Unit Price Total Price
No Description unit | Quantity | (Indonesian (Indonesian
Rupiah) Rupiah)
Mobilization - Demobilization is i 35.000.000] 35,000.00]
Field Work
[Core Drilling no. 18
[Core Drilling 0- 20m ™ 360 350.000] 126.000.000)
[Core Drilling 20- 30 m m 180 400.000) 72,000,000)
[SPT O- 20m Test 234 100.000] 3.400.000]
[SPT 20-40 m Test 126 150.000] 18.900.000]
[Open drive sampler (soft to Medium’ no 72 150.000] 0.800.000}
stiff Soil
[Cone penetration Test (equipment Test 2 2.000.009] 4.000.000]
|capacity 2,5 ton)
* |Weekiy record Ground Water Level on is a '9,000.000] 9.000.000]
Borehole for 2 months
[Seismic Downhole Test interval 1,5 m loc 2 110.000.0009] 0.000.000]
to the depth of 30m
3 [Laboratory Test
Water Content Test 2
Unit Weight Test 72
Specific Gravity Test 7 1.300.000] 93.600.000]
[Grainsize Analysis Test 2
[Atterberg Limits Test 2
Swelling test Test 18 250.000] 4.500.000]
[Consolidation Test (Max pres 1600 kPa) Test 36
[CU Triaxial Compression Test Test 18 250.000] 4.500.000]
[UU Triaxial Compression Test Test 36 300.000] 0.800.000]
4 [Reporting
[Geotechnical report is 1
5 [Topogratis Ha 33 000.000] 33,000,000]