Professional Documents
Culture Documents
Cluster #1
Mine Water
River Water
Cyclone
Cluster #2
Roughers
Scavengers
Secondary
Secondary Mill Gravity
Scav. Conc
Pump
Cyclone
Feed Pump Gravity
Cleaner Conc Pump Gold Room
Scav. Conc
Pump Gravity
Machine
To Floor
Pump To Floor
Pump
Flotation Tails
Pumo
Authorised By:
MOB
TRIDENT SOUTHERN EXPLORATIONS SRL
1st Check By: ANDACOLLO PROJECT
3 Revision 20.08.18
OVERALL FLOWSHEET (550 TPD)
2 Revised Gravity Circuit 30.07.18 2nd Check By: DWG No: Rev No
1 Revision – 550TPD Decision 18.06.18 PFD-09 3
0 Preliminary 14.06.18 Drawn By: Sheet: Date: PFD No.:
REV DESCRIPTION DATE 1 of 1 01.05.18
10-BN-01 5-CR-01 5-CR-02 5-SN-01 10-FD-02 10-SN-01
10-BN-00 10-VSI-01 / 10-PU-02 10-PU-01
Plant Feed Bin & GT125 10-CV-00 GT200DF GT205S Hydrated Lime Tertiary Screen
Plant Feed Bin & 10-CR-03 Area Sump Pump Dewatering
Feeder (Gekko) Jaw Crusher Transfer Conveyor Cone Crusher Screen Feeder
Feeder (Fixed) VSI Crusher Cyclone Pump
-300 mm
5-CR-01 5-SN-01
P95 -13 mm
Magnetics
5-CR-02
Run of Mine Stockpiles
Process Water
To Spray Bars
PFD-08
90-PU-01 Crushed Product
p1
Recycle Water
Stockpile
To Feed Box
PFD-02
92-PU-01
-13 mm
r2
1 r1
10-SN-01
10-CV-02 2
+ 40 mm
5-BN-02 10-VSI-01 /
Existing Gekko Bin &
10-CR-03
3
Feeder – To be removed -3 mm
once fixed feeder +3 mm
upgraded 10-CV-01
10-FE-02
4
5-FE-02
Lime Feeder
(if required)
5-BN-01
(Modified) 5-CV-01
5-FE-01 10-PU-01a/b
10-PU-10
To Gravity/Grinding
-3 mm
PFD-02
10-HO-01 To 20-CY-01
Authorised By:
MOB
TRIDENT SOUTHERN EXPLORATIONS SRL
1st Check By: ANDACOLLO PROJECT (550 TPD)
3 Revision 20.08.18
AREA 5 & 10: CRUSHING
2 Revised Gravity Circuit 30.07.18 2nd Check By: DWG No: Rev No
1.2 Revision – 550TPD Decision 2.07.18 PFD-01 3
0 Preliminary 14.06.18 Drawn By: Sheet: Date: PFD No.:
REV DESCRIPTION DATE 1 of 1 01.05.18 1
20-CY-01 20-ML-01 92-TK-01 92-PU-02 92-PU-01 20-IPJ-01 / 20-ISP-01 /
Dewatering 20-PU-01 Gravity 20-GC-02 20-PU-10
Ball Mill (Gekko) Recycle Water Solids Transfer Recycle Water 20-GC-01
Cyclone/s Feed Pump InLine Spinner Sump Pump
Tank Pump Pumps InLine Pressure Jig
Raw Water
PFD-09
90-PU-01
w1
20-IPJ-01
Excess Water
PFD-05 50 10
50-PU-02
20-ISP-01
8
To Secondary Milling
11 12 PFD-03
20-ML-02
5
20-CY-01 P80 45 um
To Conc Hopper
Wet Crushed Feed Baffle ISP Conc
4 13 PFD-03
PFD-02
20-ML-02
10-PU-01
p2 r3
6
Secondary Milling Circuit
92-TK-01 PFD-03
Grinding
Media 20-ML-01
92-PU-01a/b
14
Flotation Circuit
PFD-04
92-PU-02
+10 mm
Scats Bin
Authorised By:
MOB
TRIDENT SOUTHERN EXPLORATIONS SRL
1st Check By: ANDACOLLO PROJECT
3 Revision 20.08.18
AREA 20: PRIMARY GRINDING & GRAVITY
2 Revised Gravity Circuit 30.07.18 2nd Check By: DWG No: Rev No
1.2 Revision – 550TPD Decision 2.07.18 PFD-02 3
0 Preliminary 14.06.18 Drawn By: Sheet: Date: PFD No.:
REV DESCRIPTION DATE 1 of 1 01.05.18 2
22-ML-01 22-CY-01 22-PU-02 22-PU-03 Gravity
22-PU-01 Gravity 22-GC-01 22-SN-01
Ball Mill (Marcy) Cyclone Cyclone Feed Conc Transfer
Feed Pump Knelson B.C.C. Gravity Prep
Raw Water
Pumps Pump
PFD-08
90-PU-01
Process Water
PFD-08
w2
90-PU-02
Recycle Water p5
PFD-02
To Flotation
92-PU-01 Cyclone Overflow
18 PFD-04
Gravity Feed >> 40-FC-01
19
22-CY-01/04
Cyclone Feed
16
+1mm Scats
20
r4 r5
r6
22-SN-01
Cyclone Underflow
21
22-GC-01
17
Gravity Tails
22
ISP Conc
ISP Concentrate
PFD-02 13
20-GC-102
23
IPJ/ISP Tails
PFD-02
20-GC-101/102 p4
To Gold Room
24 PFD-06
22-ML-01 70-TK-01
Grinding 20-HO-02
Media 20-PU-02
12
15 +10 mm
Scats Bin
Authorised By:
MOB
TRIDENT SOUTHERN EXPLORATIONS SRL
1st Check By: ANDACOLLO PROJECT (550TPD)
3 Revision 20.08.18
AREA 22: SECONDARY GRINDING & GRAVITY
2 Revised Gravity Circuit 30.07.18 2nd Check By: DWG No: Rev No
1.2 Revision – 550TPD Decision 2.07.18 PFD-03 3
0 Preliminary 14.06.18 Drawn By: Sheet: Date: PFD No.:
REV DESCRIPTION DATE 1 of 1 01.05.18 3
40-PU-10 40-FC-01/02 40-FC-10 to 16 40-FC-03 to 06 40-PU-03 40-PU-01 40-PU-02 90-PU-10a/b 40-PU-04a/b
Sump Pump Flotation Cell Flotation Cell Flotation Cell Final Conc Pump Scav Conc Pump Clnr Tails Pump Gland Water Pumps Tailings Pumps
(DR100 ~ Existing) (DR24 ~ Gekko) (WEMCO ~ Existing/ (Existing) (Existing) (Existing) (New) (New)
Modified)
Recycle Water
PFD-02
52-PU-01
Process Water
PFD-08
90-PU-02 Low Pressure Air
p6 p7
Frother 40-FC-01/02
PFD-07
80-PU-04 40-BL-01 40-FC-03 to 06
Cyclone Overflow
PFD-03 18
20-CY-01 Flotation Tails
42
40
41
Rougher Concentrate
40-HO-01
This pump may
Scavenger Concentrate
40-PU-01 not be required
44 43 in new layout
44
40-HO-02
Cleaner Concentrate
Cleaner Tails
40-PU-02
Raw Water
PFD-08 w3
45 90-PU-10a
40-HO-04
To Gland Water Seal Flotation Tails
on Tailings Pumps – 47 To T.S.F.
IF REQUIRED
Tailings Storage Facility
40-PU-04a 40-PU-05a
90-PU-10b
40-HO-03
Authorised By:
MOB
TRIDENT SOUTHERN EXPLORATIONS SRL
1st Check By: ANDACOLLO PROJECT (550 TPD)
3 Revision 20.08.18
AREA 40: FLOTATION
2 Revised Gravity Circuit 30.07.18 2nd Check By: DWG No: Rev No
1.2 Revision – 550TPD Decision 2.07.18 PFD-04 3
0 Preliminary 14.06.18 Drawn By: Sheet: Date: PFD No.:
REV DESCRIPTION DATE 1 of 1 01.05.18 4
50-GC-01 50-PU-01 50-TK-03 50-PU-03 50-FL-01 50-TK-04 50-PU-04 50-FL-02
50-PU-10 50-TH-01 50-TK-02 50-PU-02
Gravity Scavenger Thickener U/F Filter Feed Filter Feed Concentrate Filter Feed Filter Feed Concentrate
Sump Pump Conc. Thickener Overflow Tank Overflow Pump
Raw Water Pump Tank Pump #1 Filter #1 Tank Pump #2 Filter #2
PFD-08 w4
90-PU-01
Process Water
PFD-08
90-PU-02 50-PU-05
50-TK-05
Flocculant-Conc Filtrate Transfer
PFD-07 Filtrate Tank
Pump
80-PU-05
Flotation Concentrate Bypass
PFD-04 46
40-PU-03
50-GC-01
50-TH-01
51
This is the Falcon
SB250 53
Locked Box
52 50-FL-02
55
50-PU-04
50-FL-01
Filtrate
50-TK-03
Filter Feed
50-PU-03
54
50-TK-05
50-PU-05
50-PU-10
Concentrate
Cake
Authorised By:
MOB
TRIDENT SOUTHERN EXPLORATIONS SRL
1st Check By: ANDACOLLO PROJECT (550 TPD)
3 Revision 20.08.18
AREA 50: CONCENTRATE FILTRATION
2 Revised Gravity Circuit 30.07.18 2nd Check By: DWG No: Rev No
1.2 Revision – 550TPD Decision 2.07.18 PFD-05 3
0 Preliminary 14.06.18 Drawn By: Sheet: Date: PFD No.:
REV DESCRIPTION DATE 1 of 1 01.05.18 5
70-TK-01/02 70-WTB-03 70-ML-01
Wilfley Table Gemini Table Regrind Mill
Raw Water
PFD-07 w4
90-PU-01
70-ML-01
Gravity Conc
PFD-03 24
22-PU-03
70-TK-01
(Modified)
Circular Screen
(existing) Security Safe
(New)
Excess to floor
outside gold room
Gravity Conc
PFD-05 70-WTB-01
50-GC-01
By Hand
70-WTB-03
Gas Furnace
(new)
Roasting/
Balance (new)
Calcining Area
Gas Supply
. Drying Oven Slurry Filter
(New) (New)
70-PU-01
Authorised By:
MOB
TRIDENT SOUTHERN EXPLORATIONS SRL
1st Check By: ANDACOLLO PROJECT
3 Revision 20.08.18
AREA 70: GOLD ROOM
2 Revised Gravity Circuit 30.07.18 2nd Check By: DWG No: Rev No
10 Revision – 550TPD Decision 18.06.18 PFD-06 3
0 Preliminary 14.06.18 Drawn By: Sheet: Date: PFD No.:
REV DESCRIPTION DATE 1 of 1 01.05.18 6
80-TK-02 80-PU-02/03 80-TK-03 80-PU-04/05
80-TK-05 80-PU-08 Collector Tank Collector Dosing 80-TK-01 80-PU-01 80-TK-04 80-PU-06/07
Promotor Tank Promotor Dosing
Floc Tank Floc Pump Conc Pumps Cu2SO4 Tank Cu2SO4 Pump Frother Tank Frother Pump
Pumps
Raw Water
PFD-07
90-PU-01
Copper Sulphate
Dosing System
PFD-03
Cyclone Overflow
80-TK-01
80-PU-01
Collector Dosing
Systems
80-TK-02
(new) PFD-03
Cyclone Overflow
80-PU-02
(new)
80-PU-03
(new)
Promotor Dosing
Systems
PFD-03
80-TK-03 Cyclone Overflow
80-PU-04
80-PU-05
Frother Dosing
Systems
80-PU-07
To Conc Thickener
PFD-05
80-TK-05
50-TH-01
80-PU-08
80-PU-10
Authorised By:
MOB
TRIDENT SOUTHERN EXPLORATIONS SRL
1st Check By: ANDACOLLO PROJECT
3 Revision 20.08.18
AREA 80: REAGENTS
2 Revised Gravity Circuit 30.07.18 2nd Check By: DWG No: Rev No
1 Revision – 550TPD Decision 18.06.18 PFD-07 3
0 Preliminary 14.06.18 Drawn By: Sheet: Date: PFD No.:
REV DESCRIPTION DATE 1 of 1 01.05.18 7
90-TK-03/04 90-TK-01/02 90-PU-01 90-COM-01 90-PU-02
90-TK-05 80-TK-06 80-PU-06
River Water Tanks Mine Water Tanks River Water Air Compressor/Drier Process Water
Process Water Tank Lime Prep Tank Lime Dosing Pump
( Old Plant) ( Old Plant) Pump Pump
Lime Dosing
System
80-PU-06
Lime Addition
Mine Dewatering
.
By Gravity
Mine Water
Tanks
90-TK-05
(Existing)
90-TK-01 90-TK-02 Intermittent
(Existing) (Existing)
90-PU-02
Raw Water
Tanks Falcon, ISP
River Water to Plant
PFDs
90-PU-01
90-TK-03 90-TK-04
(Existing) (Existing)
90-COM-02
90-COM-01
Authorised By:
MOB
TRIDENT SOUTHERN EXPLORATIONS SRL
1st Check By: ANDACOLLO PROJECT
3 Revision 20.08.18
AREA 90: UTILITIES
2 Revised Gravity Circuit 30.07.18 2nd Check By: DWG No: Rev No
1 Revision – 550TPD Decision 18.06.18 PFD-08 3
0 Final 14.06.18 Drawn By: Sheet: Date: PFD No.:
REV DESCRIPTION DATE 1 of 1 01.05.18 8
55-CY-01/02/03 55-PU-01 55-PU-01
Tails Deposition TSF Water Transfer Excess Water Transfer
Cyclones Pump Pump
Flotation Tails
PFD-04 47
40-PU-01/02
Overflow lines
55-PU-01
(New)
55-CY-01/02/03
(New)
55-PU-02
(New)
To P.W. Tank
PFD-07
Authorised By:
MOB
TRIDENT SOUTHERN EXPLORATIONS SRL
1st Check By: ANDACOLLO PROJECT
3 Revision 20.08.18
AREA 55: TAILINGS STORAGE FACILITY
2 Revised Gravity Circuit 30.07.18 2nd Check By: DWG No: Rev No
1 Revision – 550TPD Decision 18.06.18 PFD-09 3
0 Preliminary 14.06.18 Drawn By: Sheet: Date: PFD No.:
REV DESCRIPTION DATE 1 of 1 01.05.18 9
PFD-01 Crushing
Stream Number 1 2 p1 r2 3 4
Stream Name Screen Screen Feed Screen U/S
Ore Feed Screen Feed VSI Feed
Spray Water Water Gravity Feed
Authorised By:
MOB
TRIDENT SOUTHERN EXPLORATIONS SRL
1st Check By: ANDACOLLO PROJECT
3 Revision 20.08.18
MASS BALANCE
2 Revised Gravity Circuit 30.07.18 2nd Check By: DWG No: Rev No
MASS BALANCE PFD-01 & 02 3
0 Final 13.07.18 Drawn By: Sheet: Date: PFD No.:
REV DESCRIPTION DATE 1 of 1 01.05.18
PFD-03 Secondary Milling & Fine Gravity
Stream Number 12 15 p4 16 17 18 19 p5 w2 22 23 r6 24
Stream Name Primary Mill
Gravity Knelson Conc Pump
Discharge / Mill Trommel Cyclone Cyclone Cyclone Knelson Knelson Knelson Conc Hopper
Screen Fluidisation to Gold
Coarse Discharge Water Feed U/Flow O/Flow Feed Tails Conc water
Water Water Room
Gravity Tails
Solids t/h 25.0 62.4 127.4 62.4 24.9 40.0 40.0 0.04 0.0
m3/h 9.1 22.7 46.3 22.7 9.1 14.55 14.5 0.01 0.0
Solution t/h 34.6 24.3 6.0 133.7 24.3 67.4 42.0 12.0 15.0 68.9 0.1 6.5 6.6
m3/h 34.6 24.3 6.0 133.7 24.3 67.4 42.0 12.0 15.0 68.9 0.1 6.5 6.6
Slurry t/h 59.6 86.7 6.0 261.1 86.7 92.4 82.0 12.0 15.0 108.8 0.2 6.5 6.7
% solids 41.9 72.0 48.8 72.0 27.0 48.8 36.7 20.0 0.5
m3/h 43.7 47.0 6.0 180.0 47.0 76.5 56.5 12.0 15.0 83.4 0.2 6.5 6.7
t/m3 1.36 1.85 1.00 1.45 1.85 1.21 1.45 1.00 1.00 1.30 1.15 1.00 1.00
Specific Gravity
Ore t/m3 2.75 2.75 2.75 2.75 2.75 2.75 2.75 2.75 3.00
Water t/m3 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Authorised By:
MOB
TRIDENT SOUTHERN EXPLORATIONS SRL
1st Check By: ANDACOLLO PROJECT
3 Revision 20.08.18
MASS BALANCE
2 Revised Gravity Circuit 30.07.18 2nd Check By: DWG No: Rev No
MASS BALANCE PFD-03 & 04 3
0 Final 13.07.18 Drawn By: Sheet: Date: PFD No.:
REV DESCRIPTION DATE 1 of 1 01.05.18