You are on page 1of 1

DRAWING No.

000-FS-T-001 010
MILK OF LIME
000-FS-T-002

000-FS-T-001 002 COPPER REGRIND MILL C2


MOLY ROUGHER CYCLONE CLUSTER
FROM BULK CONCENTRATE
CONDITIONING TANK FLOTATION CELLS (4) CYCLONE (13)
M
M HOLD
C5
M
COPPER CLEANER FEED
M C1 ROTARY DISTRIBUTOR
C3
HOLD

COPPER REGRIND MILL (1)

C4 COPPER CLEANER FLOTATION


COLUMNS (4)

BY VENDOR

C6 M COPPER CONCENTRATE
THICKENER OVERFLOW
C8 PUMPBOX
C7
COPPER CLEANER
SCAVENGER FLOTATION
C10
MOLY ROUGHER COPPER REGRIND MILL C11 COPPER
000-FS-T-001 003
CELLS (4)
CONCENTRATE CYCLONES FEED TO BULK CONCENTRATE THICKENER
CONCENTRATE
PUMPBOX PUMPBOX C9
M THICKENER
245-FS-T-002 004
M
COPPER CLEANER TO FILTER PLANT
SCAVENGER FEED M
M 1st MOLY CLEANER CELLS (4) PUMPBOX M
M
M
M

C13

C12
COPPER REGRIND MILL COPPER CLEANER
S-1 SAG feed CYCLONES FEED SCAVENGER TAILS
S-2 Pebble crusher product PUMPBOX PUMPBOX
S-3 SAG discharge 000-FS-T-001 005
S-4 O/S Trommel 2nd MOLY CLEANER CELLS (3)
S-5 U/S Trommel TO TRANSFER BOX OF PLANT TAILINGS THICKENER
M
S-6 O/S Vibrating screen 000-FS-T-001 006
S-7 U/S Vibrating screen M
TO BULK CONCENTRATE THICKENER
S-8 Pump box of cyclone feeder M
S-9 Cyclone feeder 1st MOLY CLEANER TAILS
MOLY REGRIND MILL
S-10 O/F Cyclones PUMPBOX
CYCLONE CLUSTER
S-11 U/F Ciclones
CYCLONE (5) 3rd MOLY CLEANER 4th MOLY CLEANER
S-12 Ball mill product
COLUMNS CELLS COLUMNS CELLS
B-1 Bulk Rougher concentrate
B-2 Bulk Rougher tailings
B-3 Bulk cleaner feed box
B-4 Bulk cleaner feed
B-5 Bulk cleaner concentrate
B-6 Bulk cleaner tailings
B-7 Cajon de alimento a espesador Bk
B-8 U/F Espesador Bk MOLY REGRIND MILL
B-9 O/F Espesador Bk
C-1 Regrinding hydrocyclone feeder
C-2 O/F regringding cyclone
C-3 U/F regringding cyclone
C-4 discharging of regrinding mill
C-5 Copper cleaner feed
C-6 Copper cleaner concentrate M MOLY CONCENTRATE
C-7 Copper cleaner tailings THICKENER OVERFLOW
C-8 copper concentrate thickener feed PUMPBOX
C-9 U/F concentrate thickener
C-10 O/F concentrate thickener BY VENDOR
C-11 cleaner scavenger feed 000-FS-T-001 007
C-12 cleaner scavenger concentrate TO BULK CONCENTRATE THICKENER
C-13 cleaner scavenger tailings MOLY CONCENTRATE
J-1 Cake of concentrate filter THICKENER
J-2 Filtering water 2nd MOLY CLEANER TAILS 3rd MOLY CLEANER FEED 4th MOLY CLEANER FEED
T-1 feed of final tailing thickners PUMPBOX PUMPBOX PUMPBOX
T-2 U/F final tailing thickners 280-FS-T-002 008
T-3 O/F final tailing thickners
TO STORAGE TANK

MOLY CLEANER-SCAVENGER FEED


PUMPBOX
M MOLY CLEANER
M SCAVENGER FLOTATION CELLS (4)

M
000-FS-T-001 009
M
TO PLANT TAILINGS THICKENER

KNIFE GATE LEGEND:


VALVE
PRIMARY FLOW LIQUID

SECONDARY FLOW LIQUID

CONSUMABLES

INTERMITTENT OR
ALTERNATE FLOW
DRAWING NOT VALID WITHOUT SIGN AND STAMP OF DOCUMENT CONTROL

QUALITY CONTROL

DISCIPLINE MANAGER NAME SIGN

DOCUMENT CONTROL
MOLY CLEANER-SCAVENGER TAILS MOLY REGRIND MILL CYCLONES
THIS DRAWING NOT VALID UNLESS THE LATEST REVISION INITIALS ARE HANDWRITTEN
PUMPBOX FEED PUMPBOX
NAME SIGN & STAMP

SCALE: PROJECT
R E F E R E N C E S R E V I S I O N S R E V I S I O N S SHEET SIZE

DWG. NO. T I T L E NO. D E S C R I P T I O N BY CHECK APPROVED DATE NO. D E S C R I P T I O N BY CHECK APPROVED DATE
A1
TOROMOCHO PROJECT
NOTICE
AREA
THIS IS A COMPUTER GENERATED DRAWING. ALL CHANGES
HERE TO SHALL BE PERFORMED USING CADD ONLY.
DRAWN BY: A.P. DATE: 18/02/09
000 - GENERAL C-560 REVISION

THIS DRAWING IS THE PROPERTY OF AND EMBODIES TITLE CAD NO.


PROPRIETARY INFORMATION BELONGING TO AKER
SOLUTIONS AND MUST BE RETURNED IMMEDIATELY UPON
CHECKED BY: H.A. DATE: 18/02/09 OVERALL
REQUEST. IT MUST NOT BE COPIED IN WHOLE OR IN
PART, NOR THE INFORMATION SHOWN THERE ON DISCLOSED
000-FS-T-002_0.dgn
0 APPROVED FOR CONSTRUCTION A.P. H.A. P.Z. A.F. 19/02/09 TO THIRD PARTIES EXCEPT WITH THE WRITTEN
PERMISSION.
APPROVED BY: P.Z. DATE: 19/02/09 PROCESS FLOW DIAGRAM 0
H ISSUED FOR CLIENT APPROVAL A.P. H.A. P.Z. A.F. 03/02/09

G RE-ISSUED FOR INTERNAL COORDINATION A.P. J.C. P.Z. A.F. 14/11/08


AUTHORIZED BY: A.F. DATE: 18/02/09
MINERA CHINALCO PERU S.A.
SHEET DWG. NO.

000-FS-T-002 OVERALL FLOW DIAGRAM SHEET 2 OF 2 (BASIC ENG.) F ISSUED FOR DESIGN (BASIC ENG.) P.V. P.M. G.R. 19/09/08
MCP APPROVED: DATE:
2 OF 2 000-FS-T-002
User: csc3427 19-02-2009 15:29:15 P:\SCL_04_Eng_Dwg\03_Pro\04_Final\000-FS-T-002_0.dgn