You are on page 1of 1

4 5 6 7 8 9 10 11 12 13

14 15 16 17 18

5000
aprox.+12,80m

Internal high

2000
+10,00m

Internal free
high
Minimun internal

5000
hight of 2,0m

7
4 5 6 8 9 10 11 12 13 14 15 16 17 18 6500 6500 6500 6500 6500 6500 6500 6500 6500 6500 6500 6500 6500 6500

C SECTION A-A ESC.: 1:150

4031
4000 7000 4000 7000 4000 7000 4000 7000 4000 7000 4000 7000 4000 7000 4000 7000 3500

Ca
4 5 6 7 8 9 10 11 12 13 14
13000

2700
Da

6100

2160
4000

Db
6500

2160
6000
NH3 EXTRACTION LIFTING DEVICE

4320
COLD BLOCK MCC ROOM
7000 4000 7000
SYSTEM FOR ELECTRICAL

10800 to confirm
CABINETS

2160
Ea
127 VCA
6500 6500 6500 6500 6500 6500 6500 6500 6500 6500 6500 TIERRA
FISICA

CCM-15 CCM-16 CCM-07 CCM-08 CCM-09 CCM-10 CCM-11 CCM-12 CCM-13 CCM CCM-14
BAR TORRE BAR BAS BGR-1 BGS-1 BGS BGR BGS-1 BOMBAS BGS-2
TORRE ENFRIAM. SIST. 5°C SIST. 5°C SIST. 0°C SIST. 0°C SIST. 0°C SIST.-4°C SIST. -4°C BGS SIST. -4°C
ENFRIAM. 17/18/19

EXTINTOR
6100
UTILITY MCC ROOM
EVAPORATIVE CONDENSERS LAYOUT - UTILITY ROOF 127 VCA

2160
BATERIA UPS-01
UPS-01 ALTEC

INTERRUP.
LEVEL +10,80m (TO CONFIRM) ESC.: 1:150

TR SC3-01
TD-UPS-01
TABLERO TC-01 CCM-01 CCM-01 01 VDF 02 VDF 03 VDF 04 VDF 05 VDF 06 VDF 07 VDF 08 VDF 09 VDF 10 VDF 11 VDF 12 VDF CCM-02
DE SISTEMA DE COMPRE. COMPRESOR STAND BY COMP. 1 COMP. 2 COMP. 1 COMP. 2 COMP. 3
CCM-17 CCM-18 CCM-18 CCM-03 CCM-04 CCM-05 CCM-06
COMPRE. 4 COMPRE. 5 COMPRE. 1 COMPRE. 2 COMPRE. 3 COMPRE. 4 112.5 KVA
COMPRESOR
SIST 5°C SIST 5°C SIST 0°C SIST 0°C SIST 0°C TORRES EXTRAC EXTRAC COMPRESOR CONDENSA CONDENSA CONDENSA

EATON
TR SC3-01

TF3-01
COMUNIC. REFRIGERACIÓN 1 AL 6 1 AL 6 SIST 0°C SIST 0°C SIST -4°C SIST -4°C SIST -4°C SIST -4°C
ENFRIAM. NH3#2 NH3#1 VACIO EVAPORA. EVAPORA. EVAPORA. 7/8/9/10/11/12
600 HP 500 HP 500 HP 400 HP 400 HP 400 HP 600 HP 600 HP 600 HP 600 HP 600 HP 600 HP

ABB
1/2 3/4 5/6/7

EXTINTOR
127 VCA

4320
6500 6500 6500 6500 6500 6500 6500 6500 6500 6500

2160
LAYOUT UTILITY MCC ROOM - UPSTARS ESC.: 1:150

5332

DETAIL "X" ESC.: 1:75

4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Pipe Rack 02
6000

6500 6500 6500 6500 6500 6500 6500 6500 6500 6500 6500 6500 6500 6500

B1
1000

Deaerated Deaerated Deaerated


TK

Water Tank Water Tank Water Tank


11000

DAW VC Deaerated Water Tank


EVAPORATIVE
3
H

CONDENSERS
CO2 Tanks
N

C1
Deaerated Water Plant
6000

Ice Water Chillers

2000
C2
BASES DE CHILERS 11
9000

03 04 05 07 08 09 10
01 02
12 13

D1
Harvest Yeast coolers

Emergency exit
9000

10800
14 15 16 17 18 19 20 21 22 23 24 25

10800
10560
D2
RACK 03 Utility pipe rack and walkway

Ø4000

33
7800

29 30 31
32 34
26 27 28

E1
37 39
41 42 43 44 45 46
72000

35
11000

UTILITY BUILDING DAW TKS


36
38 40
Emergency exit
DEAERETED WATER PLANT SECTION ESC.: 1:100
F1
11000

Permanent Maximum
Room Description People People
3100 3150 6300
number number
F2 m Cold 1 Air and CO2 team room
L

5000

oo
O

Medium
R

R
re

O OM NT

ER

UTILITY MCC ROOM


6100

5900
TENSION

TENSION

Ai

O VPO
BAJA

BAJA

VP 2 Cold medium team room


TR RO CO
2/

W
TENSION

TENSION

TENSION

TENSION

TENSION
BAJA

BAJA

BAJA

BAJA

BAJA

Room
TO
C

TY

8900
TRANSFORMADOR

TRANSFORMADOR

LL
LI
substation
23/.44 KV

23/.44 KV

1 2
TRANSFORMADOR

TRANSFORMADOR

TRANSFORMADOR

TRANSFORMADOR

TRANSFORMADOR

TI
23/.44 KV

23/.44 KV

23/.44 KV

23/.44 KV

23/.44 KV
Process

3 Control Tower & meeting room


U
SUB-ESTACION 3A

G1
N
SUB-ESTACION 3B

O
SUB-ESTACION 4

SUB-ESTACION 7

SUB-ESTACION 8

C
OUTGOING

OUTGOING
RMU

RMU

INCOMING

INCOMING

INCOMING

INCOMING

INCOMING

3
RMU

RMU

RMU

RMU

RMU
OUTGOING

OUTGOING
RMU

RMU

Tableros equipo
6000

5800
OUTGOING

OUTGOING

OUTGOING

OUTGOING

OUTGOING
RMU

RMU

RMU

RMU

RMU
OUTGOING

OUTGOING

auxiliar
RMU

RMU

OUTGOING

OUTGOING

OUTGOING

OUTGOING

OUTGOING

IMPORTANT!
RMU

RMU

RMU

RMU

RMU

MCC ROOM
INCOMING

INCOMING
RMU

RMU

Iluminación
OUTGOING

OUTGOING

OUTGOING

OUTGOING

OUTGOING
RMU

RMU

RMU

RMU

RMU

G2 Phase 01 (6Mi hl/y) THIS IS A BASIC ENGINEERING DRAWING WITH LAYOUT DEFINITIONS,
TRANSFORMADOR

TRANSFORMADOR
23/.44 KV

23/.44 KV

CTO.
2805
TRANSFORMADOR

TRANSFORMADOR

TRANSFORMADOR

TRANSFORMADOR

TRANSFORMADOR

PIPE ROTES, GEOMETRIES OF THE BUILDING, STAIRS, PLATFORMS,


8900

Sanitario
23/.44 KV

23/.44 KV

23/.44 KV

23/.44 KV

23/.44 KV

LUBRICANTES
5000

Damas PIPE SUPPORTS AND PIPE LEVELS.


6100

TENSION

TENSION
BAJA

BAJA

ALL INFORMATION OF THIS PROJECT MUST BE VERIFIED.


TENSION

TENSION

TENSION

TENSION

TENSION
BAJA

BAJA

BAJA

BAJA

BAJA

Phase 02 (12Mi hl/y)


2905

ALL STRUCTURES, LIKE PLATFORMS, STAIR CASES, PIPE SUPPORTS,


SE-02 Sanitario
Caballeros PIPE FLEXIBILITY, TANK SHELL THICKNESS, TANK SUPPORTING LEGS,
H 9050 Future expansion
PIPE THICKNESS ISOLATION, EQUIPMENT LOADS AND FOUNDATIONS,
ARE RESPONSIBILITY OF THE SUPPLIER OFF THE EQUIPMENTS AND
INSTALLATION.
6500 6500 6500 6500 6500 6500 6500 6500 6500 6500 6500 6500 6500 6500 19500
6100 6000 6100 THE EQUIPMENTS AND INSTALLATION MUST FOLLOW LOCAL RULES
CONSIDERING WIND AND SEISMIC LOADS. S cholles D esenho i nd. Ltda
Nova Petrópolis - RS - Brazil
SECTION B-B ESC.: 1:100 dfscholles@schollesdesenho.com.br

RACK 01 Utility pipe rack and walkway file:SDI-2021-COL-LAY-003-R3

REVISION REVISION REVISION REVISION REVISION REVISION REFERENCIAS REFERENCIAS BAVARIA - AB InBev
FECHA DE ELABORACION: ARCHIVO:
PLANO No. TITULO PLANO No. TITULO GREENFIELD COLOMBIA
REVISO: REVISO: REVISO: REVISO: REVISO: REVISO:
REVISIONES
BASIC ENGINEERING - LAYOUT AND SECTIONS
FECHA: FECHA: FECHA: FECHA: FECHA: FECHA:
UTILITY BUILDING - CHILLERS -
DESCRIPCION: DESCRIPCION: DESCRIPCION: DESCRIPCION: DESCRIPCION: DESCRIPCION: CO2 PLANT AND AIR COMPRESSOR
SUB-AREA: OPE

PROYECTO: SCHOLLES DIBUJO: SCHOLLES


APROBO: COTAS: ESCALA: 1:200 1:175 FILIAL AREA SUB-AREA ESP. CONSECUTIVO REV

You might also like