Professional Documents
Culture Documents
Boq Kosongan Pw. 3.3
Boq Kosongan Pw. 3.3
TOTAL
NO LINGKUP PEKERJAAN BIAYA
( Rp. )
-
II BIAYA LANGSUNG NON PERSONIL
A Biaya Fasilitas Kantor (At Cost) -
B Biaya Perjalanan Dinas & Uang Harian (Fixed Unit Rates) -
C Biaya Akomodasi & Transportasi (At Cost) -
D Biaya Penerapan SMKK (At Cost) -
E Biaya Laporan (At Cost) -
-
TOTAL I + II - -
PPN 10 % - -
TOTAL - -
Terbilang :
I BIAYA LANGSUNG PERSONIL
JUMLAH VOLUME TOTAL BILLING TOTAL
NO. PERSONIL/POSISI PERSONIL 2022 MM/ RATE BIAYA
( Orang ) MM/OB OB ( Rp. ) ( Rp. )
A TENAGA AHLI
1 Supervision Engineer 1 11.00 11.00 - -
2 HSE Engineer 1 4.00 4.00 - -
Field Team 1
Preservasi Jalan Surabaya - Waru
1 Quality Engineer 1 7.00 7.00 - -
2 Inspection Engineer 1 8.00 8.00 - -
Field Team 2
Preservasi Jalan Gempol - Pasuruan - Probolinggo dan Penggantian Jbt. Kademangan III
1 Inspection Engineer (Jembatan) 1 8.00 8.00 - -
2 Quality Engineer 1 7.00 7.00 - -
Sub-Total. A 45.00 -
Field Team 2
Preservasi Jalan Gempol - Pasuruan - Probolinggo dan Penggantian Jbt. Kademangan III
1 Inspector 1 11.00 11.00 - -
4 Lab. Technician 1 7.55 7.55 - -
5 Inspector (Jembatan) 1 8.00 8.00 - -
6 Surveyor (Jembatan) 1 8.00 8.00 - -
7 Lab. Technician (Jembatan) 1 7.00 7.00 - -
Sub-Total. B 59.55 -
C STAF PENDUKUNG
Field Team 1
Preservasi Jalan Surabaya - Waru
1 Sekertaris 1 11.00 11.00 - -
2 Operator Computer 1 11.00 11.00 - -
3 Office Boy 1 11.00 11.00 - -
Field Team 2
Preservasi Jalan Gempol - Pasuruan - Probolinggo dan Penggantian Jbt. Kademangan III
1 Sekertaris 1 11.00 11.00 - -
2 Operator Computer 1 11.00 11.00 - -
3 Office Boy 1 11.00 11.00 - -
Sub-Total. C 66.00 -
TOTAL-I, BIAYA LANGSUNG PERSONIL -
II BIAYA LANGSUNG NON PERSONIL
VOLUME HARGA TOTAL
TOTAL
NO. LINGKUP PEKERJAAN JUMLAH SATUAN 2021 SATUAN BIAYA
VOLUME
MM/OB ( Rp. ) ( Rp. )
A BIAYA KANTOR
- Biaya Sewa Alat Ukur 1 LS 1.00 1.00 - -
(Biaya Sewa Alat Theodolite/Total Station
atau sejenisnya, Meteran, Termometer atau
sesuai kebutuhan)
Field Team 1
Preservasi Jalan Surabaya - Waru
1 - Biaya Sewa Kantor : 1 Unit-bulan 11.00 11.00 - -
2 - Biaya Sewa Perabot Kantor 1 LS 1.00 1.00 - -
3 - Biaya Operasional
- Biaya Komputer + Printer (sewa) 2 Unit-bulan 22.00 22.00 - -
- Biaya Alat Tulis Kantor 1 Unit-bulan 11.00 11.00 - -
- Biaya Foto Copy 1 Unit-bulan 11.00 11.00 - -
Field Team 2
Preservasi Jalan Gempol - Pasuruan - Probolinggo dan Penggantian Jbt. Kademangan III
1 - Biaya Sewa Kantor : 1 Unit-bulan 11.00 11.00 - -
2 - Biaya Sewa Perabot Kantor 1 LS 1.00 1.00 - -
3 - Biaya Operasional -
- Biaya Komputer + Printer (sewa) 2 Unit-bulan 22.00 22.00 - -
- Biaya Alat Tulis Kantor 1 Unit-bulan 11.00 11.00 - -
- Biaya Foto Copy 1 Unit-bulan 11.00 11.00 - -
Field Team 1
Preservasi Jalan Surabaya - Waru
a. Tenaga Ahli
- Quality Engineer 1 Unit-bulan 7.00 7.00 - -
- Inspection Engineer 1 Unit-bulan 8.00 8.00 - -
b. Asisten Tenaga Ahli
- Inspector 1 Unit-bulan 11.00 11.00 - -
- Lab. Technician 1 Unit-bulan 7.00 7.00 - -
Field Team 2
Preservasi Jalan Gempol - Pasuruan - Probolinggo dan Penggantian Jbt. Kademangan III
a. Tenaga Ahli
- Inspection Engineer (Jembatan) 1 Unit-bulan 8.00 8.00 - -
- Quality Engineer 1 Unit-bulan 7.00 7.00 - -
b. Asisten Tenaga Ahli
- Inspector 1 Unit-bulan 11.00 11.00 - -
- Lab. Technician 1 Unit-bulan 7.55 7.55 - -
- Inspector (Jembatan) 1 Unit-bulan 8.00 8.00 - -
- Surveyor (Jembatan) 1 Unit-bulan 8.00 8.00 - -
- Lab. Technician (Jembatan) 1 Unit-bulan 7.00 7.00 - -
Field Team 1
Preservasi Jalan Surabaya - Waru
Roda 2
a. Tenaga Ahli
- Quality Engineer 1 Unit-bulan 7.00 7.00 - -
- Inspection Engineer 1 Unit-bulan 8.00 8.00 - -
b. Asisten Tenaga Ahli
- Inspector 1 Unit-bulan 11.00 11.00 - -
- Lab. Technician 1 Unit-bulan 7.00 7.00 - -
Field Team 2
Preservasi Jalan Gempol - Pasuruan - Probolinggo dan Penggantian Jbt. Kademangan III
Roda 2
a. Tenaga Ahli
- Inspection Engineer (Jembatan) 1 Unit-bulan 8.00 8.00 - -
- Quality Engineer 1 Unit-bulan 7.00 7.00 - -
b. Asisten Tenaga Ahli
- Inspector 1 Unit-bulan 11.00 11.00 - -
- Lab. Technician 1 Unit-bulan 7.55 7.55 - -
- Inspector (Jembatan) 1 Unit-bulan 8.00 8.00 - -
- Surveyor (Jembatan) 1 Unit-bulan 8.00 8.00 - -
- Lab. Technician (Jembatan) 1 Unit-bulan 7.00 7.00 - -
Field Team 2
Preservasi Jalan Gempol - Pasuruan - Probolinggo dan Penggantian Jbt. Kademangan III
1 - Laporan Pendahuluan 5 buku 2.00 10.00 - -
2 - Laporan Bulanan (Monthly Report) 5 buku 19.00 95.00 - -
3 - Laporan Triwulan (Quarterly Report) 5 buku 5.00 25.00 - -
4 - Laporan Teknis 2 buku 2.00 4.00 - -
5 - Laporan Pengujian Mutu 5 buku 2.00 10.00 - -
6 - Laporan Akhir (Final Report) 5 buku 2.00 10.00 - -
(2 Buah Flash Disk berisi Seluruh Laporan termasuk As Built Drawing dan back up quality)
TOTAL -