DAILY MANPOWER ACCOMPLISHMENT REPORT 04-Aug-21

Wednesday

1.0 PROJECT NAME & LOCATION : LIME HOTEL / LOT 11474-A, Brgy. Corong-Corong El Nido, Palawan WEATHER :
SCOPE OF WORK : Installation of Tiles and Application of Tile Grout SUNNY/FAIR

RAINSHOWER

2.0 FLOOR LEVEL / AREA : 3RD floor


NAME OF LEADMAN : Jesus Bagsic / Jayson Mari HEAVY RAIN/ STORMY

3.0 MANPOWER to be filled up by LEADMAN WORK ACTIVITY

t
ealan

URS
ble S
ut
ile Gro

NHO
TOTAL

ainta
COMPANY / TIME

iles
NOS. NAME OF WORKERS DESIGNATION TIME IN MANHOU SIGNATURE

K MA
SUBCON OUT

n of P
rks

n of T
n of T
RS

ing
o

WOR
ing W

p
catio

catio
llat io

ekee

ing
ng

L
Chipp

Clean

TOTA
Appli

Appli

Hauli

Hous
Insta
1 Bongon, Pol Applicator ABE Cons.

2 Mari, Sonny Applicator ABE Cons. 7am 4pm 8 3 2 2.5 7.5

3 Placido, Serencio Applicator ABE Cons. 7am 4pm 8 3 2 2.5 7.5

4 ABDON, ROMY
5

10

11

12

13

14

15

16

17

18

19

20

21

22

23

4.0 PRODUCTION : To be filled up by Field Engineer


ACCOMPLISHMENTS PROD.
ACTIVITIES FLOOR LEVEL/AREA : REMARKS
QTY UNIT RATE
Chipping Works

Installation of Tiles

Application of Tile Grout 3RD floor 3 ROOM

Application of Paintable Sealant 3RD floor 3 ROOM

Hauling

Housekeeping

Cleaning 3RD floor 3 ROOM

SUB-TOTAL :

REMARKS :

PREPARED BY : CHECKED/NOTED BY : APPROVED BY :

Jayson Mari Engr. Karen Ytac Pampanga Engr. Nathaniel Dwight Untalan
Foreman / Site Engr. Cost Control Engineer PROJECT MANAGER