S = subjective
O = objective
b. Housekeeping 0.3
c. Proper handling of oxy-acetylene 0.4
d. Accident took place 0.5
2. Speed ( 1 or 10 )
a. Aluminum brazing speed 0.5
b. Piping installation 1
4. Piping installation
a. Accuracy in measurement 1 or 10 0.8
b. Piping deformations an appearance 1 or 10 0.8
c. Uneven distribution of filler metals 1 - 10 0.8
d. Overfilled joints 1 or 10 0.8
e. Correct setting of brazing equipment 1 or 10 0.8
5. Insulation
a. Accuracy in measurements 1 or 10 0.25
b. Insulation for fittings 1 - 10 0.25
c. Waste materials 1 - 10 0.25
d. Proper cladding using polyethylene tape 1 - 10 0.25