Cyclone

Cluster #1

Tertiary Crushing Dirty Water


Primary
Circuit Recycle
Gravity
Primary & Secondary
Mobile Crushing
Circuit

Mine Water

Process Water Storage Transfer


Pump
Primary Mill

River Water

Cyclone
Cluster #2

Roughers
Scavengers
Secondary
Secondary Mill Gravity

Scav. Conc
Pump

Cyclone
Feed Pump Gravity
Cleaner Conc Pump Gold Room

Scav. Conc
Pump Gravity
Machine

Conc Flotation Concentrate


Thickening Filtration

To Floor
Pump To Floor
Pump
Flotation Tails
Pumo

Tailings Storage Facility


Excess Water Storage

Authorised By:
MOB
TRIDENT SOUTHERN EXPLORATIONS SRL
1st Check By: ANDACOLLO PROJECT
3 Revision 20.08.18
OVERALL FLOWSHEET (550 TPD)
2 Revised Gravity Circuit 30.07.18 2nd Check By: DWG No: Rev No
1 Revision – 550TPD Decision 18.06.18 PFD-09 3
0 Preliminary 14.06.18 Drawn By: Sheet: Date: PFD No.:
REV DESCRIPTION DATE 1 of 1 01.05.18
10-BN-01 5-CR-01 5-CR-02 5-SN-01 10-FD-02 10-SN-01
10-BN-00 10-VSI-01 / 10-PU-02 10-PU-01
Plant Feed Bin & GT125 10-CV-00 GT200DF GT205S Hydrated Lime Tertiary Screen
Plant Feed Bin & 10-CR-03 Area Sump Pump Dewatering
Feeder (Gekko) Jaw Crusher Transfer Conveyor Cone Crusher Screen Feeder
Feeder (Fixed) VSI Crusher Cyclone Pump

-300 mm

5-CR-01 5-SN-01

P95 -13 mm

Magnetics

5-CR-02
Run of Mine Stockpiles

Process Water
To Spray Bars
PFD-08
90-PU-01 Crushed Product
p1
Recycle Water
Stockpile
To Feed Box
PFD-02
92-PU-01
-13 mm

r2

1 r1
10-SN-01
10-CV-02 2
+ 40 mm

5-BN-02 10-VSI-01 /
Existing Gekko Bin &
10-CR-03
3
Feeder – To be removed -3 mm
once fixed feeder +3 mm
upgraded 10-CV-01
10-FE-02
4

5-FE-02
Lime Feeder
(if required)
5-BN-01
(Modified) 5-CV-01

5-FE-01 10-PU-01a/b
10-PU-10
To Gravity/Grinding
-3 mm
PFD-02
10-HO-01 To 20-CY-01

Authorised By:
MOB
TRIDENT SOUTHERN EXPLORATIONS SRL
1st Check By: ANDACOLLO PROJECT (550 TPD)
3 Revision 20.08.18
AREA 5 & 10: CRUSHING
2 Revised Gravity Circuit 30.07.18 2nd Check By: DWG No: Rev No
1.2 Revision – 550TPD Decision 2.07.18 PFD-01 3
0 Preliminary 14.06.18 Drawn By: Sheet: Date: PFD No.:
REV DESCRIPTION DATE 1 of 1 01.05.18 1
20-CY-01 20-ML-01 92-TK-01 92-PU-02 92-PU-01 20-IPJ-01 / 20-ISP-01 /
Dewatering 20-PU-01 Gravity 20-GC-02 20-PU-10
Ball Mill (Gekko) Recycle Water Solids Transfer Recycle Water 20-GC-01
Cyclone/s Feed Pump InLine Spinner Sump Pump
Tank Pump Pumps InLine Pressure Jig

Raw Water
PFD-09
90-PU-01

w1

20-IPJ-01

Process Water IPJ Tails


9
PFD-08 p3
90-PU-02 Hutch Water
IPJ Conc

Excess Water
PFD-05 50 10
50-PU-02

20-ISP-01
8
To Secondary Milling
11 12 PFD-03
20-ML-02

5
20-CY-01 P80 45 um
To Conc Hopper
Wet Crushed Feed Baffle ISP Conc
4 13 PFD-03
PFD-02
20-ML-02
10-PU-01

p2 r3

6
Secondary Milling Circuit
92-TK-01 PFD-03
Grinding
Media 20-ML-01
92-PU-01a/b
14
Flotation Circuit
PFD-04
92-PU-02
+10 mm
Scats Bin

Tertiary Crushing Circuit


7
PFD-01
Copper Sulphate
PFD-06
Alternative destination – if required
80-PU-01
Collector
20-HO-01
PFD-06
80-PU-02
Promotor 20-PU-01
PFD-06
80-PU-03

Authorised By:
MOB
TRIDENT SOUTHERN EXPLORATIONS SRL
1st Check By: ANDACOLLO PROJECT
3 Revision 20.08.18
AREA 20: PRIMARY GRINDING & GRAVITY
2 Revised Gravity Circuit 30.07.18 2nd Check By: DWG No: Rev No
1.2 Revision – 550TPD Decision 2.07.18 PFD-02 3
0 Preliminary 14.06.18 Drawn By: Sheet: Date: PFD No.:
REV DESCRIPTION DATE 1 of 1 01.05.18 2
22-ML-01 22-CY-01 22-PU-02 22-PU-03 Gravity
22-PU-01 Gravity 22-GC-01 22-SN-01
Ball Mill (Marcy) Cyclone Cyclone Feed Conc Transfer
Feed Pump Knelson B.C.C. Gravity Prep
Raw Water
Pumps Pump
PFD-08
90-PU-01
Process Water
PFD-08
w2
90-PU-02
Recycle Water p5
PFD-02
To Flotation
92-PU-01 Cyclone Overflow
18 PFD-04
Gravity Feed >> 40-FC-01
19
22-CY-01/04
Cyclone Feed
16

+1mm Scats
20

r4 r5
r6
22-SN-01
Cyclone Underflow
21

22-GC-01
17
Gravity Tails
22

ISP Conc
ISP Concentrate
PFD-02 13
20-GC-102
23
IPJ/ISP Tails
PFD-02
20-GC-101/102 p4

To Gold Room
24 PFD-06
22-ML-01 70-TK-01
Grinding 20-HO-02
Media 20-PU-02

12

15 +10 mm
Scats Bin

Primary Milled Gravity Tails


Copper Sulphate
PFD-06
80-PU-01 22-PU-01a/b
Collector
22-HO-01
PFD-06
80-PU-02
Promotor
PFD-06
80-PU-03

Authorised By:
MOB
TRIDENT SOUTHERN EXPLORATIONS SRL
1st Check By: ANDACOLLO PROJECT (550TPD)
3 Revision 20.08.18
AREA 22: SECONDARY GRINDING & GRAVITY
2 Revised Gravity Circuit 30.07.18 2nd Check By: DWG No: Rev No
1.2 Revision – 550TPD Decision 2.07.18 PFD-03 3
0 Preliminary 14.06.18 Drawn By: Sheet: Date: PFD No.:
REV DESCRIPTION DATE 1 of 1 01.05.18 3
40-PU-10 40-FC-01/02 40-FC-10 to 16 40-FC-03 to 06 40-PU-03 40-PU-01 40-PU-02 90-PU-10a/b 40-PU-04a/b
Sump Pump Flotation Cell Flotation Cell Flotation Cell Final Conc Pump Scav Conc Pump Clnr Tails Pump Gland Water Pumps Tailings Pumps
(DR100 ~ Existing) (DR24 ~ Gekko) (WEMCO ~ Existing/ (Existing) (Existing) (Existing) (New) (New)
Modified)
Recycle Water
PFD-02
52-PU-01
Process Water
PFD-08
90-PU-02 Low Pressure Air

p6 p7
Frother 40-FC-01/02
PFD-07
80-PU-04 40-BL-01 40-FC-03 to 06

Cyclone Overflow
PFD-03 18
20-CY-01 Flotation Tails
42
40

41
Rougher Concentrate
40-HO-01
This pump may
Scavenger Concentrate
40-PU-01 not be required
44 43 in new layout

Note: Gekko tag is


40-FC-10 to 15 40-FC-01-06

44

40-HO-02
Cleaner Concentrate

Cleaner Tails

40-PU-02
Raw Water
PFD-08 w3

45 90-PU-10a
40-HO-04
To Gland Water Seal Flotation Tails
on Tailings Pumps – 47 To T.S.F.
IF REQUIRED
Tailings Storage Facility
40-PU-04a 40-PU-05a
90-PU-10b
40-HO-03

40-PU-10 40-PU-04b 40-PU-05b


Metso VF50
To Thickener via Falcon
Cleaner Concentrate
46 PFD-04
40-PU-03 50-GC-01

Authorised By:
MOB
TRIDENT SOUTHERN EXPLORATIONS SRL
1st Check By: ANDACOLLO PROJECT (550 TPD)
3 Revision 20.08.18
AREA 40: FLOTATION
2 Revised Gravity Circuit 30.07.18 2nd Check By: DWG No: Rev No
1.2 Revision – 550TPD Decision 2.07.18 PFD-04 3
0 Preliminary 14.06.18 Drawn By: Sheet: Date: PFD No.:
REV DESCRIPTION DATE 1 of 1 01.05.18 4
50-GC-01 50-PU-01 50-TK-03 50-PU-03 50-FL-01 50-TK-04 50-PU-04 50-FL-02
50-PU-10 50-TH-01 50-TK-02 50-PU-02
Gravity Scavenger Thickener U/F Filter Feed Filter Feed Concentrate Filter Feed Filter Feed Concentrate
Sump Pump Conc. Thickener Overflow Tank Overflow Pump
Raw Water Pump Tank Pump #1 Filter #1 Tank Pump #2 Filter #2
PFD-08 w4
90-PU-01
Process Water
PFD-08
90-PU-02 50-PU-05
50-TK-05
Flocculant-Conc Filtrate Transfer
PFD-07 Filtrate Tank
Pump
80-PU-05
Flotation Concentrate Bypass
PFD-04 46
40-PU-03

50-GC-01
50-TH-01
51
This is the Falcon
SB250 53

50-PU-02 To Recycle Water Tank


Thickener Overflow
56 PFD-02
50
92-TK-01

50-TK-02 To Process Water Tank


50-PU-01 PFD-08
90-TK-05

Locked Box
52 50-FL-02

To Gold Room By Hand


PFD-07 50-TK-04

55

50-PU-04

50-FL-01

Filtrate
50-TK-03
Filter Feed

50-PU-03
54
50-TK-05
50-PU-05
50-PU-10
Concentrate
Cake

To Drying & Bagging Shed

Authorised By:
MOB
TRIDENT SOUTHERN EXPLORATIONS SRL
1st Check By: ANDACOLLO PROJECT (550 TPD)
3 Revision 20.08.18
AREA 50: CONCENTRATE FILTRATION
2 Revised Gravity Circuit 30.07.18 2nd Check By: DWG No: Rev No
1.2 Revision – 550TPD Decision 2.07.18 PFD-05 3
0 Preliminary 14.06.18 Drawn By: Sheet: Date: PFD No.:
REV DESCRIPTION DATE 1 of 1 01.05.18 5
70-TK-01/02 70-WTB-03 70-ML-01
Wilfley Table Gemini Table Regrind Mill

Raw Water
PFD-07 w4
90-PU-01

70-ML-01
Gravity Conc
PFD-03 24
22-PU-03
70-TK-01
(Modified)

Circular Screen
(existing) Security Safe
(New)
Excess to floor
outside gold room

Gravity Conc
PFD-05 70-WTB-01
50-GC-01
By Hand

70-WTB-03

70-WTB-02 Fume Hood


(New)
Fume Hood
(Existing)

Gas Furnace
(new)

Roasting/
Balance (new)
Calcining Area

Gas Supply
. Drying Oven Slurry Filter
(New) (New)

Wet Area Sump


Pump (existing) To Mill Discharge
PFD-02
20-HO-01

70-PU-01

Authorised By:
MOB
TRIDENT SOUTHERN EXPLORATIONS SRL
1st Check By: ANDACOLLO PROJECT
3 Revision 20.08.18
AREA 70: GOLD ROOM
2 Revised Gravity Circuit 30.07.18 2nd Check By: DWG No: Rev No
10 Revision – 550TPD Decision 18.06.18 PFD-06 3
0 Preliminary 14.06.18 Drawn By: Sheet: Date: PFD No.:
REV DESCRIPTION DATE 1 of 1 01.05.18 6
80-TK-02 80-PU-02/03 80-TK-03 80-PU-04/05
80-TK-05 80-PU-08 Collector Tank Collector Dosing 80-TK-01 80-PU-01 80-TK-04 80-PU-06/07
Promotor Tank Promotor Dosing
Floc Tank Floc Pump Conc Pumps Cu2SO4 Tank Cu2SO4 Pump Frother Tank Frother Pump
Pumps
Raw Water
PFD-07
90-PU-01

Copper Sulphate
Dosing System

PFD-03
Cyclone Overflow
80-TK-01
80-PU-01

Collector Dosing
Systems

80-TK-02
(new) PFD-03
Cyclone Overflow
80-PU-02
(new)

80-PU-03
(new)
Promotor Dosing
Systems

PFD-03
80-TK-03 Cyclone Overflow

80-PU-04

80-PU-05
Frother Dosing
Systems

Flocculant Dosing 80-TK-04 PFD-04


Systems Flotation Cells
80-PU-06

80-PU-07

To Conc Thickener
PFD-05
80-TK-05
50-TH-01

80-PU-08

80-PU-10

Authorised By:
MOB
TRIDENT SOUTHERN EXPLORATIONS SRL
1st Check By: ANDACOLLO PROJECT
3 Revision 20.08.18
AREA 80: REAGENTS
2 Revised Gravity Circuit 30.07.18 2nd Check By: DWG No: Rev No
1 Revision – 550TPD Decision 18.06.18 PFD-07 3
0 Preliminary 14.06.18 Drawn By: Sheet: Date: PFD No.:
REV DESCRIPTION DATE 1 of 1 01.05.18 7
90-TK-03/04 90-TK-01/02 90-PU-01 90-COM-01 90-PU-02
90-TK-05 80-TK-06 80-PU-06
River Water Tanks Mine Water Tanks River Water Air Compressor/Drier Process Water
Process Water Tank Lime Prep Tank Lime Dosing Pump
( Old Plant) ( Old Plant) Pump Pump

Lime Dosing
System

Tailings Dam Reclaim


T.S.F. Reclaim Water
PFD-09 80-TK-06

80-PU-06

Lime Addition
Mine Dewatering
.
By Gravity

Mine Water
Tanks
90-TK-05
(Existing)
90-TK-01 90-TK-02 Intermittent
(Existing) (Existing)

River Water Pump


Process
?
Water Tank
?
Process Water to Plant Process Water Network
PFDs

90-PU-02

Raw Water
Tanks Falcon, ISP
River Water to Plant
PFDs
90-PU-01
90-TK-03 90-TK-04
(Existing) (Existing)

Air Compressor and Drier

90-COM-02

Instrument / Process Air


New River Water Air Compressor and Drier PFDs
Tank Required

90-COM-01

Authorised By:
MOB
TRIDENT SOUTHERN EXPLORATIONS SRL
1st Check By: ANDACOLLO PROJECT
3 Revision 20.08.18
AREA 90: UTILITIES
2 Revised Gravity Circuit 30.07.18 2nd Check By: DWG No: Rev No
1 Revision – 550TPD Decision 18.06.18 PFD-08 3
0 Final 14.06.18 Drawn By: Sheet: Date: PFD No.:
REV DESCRIPTION DATE 1 of 1 01.05.18 8
55-CY-01/02/03 55-PU-01 55-PU-01
Tails Deposition TSF Water Transfer Excess Water Transfer
Cyclones Pump Pump

Process Water Flushing Lines


PFD-09

Flotation Tails
PFD-04 47
40-PU-01/02
Overflow lines

55-PU-01
(New)

55-CY-01/02/03
(New)

Tailings Storage Facility

55-PU-02
(New)

To P.W. Tank
PFD-07

Excess Water Storage To Evaporation


Circuit

Authorised By:
MOB
TRIDENT SOUTHERN EXPLORATIONS SRL
1st Check By: ANDACOLLO PROJECT
3 Revision 20.08.18
AREA 55: TAILINGS STORAGE FACILITY
2 Revised Gravity Circuit 30.07.18 2nd Check By: DWG No: Rev No
1 Revision – 550TPD Decision 18.06.18 PFD-09 3
0 Preliminary 14.06.18 Drawn By: Sheet: Date: PFD No.:
REV DESCRIPTION DATE 1 of 1 01.05.18 9
PFD-01 Crushing
Stream Number 1 2 p1 r2 3 4
Stream Name Screen Screen Feed Screen U/S
Ore Feed Screen Feed VSI Feed
Spray Water Water Gravity Feed

Solids t/h 25.0 87.5 62.5 25.0


m3/h 8.6 30.2 21.6 8.6
Solution t/h 1.0 1.0 34.3 23.0 0.0 58.3
3
m /h 1.0 1.0 34.3 23.0 0.0 58.3
Slurry t/h 26.0 94.0 34.3 23.0 67.9 83.3
% solids 96.0 93.1 92.0 30.0
m3/h 9.66 31.21 34.3 23.0 21.6 67.0
t/m3 2.70 3.01 1.00 1.00 3.15 1.24
Specific Gravity
Ore t/m3 2.90 2.90 2.90 2.90
Water t/m3 1.00 1.00 1.00 1.00 1.00 1.00

PFD-02 Primary Milling & Coarse Gravity


Stream Number 4 5 6 7 p2 14 8 r3 9 10 w1 w1 13 11
Stream Name Dewatering Cone
Cyclone Cyclone Mill Tromeel Gravity Feed ISP Spray ISP Dump Recycle
Cyclone Underflow Hutch Water IPJ Tails IPJ Conc ISP Conc ISP Tails
Underflow Overflow Discharge Spray Water Pump Water Water Water
Feed Discharge
Solids t/h 25.0 23.5 1.5 23.5 1.5 25.0 23.1 1.9 0.030 1.85
3
m /h 8.6 8.11 0.5 8.1 0.51 8.6 8.0 0.6 0.010 0.6
Solution t/h 58.3 10.1 48.3 10.1 8.4 18.5 12.5 23.1 7.9 0.6 0.17 0.17 8.5 27.4
3
m /h 58.3 10.1 48.3 10.1 8.4 18.5 12.5 23.1 7.9 0.6 0.17 0.17 8.5 27.4
Slurry t/h 83.3 33.6 49.7 33.6 9.9 43.5 12.5 46.3 9.7 0.6 0.17 0.2 9.1 27.4
% solids 30.0 70.0 3.0 70.0 15.0 57.5 50.0 19.3 15.0 20.3
3
m /h 67.0 18.2 48.8 18.2 8.9 27.1 12.5 31.1 8.5 0.6 0.17 0.18 9.1 27.4
3
t/m 1.24 1.85 1.02 1.85 1.11 1.60 1.00 1.49 1.14 1.11 1.00 1.00
Specific Gravity
3
Ore t/m 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90 2.90
3
Water t/m 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Authorised By:
MOB
TRIDENT SOUTHERN EXPLORATIONS SRL
1st Check By: ANDACOLLO PROJECT
3 Revision 20.08.18
MASS BALANCE
2 Revised Gravity Circuit 30.07.18 2nd Check By: DWG No: Rev No
MASS BALANCE PFD-01 & 02 3
0 Final 13.07.18 Drawn By: Sheet: Date: PFD No.:
REV DESCRIPTION DATE 1 of 1 01.05.18
PFD-03 Secondary Milling & Fine Gravity

Stream Number 12 15 p4 16 17 18 19 p5 w2 22 23 r6 24
Stream Name Primary Mill
Gravity Knelson Conc Pump
Discharge / Mill Trommel Cyclone Cyclone Cyclone Knelson Knelson Knelson Conc Hopper
Screen Fluidisation to Gold
Coarse Discharge Water Feed U/Flow O/Flow Feed Tails Conc water
Water Water Room
Gravity Tails

Solids t/h 25.0 62.4 127.4 62.4 24.9 40.0 40.0 0.04 0.0
m3/h 9.1 22.7 46.3 22.7 9.1 14.55 14.5 0.01 0.0
Solution t/h 34.6 24.3 6.0 133.7 24.3 67.4 42.0 12.0 15.0 68.9 0.1 6.5 6.6
m3/h 34.6 24.3 6.0 133.7 24.3 67.4 42.0 12.0 15.0 68.9 0.1 6.5 6.6
Slurry t/h 59.6 86.7 6.0 261.1 86.7 92.4 82.0 12.0 15.0 108.8 0.2 6.5 6.7
% solids 41.9 72.0 48.8 72.0 27.0 48.8 36.7 20.0 0.5
m3/h 43.7 47.0 6.0 180.0 47.0 76.5 56.5 12.0 15.0 83.4 0.2 6.5 6.7
t/m3 1.36 1.85 1.00 1.45 1.85 1.21 1.45 1.00 1.00 1.30 1.15 1.00 1.00
Specific Gravity
Ore t/m3 2.75 2.75 2.75 2.75 2.75 2.75 2.75 2.75 3.00
Water t/m3 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

PFD-04 Flotation - Rougher/Scavenger/Cleaner


Stream Number 18 40 41 42 43 p6 44 45 p7 w3 42
Rghr/Scav
Combined Clnr Froth Flotation
Cyclone Flotation Froth Cleaner Cleaner Gland Water
Stream Description Rougher Scav Feed Rghr Conc Scav Conc Cleaner Tails Dilution Tails per
Overflow Tails Dilution Feed Conc. Tails Pumps
Feed Water Hour
Water
Solids t/h 24.9 26.4 25.6 0.9 23.9 1.6 2.5 1.5 1.0 23.9
m3/h 9.1 9.6 9.3 0.32 8.7 0.59 0.9 0.5 0.36 8.7
Solution t/h 67.4 86.0 81.0 4.9 66.4 14.6 3.0 22.5 18.5 4.0 3.0 3.0 69.4
m3/h 67.4 86.0 81.0 4.9 66.4 14.6 3.0 22.5 18.5 4.0 3.0 3.0 69.4
Slurry t/h 92.4 112.4 106.6 5.8 90.4 16.2 3.0 25.0 20.0 5.0 3.0 3.0 93.4
% solids 27.0 23.5 24.0 15.0 26.5 10.0 10.0 7.5 20.0 25.6
m3/h 76.5 95.6 90.3 5.3 75.2 15.2 3.0 23.4 19.1 4.4 3.0 3.0 78.2
t/m3 1.21 1.18 1.18 1.11 1.20 1.07 1.00 1.07 1.05 1.15 1.00 1.00 1.19
Specific Gravity
Solids t/m3 2.75 2.75 2.75 2.75 2.75 2.75 2.75 2.75 2.75 2.75
Solution t/m3 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Authorised By:
MOB
TRIDENT SOUTHERN EXPLORATIONS SRL
1st Check By: ANDACOLLO PROJECT
3 Revision 20.08.18
MASS BALANCE
2 Revised Gravity Circuit 30.07.18 2nd Check By: DWG No: Rev No
MASS BALANCE PFD-03 & 04 3
0 Final 13.07.18 Drawn By: Sheet: Date: PFD No.:
REV DESCRIPTION DATE 1 of 1 01.05.18
PFD-05 Flotation Concentrate Dewatering
Stream Number 46 w4 51 50 52 53 54 55 56
Conc Falcon
Falcon Falcon Thickener Thickener Total Return
Stream Description Thickener Fluidisation
Tails Conc U/F O/F
Filter Cake Filtrate
Water
Feed Water
Solids t/h 1.0 0.99 0.006 0.99 1.0
m3/h 0.4 0.36 0.00 0.32 0.32
Solution t/h 7.0 2.7 9.6 0.1 1.0 8.6 0.2 0.7 18.16
m3/h 7.0 2.7 9.6 0.1 1.0 8.6 0.2 0.7 18.2
Slurry t/h 8.0 2.7 6.9 0.1 2.0 8.6 1.2 0.7 18.2
% solids 12.5 14.3 6.0 50.0 80.0
m3/h 7.4 2.7 10.0 0.096 1.31 8.6 0.6 0.7 18.2
t/m3 1.09 1.00 0.70 1.04 1.51 1.00 2.18 1.00 1.00
Specific Gravity
Solids t/m3 2.75 2.75 2.75 3.10 3.10
Solution t/m3 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PFD-06 Gold Room
Stream Number 24 w4
Excess
Conc to Tabling Water to
Stream Description Gold Room Water Conc Thick
O/F Tank
Solids t/h 0.1
m3/h 0.0
Solution t/h 6.8 2.0 8.8
m3/h 6.8 2.0 8.8
Slurry t/h 6.9 2.0 8.8
% solids 1.0
m3/h 6.8 2.0 8.8
t/m3 1.01 1.00 1.00
Specific Gravity
Solids t/m3 2.90
Solution t/m3 1.00 1.00 1.00

Authorised By:
MOB
TRIDENT SOUTHERN EXPLORATIONS SRL
1st Check By: ANDACOLLO PROJECT
3 Revision 20.08.18
MASS BALANCE
2 Revised Gravity Circuit 30.07.18 2nd Check By: DWG No: Rev No
MASS BALANCE PFD-03 & 04 3
0 Final 13.07.18 Drawn By: Sheet: Date: PFD No.:
REV DESCRIPTION DATE 1 of 1 01.05.18

You might also like