You are on page 1of 1
Unit Price Total Price No Description unit | Quantity | (Indonesian (Indonesian Rupiah) Rupiah) Mobilization - Demobilization is i 35.000.000] 35,000.00] Field Work [Core Drilling no. 18 [Core Drilling 0- 20m ™ 360 350.000] 126.000.000) [Core Drilling 20- 30 m m 180 400.000) 72,000,000) [SPT O- 20m Test 234 100.000] 3.400.000] [SPT 20-40 m Test 126 150.000] 18.900.000] [Open drive sampler (soft to Medium’ no 72 150.000] 0.800.000} stiff Soil [Cone penetration Test (equipment Test 2 2.000.009] 4.000.000] |capacity 2,5 ton) * |Weekiy record Ground Water Level on is a '9,000.000] 9.000.000] Borehole for 2 months [Seismic Downhole Test interval 1,5 m loc 2 110.000.0009] 0.000.000] to the depth of 30m 3 [Laboratory Test Water Content Test 2 Unit Weight Test 72 Specific Gravity Test 7 1.300.000] 93.600.000] [Grainsize Analysis Test 2 [Atterberg Limits Test 2 Swelling test Test 18 250.000] 4.500.000] [Consolidation Test (Max pres 1600 kPa) Test 36 [CU Triaxial Compression Test Test 18 250.000] 4.500.000] [UU Triaxial Compression Test Test 36 300.000] 0.800.000] 4 [Reporting [Geotechnical report is 1 5 [Topogratis Ha 33 000.000] 33,000,000] Jambi, 22 November 2021 Dibuat oleh, ASMAWATI, SE. MM.

You might also like