. There are several ways to do
this. We could, for example, create an element template that only holds forecast data and have our
forecasted and observed weather live in separate elements. Instead, we will simply extend the
NWS_WeatherStation element template, and use AF Categories to discriminate forecasted weather
from actual observations. This approach is simpler, and will also be very convenient when we get to use
the PI Coresight Element-Relative features to compare forecasted and observed weather conditions
across different cities.

An Excel file called NWS_WeatherStation+FutureData.xlsx is available under C:\TechCon_Lab\ and has


references to Future Data tags. That file can be used in conjunction with the PI Builder Excel add-in to
integrate future tags in the CalifornoaWeather_Lab PI AF Database

Would you have taken a different approach? Why?

12 | P a g e
Using Future Data to Predict your Process

Step-by-step instructions:

◊ Open the file C:\TechCon_Lab\NWS_WeatherStation+FutureData.xlsx.


◊ Review the configuration of the template, especially the AttributeConfigString (Note: You can
consult the list of PI AF Substitution parameters annexed to this document to figure out whether
the configuration strings created used make sense?).
◊ Using the PI Builder Excel add-in, edit the NWS_WeatherStation Element Template.

o Make sure the CaliforniaWeather_Lab AF database is selected as your destination


database in the Connections pane on the left-hand side of the PI Builder Ribbon

o Click on the Publish button in the PI Builder Ribbon.

o In the Publish Options dialog that appears, select Edit Mode: Create and Edit and check
the Automatically create missing categories option.

(Bonus question: Why don’t you need to select the option to Create or Update PI points
in this case?)

◊ Back in PI System Explorer, validate the NWS_WeatherStation Element Template was


successfully edited and that you can now see the forecast data associated to your weather
stations.

13 | P a g e
2015 TechCon Session

14 | P a g e
Using Future Data to Predict your Process

4.2. Create asset-based analytics to leverage future data in PI AF

Next, we are going to create analyses based on the future data we just brought into PI AF.

4.2.1. Create an analysis to calculate the difference between an observed value and a forecasted
value
Create an analysis template that calculates the difference between the forecasted temperature and its
actual observed value. This analysis needs to be triggered every time the real-time temperature gets a
new value and they need to use a specific Analysis category named Weather Analysis (Note: there is
more info on AF Categories in Annex B).

15 | P a g e
2015 TechCon Session

Step-by-step instructions:

◊ In PI System Explorer’s Library pane, select the NWS_WeatherStation Element Template.


◊ Navigate to the Analysis template tab.
◊ Create an expression analysis calculating the difference between the forecasted and the observed
values, and storing them in attribute templates. This calculation needs to be triggered whenever the
measured temperature or wind speed gets a new value.

o Create a new Expression analysis called ‘Temperature Delta Calculation’.

Note: You can create Categories as needed.


o Select one of your airports as an Example Element.

This will allow us to use the ‘Evaluate’ button to test your analyses, and also to take
advantage of the ability to add attributes in expressions from the Attributes panel on the
right of the expression as we will see in a moment.

o Create an expression calculating the difference between the measured temperature and its
corresponding forecasts, and map the result to an output attribute (Hint: the latter can be
created on the fly, and modified later on).

Note: you can use the Attributes panel on the right of the expression to insert the relative
references to attributes in the expressions.

o Click the Evaluate Button to test the expressions you created.

16 | P a g e
Using Future Data to Predict your Process

o You can also preview your results will be like by right-clicking on the analysis and clicking
“Preview Results”  “Generate Results”.

o Under ‘Scheduling’, choose ‘Event-Triggered’.


o Set the analysis to trigger on the observed temperature.

o Navigate to the Attribute Templates tab, and select the ‘Temperature Delta’ Attribute just
created.
o Set it its default UOM to delta degree Fahrenheit (delta °F) and add the Weather Analysis in
the categories (Hint: you will likely need to create that category! This should be pretty
straightforward, but if you’re not sure how, refer to Annex B).
o Check in your changes.

17 | P a g e
2015 TechCon Session

4.2.2. Create an analysis to calculate the maximum and minimum forecasted temperatures over a
24h period

We are now interested in calculating, every day around midnight, the forecasted maximum and
minimum temperatures over the upcoming 24 hours.

The calculation must be run every day at 12:30 AM, but the result must have a timestamp at 12:00 AM.

18 | P a g e
Using Future Data to Predict your Process

Step-by-step instructions:

◊ Navigate to the Library pane in PI System Explorer and select the NWS_WeatherStation Element
Template.
◊ Create an expression analysis called ‘Min-Max. Temperatures’ and select, as you did before, an
example element.

◊ Create expressions calculating the maximum and minimum values for the forecasted temperature ,
over a 24h period starting at 12:00AM every day.

◊ Configure the analysis to run every day at 12:30 AM (Note: our forecast data is updated every day at
12:15 AM).

◊ Override the output timestamp so that it shows at 12:00 AM although calculations are performed at
12:30 AM.
o In the Scheduling section at the bottom of the Analysis Management window, click
Advanced…
o Check the Override output timestamp option and enter t (PI Time abbreviation for Today) as
your output timestamp.

19 | P a g e
2015 TechCon Session

Note: Could this timestamp have been in the future? Absolutely! Just make sure your output
attribute is mapped to a future tag, and override the output timestamp with a time in the
future such as *+24h, t+48h, etc.

◊ Check in your changes.

As before, let’s make sure our output attributes have the correct unit of measure and AF category.

◊ Navigate to the Attribute Templates pane.


◊ Set the default UOM to degree Fahrenheit and the category to Weather Analysis for the Forecasted
Minimum Temperature and Forecasted Maximum Temperature attributes.

◊ Check in your changes.

20 | P a g e
Using Future Data to Predict your Process

4.2.3. Create the PI Points holding the results of the analyses and perform backfilling

Now that our weather analyses were properly created, we will create the PI Points holding the results.
This will increase performance a lot when clients request for historical data for those analyses. If we did
not write the calculations results in PI Points, they would be performed on the fly every time a client
asks for them, which would result in greater overhead.

21 | P a g e
2015 TechCon Session

Step-by-step instructions:

◊ Navigate to PI System Explorer’s Elements pane, select one of your weather stations. Notice how
our analyses are complaining that the PI Points they are supposed to write to do not exist.

◊ Right-click on the root element in your PI AF Database and select Create or Update Data Reference.

◊ Verify that data references were properly created.

Note that we could have created the data references element by element, but that, of course, would
have taken longer.

22 | P a g e
Using Future Data to Predict your Process

Let’s now backfill our weather analyses in order to have some past data to work with.

◊ Navigate to PI System Explorer’s Analyses pane.

◊ Check the newly created analyses, and click on Backfill checked analyses.

◊ Set the start and end times to *-7d and * respectively, then click the Queue button. This will backfill
a week of data into our analyses.

23 | P a g e
2015 TechCon Session

◊ Wait until our backfilling is completed and verify that our weather analyses now have data for the
last 7 days.

You can verify that the timestamps for our forecasted maximum/minimum temperatures were
properly set by right clicking on one of them and selecting Time-Series Data.

24 | P a g e
Using Future Data to Predict your Process

5. Create an element relative PI Coresight display

Note: At this point, your AF Database should be ready to work with. If it is not, don’t worry, we have
your back! Simply switch to the AF Database called CaliforniaWeather_Completed, and use that one for
the rest of the exercises.

We now want to build a weather dashboard for data using PI Coresight. For this exercise, you will not be
provided with a step-by-step solution. Instead, we want you to explore the features of PI Coresight
related to PI AF and build a display that would be useful in your opinion.

Here’s an example display:

◊ Explore different features such as:


o Switching between assets using the PI Coresight Related Assets features
o Locking the time range for a specific trend
o Etc.
◊ Reflect on the different ways future data (be it weather data or other type of data) can be used in
your industry

25 | P a g e
2015 TechCon Session

6. Create a PI DataLink Report to Schedule Maintenance Teams (Time allowing)

Every two weeks, you need to send a maintenance team to each of the weather stations to check on the
equipment, check calibration, gather samples, etc. Historically, the productivity and thoroughness of
maintenance teams is dependent on weather conditions such as temperature, humidity, and
precipitation. Sending the teams out during favorable weather conditions will save the company a
significant amount of money, and will also keep the maintenance workers happy. After all, would you
want to be outside when it is freezing cold and pouring rain?

Your goal is to use the forecast weather data and PI DataLink to generate a report that makes it easy to
determine the best day(s) out of the next two weeks to send a maintenance team to each site. You can
decide on your own “ideal” conditions, but if you want guidance, let’s assume 70⁰F, no precipitation, no
wind, and no humidity are ideal conditions. You can choose to include as few or as many of these items
in your report as you want. Also, to avoid clutter on the spreadsheet, it would be great if you only need
to look at one site at a time, but can easily switch between the various sites in the same spreadsheet.

As always, you can try to complete this task on your own first, but the next page has instructions for one
possible way to complete this task.

26 | P a g e
Using Future Data to Predict your Process

Step-by-step instructions

◊ Open Microsoft Excel


◊ Create fields for the start and end time, and fill in “t” and “t+14d” respectively:

◊ From the PI DataLink ribbon, select Calculated Data.

◊ For Data Items, browse for the Bakersfield Temperature forecast


(\\PISRV1\CaliforniaWeather_Lab\California\Bakersfield\Bakersfield Meadows Field
Airport|Forecasted Temperature).

◊ As shown in the image above, also set the Start time and end time to the cells you set up before.
◊ Set the time interval to 1d, the Calculation mode to average, and check Show start time.
◊ Click OK to display daily temperature averages for the next two weeks at Bakersfield Airport:

27 | P a g e
2015 TechCon Session

This shows the temperatures for one site, but we want to be able to easily switch between sites, so let’s
set that up next.

◊ Select the cell two rows above Avg. Temp. (cells D4:D5), then from the PI DataLink ribbon, select
Search:

◊ Using the element California as the root of your search, search for “forecasted temperature”
and select all of the “Forecast Temperature” results (hold shift to select all attributes or just hit
Ctrl + A
◊ Move the “Root path length” slider all the way to the right to Maximum, and choose Drop-down
list for “Insert root paths in”.

28 | P a g e
Using Future Data to Predict your Process

◊ Click OK, and you spreadsheet should look like:

Now let’s reorganize it a little bit!

◊ Type “Root Path” in Cell A3, and move the contents of the cell holding the root path (D4) to cell
B3.
◊ Click in any of the cells holding the average temperatures. The Calculated Data Pane should
open on the right hand side.
◊ Change the Root Path to Cell B3 and the Data Item to cell D5.

29 | P a g e
2015 TechCon Session

◊ Click OK and you should be able to choose any site from the root path drop-down list, and the
daily average temperatures will update to the selected site.

30 | P a g e
Using Future Data to Predict your Process

Now that this is done for temperature, it should be fairly easy to add other calculated values, such as
total precipitation, maximum wind speed, average humidity, and/or any other attributes you want to
use. Let’s start by adding Total Precipitation:

◊ In the cell to the right of Temperature (E5), type Forecasted Precipitation (this is the name of the
attribute for forecasted precipitation).

◊ From the PI DataLink ribbon, select Calculated Data.


◊ For the Root path, choose the cell that has the root path drop-down list, for Data Items choose
the Precipitation cell.
◊ Set the start and end times to the corresponding cells. Set Time interval to 1d, and calculation
mode to Total.
◊ Set the Output cell to where you want it (to the right of the first Avg. Temp. results is ideal, cell
E7 in this example). It should look like:

◊ If desired, repeat this process for the Maximum WindSpeed, Average Humidity, and any other
forecasted weather attributes you want to include.

31 | P a g e
2015 TechCon Session

◊ Finally, cleaning it up some and applying conditional formatting to make visual comparisons
between days easy:

With something like this, it should be fairly easily to pick the best day(s) to send a maintenance crew to
each site.

32 | P a g e
Using Future Data to Predict your Process

7. Create a PI ProcessBook Display to show anticipated production from solar panels


(Time allowing)

For this exercise will have to download the file forecastxml.zip on the website
http://learning.osisoft.com/2015uc.aspx (no login needed) and do the following:

• Unzip the file and drop the XML file in the directory C:\Weather_UC15\SolarAnyWhere_XML.

• Wait for about 1 minute, until the PI UFL Interface processes the file. You should see the name
change to EdwardsAirForceBase_output_<Date and Time>._OK

• In PI System Explorer, navigate to the Analysis tab and open the PV Forecast database

• Navigate to the Analyses tab and select all analyses: California\OSIsoft\San Leandro\24H
Forecasted Power and select “Backfill checked analyses”

• Set the start to “t” and the end to “Explicit End Time”  “*”, then hit the Queue button

• Wait for backfilling to complete and proceed with the exercise

33 | P a g e
2015 TechCon Session

For this exercise, we are going to use the database PV Forecast, which is holding forecast data for solar
panels that your company owns.

The main attribute we are interested in is the Forecasted Power. The latter is calculated using the
Temperature Forecast and the Global Horizontal Irradiance 2(GHI).

You are provided with the following PI ProcessBook display as your work base:
C:\TechCon_Lab\SolarOutput.PDI.

You are asked to integrate the forecasted temperature, GHI and power so that it looks as follows:

Here is a more detailed view of the trends that should be in the PI ProcessBook displays:

2
The total amount of shortwave radiation received from above by a horizontal surface. This value is of particular interest to
photovoltaic installations and includes both Direct Normal Irradiance (DNI) and Diffuse Horizontal Irradiance (DIF)

34 | P a g e
Using Future Data to Predict your Process

Once the PI ProcessBook display is created, you can try answering questions such as:

• What is the forecasted Global Horizontal Irradiance for tomorrow at this time?
• What is the corresponding output power for our solar plant?

35 | P a g e
2015 TechCon Session

Step-by-step instructions

◊ Open the PDI file C:\TechCon_Lab\SolarOutput.PDI


◊ If needed, switch to Build mode by clicking the icon
◊ In the PI ProcessBook toolbar, click on View and make sure the AF Browser and AF Property
windows are enabled.

◊ In the AF Browser window, select the PV Forecast database and navigate to the San Leandro
element located under California\OSIsoft

36 | P a g e
Using Future Data to Predict your Process

◊ In the AF Property window, group the attributes by Category and navigate to the Forecast
category

◊ Drag the GHI Forecast attribute in the PI ProcessBook display.


◊ Double click on the value symbol created and check “Show Units”.

◊ Create a Textbox (Navigate to Draw  Text or click the button.

37 | P a g e
2015 TechCon Session

◊ Type “Forecasted Global Horizontal Irradiance” in the text box.


Note: The size of the text can be adjusted by using from the PI ProcessBook toolbar, or by
dragging the handles around the text. Use Arial, Bold, 20 as your font.

◊ Align the text box and value symbol, then group them.
o Select the Textbox and Value Symbols (either by selecting one after another holding the
Ctrl button, or by holding the left button on the mouse and selecting an area containing
both symbols)
o In the PI ProcessBook Toolbar, navigate to Arrange  Align and choose Center

o With the 2 symbols still selected, navigate to Arrange  Group

o The result should look like this:

38 | P a g e
Using Future Data to Predict your Process

◊ Create a trend going from yesterday until tomorrow (*-24h to *+24h). You do not need to
specify a data item for now.
o Choose Draw  Trend or click the button.
o Enter the following specifications for the trend.
 Name: Forecasted GHI
 Start: *-24h
 End: *+24h
o Change the Tag Search Data Reference for AF2.

o In the Select AF Attribute window that appears, select the PV Forecast database,
navigate to the San Leandro element and choose the GHI Forecast Attribute.

39 | P a g e
2015 TechCon Session

o Here’s what your configuration should look like:

o The resulting trend should be similar to this:

40 | P a g e
Using Future Data to Predict your Process

◊ Perform the same steps as before to create a textbox, value, and trend showing the forecasted
output power and place them near the upper right corner of the display.
◊ Add a value symbol showing the temperature:
o Drag and drop the Temperature Forecast attribute on the display
o Double click the resulting value symbol and make sure to show the units of measure
o Add a text box to label the forecasted temperature
◊ Switch to Run mode by clicking the icon.
◊ Double click on the Forecasted GHI trend, and it will open it in Full Screen.
◊ Insert a Trend cursor marker by clicking the Trend Cursor button . A cursor appears at the
right edge of the trend.
◊ When the mouse pointer changes to a double-headed arrow over the trend cursor, click the
vertical line and drag left to position the trend cursor to 24 hours from now and take note of the
value.
◊ Close the trend by double clicking on it and switch to the Forecasted Power trend. Use the trend
cursors to find the forecasted power corresponding to the value previously noted.

41 | P a g e
2015 TechCon Session

Annex A: List of PI AF substation parameters


The following table lists the substitution parameters that PI AF supports. That list is extracted from the
PI AF User Guide, and can also be found by visiting https://livelibrary.osisoft.com and navigating to “PI
Server 2014 R2 » PI Asset Framework » Designing and implementing PI AF asset models » Associating
data with assets » Configuring data references » Using parameters in data references » List of PI AF
substitution parameters”.

Parameter Name Substitution

%Analysis% Name of analysis, if obtainable from the context.

%Attribute% Name of the attribute that holds this data reference.

%AttributeId% ID of the attribute that holds this data reference.

%Database% Name of the PI AF database in which the attribute resides.

%Description% Description of the attribute that holds this data reference.

Name of the element in which the attribute resides. For event


%Element%
frames, this refers to the name of the primary-referenced element.

Name of the parent element of the element in which the attribute


%..\Element% resides. To retrieve further ancestors, use the ..\ notation, such as
%..\..\Element%.

%\Element% Name of the root element in which the attribute resides.

%ElementDescription% Description of the element in which the attribute resides.

ID of the element in which the attribute resides. For event frames,


%ElementId%
this refers to the ID of the primary referenced element.

%EndTime% Local end time, if obtainable from the time context.

%EventFrame% Name of the event frame in which the attribute resides.

Value of the matching system-environment variable. For example


%<Environment Variable>% %COMPUTERNAME% is replaced with the name of the computer on
which the data reference is executing.

Name of the parent event frame of the event frame in which the
%..\EventFrame% attribute resides. To retrieve further ancestors, use the ..\ notations,
such as %..\..\EventFrame%.

%\EventFrame% Name of the root event frame in which the attribute resides.

%EventFrameId% ID of the event frame in which the attribute resides.

42 | P a g e
Using Future Data to Predict your Process

Parameter Name Substitution

%Model% Name of the model, if obtainable from the context.

Name of the default PI Server for the computer on which you create
the attribute. When creating the attribute in PI System Explorer, this
is the default PI Server for the computer on which PI System Explorer
is running.
%Server%
Note: The %Server% parameter does not resolve to the computer on
which the PI AF database resides. The %Server% parameter can
resolve to a different PI Server depending on the default in PI AF
Client.

Name of the source element for the transfer in which the attribute
%Source%
resides.

%StartTime% Local start time, if obtainable from the time context.

%System% Name of the PI AF server or collective where the attribute resides.

Name of the template on which the element is based. For example, if


%Template% you created element Valve101 from a template called Valve, then
the substitute text would be Valve.

%Time% Local time, if obtainable from the time context.

%Transfer% Name of the transfer in which the attribute resides.

%TransferId% ID of the transfer in which the attribute resides.

Coordinated universal (UTC) end time if it can be obtained from the


%UtcEndTime%
time context.

Coordinated universal (UTC) start time if it can be obtained from the


%UtcStartTime%
time context.

Coordinated universal (UTC) time if it can be obtained from the time


%UtcTime%
context.

43 | P a g e
2015 TechCon Session

Annex B: PI AF Categories
The PI System Explorer allows you to organize objects into categories. Categories are essentially object
groups that you define yourself. Their purpose is to help you find objects more easily. When you search
for an object, you can use the category as a filter to reduce the list of results. Define as many categories
as you like. Objects can belong to multiple categories.

For example, suppose you have a set of elements representing tanks. Half of the tanks are
manufactured by ACME Company, and the other half are manufactured by EMCA Company. To locate
tanks by manufacturer, create an ACME category and an EMCA category.

Each object type has its own categories. You cannot apply categories from one object type to an object
of another type. For example, you cannot apply an element category to a table. PI AF supports the
following category types:

• Analysis
• Attribute
• Element
• Reference Type
• Table

Categories can be created on the fly when creating an instance of the above types. Say, for example, you
are creating an element template holding an attribute template that you want to categorize, you can
create a new category by doing the following:

1. In PI System Explorer, select the Library tab (bottom left pane) and then select that element
template in the tree under Element Templates (upper left pane).

44 | P a g e
Using Future Data to Predict your Process

2. On the right pane, locate the Categories line

3. Click on the Browse button on the right hand side of that line.

4. On the “Categorize” window that appears, click “New Category”.

5. Enter a name for your category, and click OK.

45 | P a g e
2015 TechCon Session

6. Add more categories as needed, and click OK.


7. Check in your changes.
8. Your attribute is now categorized.

Categories can also be created in the PI AF Library before creating your elements instances by using the
procedure below:

1. Open PI System Explorer.


2. Click the Library tab in the bottom left pane.
3. In the Browser, under Categories, right-click on the category object type and choose New
Category from the resulting menu.
4. The Category Properties dialog box appears.
5. Name the category and, optionally, type in a description.
6. Click OK. The category appears in the Viewer.
7. Check in your work.

Alternatively, you can use PI Builder to create multiple categories from an Excel worksheet.

For more information on categories, you can visit https://livelibrary.osisoft.com/LiveLibrary, navigate to


PI Server 2014 R2  PI Asset Framework”, and search for “categories”.

OSIsoft Virtual Learning Environment

46 | P a g e
Using Future Data to Predict your Process

The OSIsoft Virtual Environment provides you with virtual machines where you can complete the
exercises contained in this workbook. After you launch the Virtual Learning Environment, connect to
PISRV1 with the credentials: pischool\student01, student.

The environment contains the following machines:

PISRV1: a windows server that runs the PI System and that contains all the software and configuration
necessary to perform the exercises on this workbook. This is the machine you need to connect to. This
machine cannot be accessed from the outside except by rdp, however, from inside the machine, you can
access Coresight and other applications with the url: http://pisrv1/, (i.e. http://pisrv1/coresight).

PIDC: a domain controller that provides network and authentication functions.

The system will create these machines for you upon request and this process may take between 5 to 10
minutes. During that time you can start reading the workbook to understand what you will be doing in
the machine.

After you launch the virtual learning environment your session will run for up to 8 hours, after which
your session will be deleted. You can save your work by using a cloud storage solution like onedrive or
box. From the virtual learning environment you can access any of these cloud solutions and upload the
files you are interested in saving.

System requirements: the Virtual Learning Environment is composed of virtual machines hosted on
Microsoft Azure that you can access remotely. In order to access these virtual machines you need a
Remote Desktop Protocol (RDP) Client and you will also need to be able to access the domain
cloudapp.net where the machines are hosted. A typical connection string has the form
cloudservicename.cloudapp.net:xxxxx, where the cloud service name is specific to a group of virtual
machines and xxxxx is a port in the range 41952-65535. Therefore users connecting to Azure virtual
machines must be allowed to connect to the domain *.cloudapp.net throughout the port range 41952-
65535. If you cannot connect, check your company firewall policies and ensure that you can connect to
this domain on the required ports.