Professional Documents
Culture Documents
APPENDIX 4
LIST OF MATERIAL SUPPLIED BY SUBCONTRACTOR
These Scope of Material Supply as listed below is not exhaustive. Please refer to the
Appendix 1.2 for the Scope of Works overview and the Appendix 5 – Miscellaneous Material
Report. The Subcontractors shall carry out any add-ons and eliminate where and as required
works scope in compliance with the General Specification and Particular Specification at all
times, which the Subcontractor has read and accepted inclusive but not limited to:-
Page 1 of 1