PROJECT REPORT 2

ZESHAN ABDULLAH

16-TE-13

A CASE STUDY INCREASING PRODUCTIVITY OF LOCAL


GARMENT INDUSTRY OF MULTAN BY IMPLIMENTATION OF IE
TOOLS

SUBMITED TO DR TARIQ MAHMOOD


In this examination these various issues were distinguished by utilizing various
compelling creation control instruments like cycle investigation, design of work station,
movement and time study, work normalization and so forth. The empowering results
subsequent to actualizing these apparatuses give the best approach forward and push to reach
toward the end point. Some key advantages of this execution are decrease of overabundance
movement and non-esteem included work by half, diminishing of test dismissal level by 70%,
decrease of work level for fixing works by 80%. As a result complete handling time for definite
yield is diminished. After the usage of these instruments viably the result shows the noteworthy
improvement of the creation than previously. Processes are units of isolated work which
structure a progression of work. Motivations behind cycle examination are given underneath
[1]:
(I) To unmistakably characterize the request for the processes.
(ii) To unmistakably characterize the assembling strategy.
(iii) To make further upgrades in each cycle.
(iv) To give fundamental data on improving the presentation.
(v) To give fundamental data on creation plan.
(vi) To give instructing materials to laborers and sub-contractual worker
During perception of various cycle of printing segment, it is seen that the directions of
work stations are not sufficient. For these explanation overabundance movement and
additional work are required [2] In building up a design for a tasks framework they look for the
ideal assignment of room to the parts of the creation cycle [7]. The requirement for format
arranging emerges both during the time spent structuring new offices furthermore, in
overhauling existing facilities. Layout alludes to the design of offices, work focuses, and
hardware, with specific accentuation on development of work (clients and materials) through
the framework [6]. Subsequent to finishing limit investigation [7] of each floor they propose
another format other than the presence design of workstations for each floor of 5 put away
structure. The outcomes in the wake of executing the proposed design are given beneath:
(I) It limits the exertion of laborers to convey the uncovered pass on for examining work.
(ii) It cures the challenges for laborers of lifting uncovered bite the dust.
(iii) It decreases additional movements and structures straight progression of material by taking
out roundabout stream.
In relieving measure for existing format operators require additional movement for
picking and arranging textures from working table in view of in reverse development [2]. A few
operators are holding up adjacent to the information table during inactive time. Info and yield
box are not proficiently disseminated. More operators required for this process. It is appeared
that a smooth creation stream is accomplished with least interferences subsequent to
executing the proposed format [3] for relieving measure. It likewise causes better working
condition, less handling time and less laborers to achieve the assignment.
In existing format of examination included bigger handling time. Works can't be
disseminated appropriately among workers in light of mistaken design of assessment
framework. Additional workers are required for the review framework. Due to correspondence
hole it causes less adaptability for workers [4]. The motivation behind work configuration is to
distinguish the best methods for accomplishing essential capacity [9].
There are a few issues in customary transportation framework. The Problems are given
underneath [3]:
(I) Need additional occasions to isolate texture from table.
(ii) Need part of hardware to convey the texture.
(iii) Need additional workers
(iv) More holding up time
(v) Not legitimate usage of man, gear and time.
(vi) Material stream isn't smooth
These troubles can be disposed of by utilizing transport framework rather than
conventional transportation framework. Transport framework will build creation rate just as by
and large productivity [8]. Issues associated with conventional conveyance arrangement of
definite yield are[3]:
(I) It needs additional chance to move the texture from bushel.
(ii) It need additional worker to move the texture from bushel and one worker out of gear.
(iii) When a worker tied the pack the nature of the texture might be hampered.
(iv) Face parcel of holding up an ideal opportunity to convey the sewing area.
By presenting lift framework for convey the yield diminish the time required for
transportation and furthermore diminish the number worker expected to achieve the errand.
By the usage of gravity it likewise builds adaptability for worker [5].

REFERENCES
[1] JUKI corporation sewing research institute. Production Control Tools for Garment Industry
1st Edition.
[2] Heizer, J., and Render, B. (2000), Principles of Operations Management 4th Edition. Pearson
College Div. ISBN-10:
0130271470.
[3] L. C. PIGAGE, J. L. TUCKER. “Motion and Time Study, Institute of Labor and Industrial
Relation”, UNIVERSITY
OF ILLINOIS BULLETIN.
[4] Roy, R. N. (2005). Modern Approach to Operations Management. Daryaganj, Delhi, India:
New Age International.
[5] Bheda, R., Narag, A.S. And Singla, M.L. “Apparel Manufacturing a Strategy forProductivity
Improvement, Journal of
Fashion Marketing and Management”, Volume 7.
[6] William J. Stevenson, Operations Management, McGraw-Hill Book Company, 9th Edition.
[7] Kostas N. Dervitsiotis, Operations Management,McGraw-Hill Book
Company,1984International student edition.
[8] A. Spivakovsky and V. Dyachkov, translated from the Russian by Don
Danemanis,CONVEYORS and RELATED
EQUIPMENT.PEACE PUBLISHERS MOSCOW,1966, English, Book, Illustrated edition.
[9] MartandTelsang, Industrial Engineering and Production Management, S. CHAND &
COMPANY LTD, 1stedition , pp.
26-27, 1998.