SUMMARY DAILY BD UNIT - DEPT MAINTENANCE

JOB SITE BKL


PERIODE 10-Dec-21

AGING ORDER PART EST UNIT


No. JOB SITE TAG UNIT MODEL UNIT TYPE STATUS HM/KM BD DATE PROBLEM PLAN ACTION ETA PARTS REMAKS
DAY READY
PR DATE PO DATE
SCHEDULE BD
UNSCHEDULE BD
A2B EQUIPMENT
Waiting Parts - Injector Send to Musi 2 for Calibration (6
1 BKL UN AB 036 D7G P3 BD 1.166 20-Nov-21 20 Overheating Engine
Pcs)
2 BKL UN AB 118 PC1250SP-8R P2 BD 44.436 28-Nov-21 12 Hydraulic Pump Leak Progress Inspection by Meckanic
Progress Remove Radiator & Plan Send Musi 2 for
3 BKL UN AB 111 D155A-6 P3 BD 14.812 05-Dec-21 5 Radiator Leak
Repair
4 BKL UN AB 228 PC-300-8 P3 BD 7.452 28-Nov-21 12 Injector Problem Progress Send Injector to Musi 2 for Kalibrasi
5 BKL UN AB 221 PC-400SE-8R P3 BD 9.464 07-Dec-21 3 Oil Cooler Leak Progress Remove Cooler & Plan send Musi 2 for Repair
6 BKL UN AB 226 PC-300-8 P3 BD 8.538 08-Dec-21 2 Injector Problem Progress Send Injector to Musi 2 for Kalibrasi
RIGID DUMP TRUCK EQUIPMENT
Engine Noice
- Supply pump assy swape ke TR 055
- Main harness swape ke TR 055
- Shaft & coupling dumper Wiring Harness Del Musi2
1 BKL UN TR 057 HD465-7R P3 BD 16.591 29-Jun-21 164 OH Engine - Musi 2 Waiting PR
- Charge pump to TR 056 (Repair)
- Bolt bracket transmisi swab ke TR 056
- Pipe Transmisi C/D to TR 056
- Serpo Valve C/D to TR 055
2 BKL UN TR 059 HD465-7R P3 BD 10.943 01-Dec-21 9 Low Power, Tyre No.5 Broken Waiting Part PO 007215 (Tyre) 03-Dec-21 Waiting Supply
DUMP TRUCK EQUIPMENT
Progress Running Engine - Done date 8/12/21
1 BKL UN TR 156 SCANIA P-360 P1 BD 6.601 07-Jul-21 156 Engine jamed (Unit Accident)
Completed Part
Waiting Parts, Cylinder Dump Sent Musi 2 Date
2 BKL UN TR 110 CWE 280 P3 BD 28-Aug-21 104 Cylinder Dump Abnormal 03/10/21 for Repair
Plan Fabrikasi Valve Pump Dump
3 BKL UN TR 131 SCANIA P-360 P2 BD 21-Sep-21 80 Accident (Kaca Depan Pecah) Progress Repair by Team Trinity & Completed Parts 13-Dec-21

Differential Axle Problem, Hub Axle Rear Crack, Oil Leak, Oil Hub Axle Rear Repair di M2 PO 006179 (Fan
4 BKL UN TR 169 SCANIA P-360 P3 BD 18-Oct-21 53 28-Nov-21 Waiting Supply
Colector C/D to UN TR 159 Plan Transmisi & Final Drive for send to site Darmo Radiator)
5 BKL UN TR 170 HINO 500 P3 BD 7.615 28-Oct-21 43 Engine Problem Plan OH Engine di Musi 2
Accident (Kaca Depan Pecah, Kaca Pintu Kanan Pecah, Spion
6 BKL UN TR 155 SCANIA P-360 P2 BD 6.059 03-Nov-21 37 Progress Repair by Team Trinity
Kanan Pecah)
Accident (Kaca Pintu Kiri Pecah, Spion Kiri Pecah, Mounting
7 BKL UN TR 180 SCANIA P-360 P3 BD 9.691 07-Nov-21 33 Waiting Progress Asuransi PO 007286 (Assuransi)
Engine Broken)
8 BKL UN TR 181 SCANIA P-360 P2 BD 7.532 28-Nov-21 12 Differential Problem Progress Check Komponen Differential
9 BKL UN TR 178 HINO 500 P3 BD 3.556 02-Dec-21 8 Engine Problem Plan OH Engine di Musi 2
10 BKL UN TR 174 HINO 500 P1 BD 08-Dec-21 2 Chamber Brake Leak Progress Check by Mechanic
Progress Remove Transmisi, Remove & Replace
11 BKL UN TR 172 HINO 500 P1 BD 08-Dec-21 2 Release Bearing Problem 10-Dec-21
Release Bearing, Install Transmisi
DEWATERING EQUIPMENT
1 BKL UN AB 052 CF.48 H SS P2 BD 01-Dec-21 9 Supply Pump Problem Recommended parts
TOWER LIGHT EQUIPMENT
SUPPORT EQUIPMENT
PO 006767 (Spring RR
15-Nov-21 Part Complete
Injector Problem Waiting Parts Injector, Shock Absorber, Mounting No.1,4 & Clamp Spring)
1 BKL UN 864 TRITON(DC) P3 BD 03-Nov-21 37
Spring No.1,4 & Clamp C/D To LV 863 Engine RH-LH, Insulator T/M, Stopper T/F Mounting
PR 006513 (Injector, etc) 05-Dec-21 Waiting PO
FORD RANGER
2 BKL UN 862 P2 BD 15-Nov-21 25 Engine Can't Running Recommended parts (Injector) PR 006022 (Repair Injector) 17-Nov-21 Waiting PO
AMBULANCE
3 BKL BUS 02 PS125 P2 BD 20-Nov-21 20 Propeller Shaft RR Broken Propeller Shaft Send to Musi 2 for Repair (23/11/21)
PO 007210 (Pompa
4 BKL UN 511 CWB45 P1 BD 30-Nov-21 10 Master Clutch Atas, Shaft Pompa Broken 03-Dec-21 Waiting Supply
Ebara)