CALCULATION SHEET
FLOW RATE OF WATER SUPPLY PUMP & WASTE WATER PUMP
Statistics for Fixtures:
Fixture
No. Des.
WC UR LAV BTH SHR SR TA KS TAPR
Black Water Grey Water Grey Water
I FACTORY -1
I TOILET -1-1
1 Toilet (Male) 80 0 160 80 80 0 80 0 0
2 Toilet (Female) 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
II TOILET -1-2 0 0.00 0 0 0 0 0 0 0
1 Toilet (Male) 5 3 2 0 0 0 0 0 0
2 Toilet (Female) 14 0 5 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
III TOILET -1-3 0 0.00 0 0 0 0 0 0 0
1 Toilet (Male) 5 3 2 0 0 0 0 0 0
2 Toilet (Female) 14 0 5 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
IV TOILET -2-1 0 0.00 0 0 0 0 0 0 0
1 Toilet (Male) 5 3 2 0 0 0 0 0 0
2 Toilet (Female) 14 0 5 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
V OTHERS 0 0.00 0 0 0 0 0 0 0
1 Canteen 0 0 0 0 0 5 0 0 0
2 Kitchen 0 0 0 0 0 0 0 11 0
3 Water for Chiller 0 0 0 0 0 0 0 0 0.464
4 Irrigation 0 0 0 0 0 0 0 0
5 Guard House 2 2 2 0 0 0 0 0 0
VI PROCESS 0 0.00 0 0 0 0 0 0 0
1 Filter Water 0 0 0 0 0 0 0 0 0.7
2 RO Water 0 0 0 0 0 0 0 0 3.14
3 DI Water 0 0 0 0 0 0 0 0 6.46
0 0 0 0 0 0 0 0 0
Water Supply 139 11 183 80 80 5 80 11 0.464
Filter Water 0 0 0 0 0 0 0 0 0.7
RO Water 0 0 0 0 0 0 0 0 3.14
DI Water 0 0 0 0 0 0 0 0 6.46
Loss pressure partial = (10% -20%)* Loss pressure of pipe lengh (TCXD 33-2006, Appendix 14)
Hf2 = 20% * Hf1 = 702.819 m
-Therefore, total pressure loss H2 = Hf1 + Hf2 = 4216.915 m
-Pressure outlet: H3 = 5m
-Necessary pressure: H = (H1 + H2 + H3)*n = 5073 m
Select pressure head: H= 5080 m
B2. TOILET 1-1
Flow rate of waste water inside: (TCVN 4474-1987)
Q= ∑(Qt x n x p/100)
In while:
Q: Total flow of waste water (l/s)
Qt Flow rate of each fixture PLB (l/s)
n: Number of fixture
p: Coeciffient operating
Loss pressure partial = (10% -20%)* Loss pressure of pipe lengh (TCXD 33-2006, Appendix 14)
Hf2 = 20% * Hf1 = 1059.887 m
-Therefore, total pressure loss H2 = Hf1 + Hf2 = 6359.322 m
-Pressure outlet: H3 = 5m
-Necessary pressure: H = (H1 + H2 + H3)*n = 7644 m
Select pressure head: H= 7650 m
B3. TOILET 1-3
Flow rate of waste water inside: (TCVN 4474-1987)
Q= ∑(Qt x n x p/100)
In while:
Q: Total flow of waste water (l/s)
Qt Flow rate of each fixture PLB (l/s)
n: Number of fixture
p: Coeciffient operating
Loss pressure partial = (10% -20%)* Loss pressure of pipe lengh (TCXD 33-2006, Appendix 14)
Hf2 = 20% * Hf1 = 0.999 m
-Therefore, total pressure loss H2 = Hf1 + Hf2 = 5.996 m
-Pressure outlet: H3 = 5m
-Necessary pressure: H = (H1 + H2 + H3)*n = 20 m
Select pressure head: H= 20 m
Loss pressure partial = (10% -20%)* Loss pressure of pipe lengh (TCXD 33-2006, Appendix 14)
Hf2 = 20% * Hf1 = 1.264 m
-Therefore, total pressure loss H2 = Hf1 + Hf2 = 7.586 m
-Pressure outlet: H3 = 5m
-Necessary pressure: H = (H1 + H2 + H3)*n = 22 m
Select pressure head: H= 30 m
Loss pressure partial = (10% -20%)* Loss pressure of pipe lengh (TCXD 33-2006, Appendix 14)
Hf2 = 20% * Hf1 = 1.669 m
-Therefore, total pressure loss H2 = Hf1 + Hf2 = 10.011 m
-Pressure outlet: H3 = 5m
-Necessary pressure: H = (H1 + H2 + H3)*n = 23 m
Select pressure head: H= 30 m
CALCULATION SHEET
PLUMBING WATER DEMAND Công nhân: 107
Prepared by: Date: Văn phòng 60
Checked by: Rev: Tổng 167
Số ca căn t 2
A- STANDARDS REFERENCE
Plumbing Engineering Services Design Guide, 2002.
TCVN 4513-1998: Internal Water Supply– Design Requirements
B-WATER DENABD Water demand Refer. To
Range Choose
Waste Water/Nước
Water demand/ Nhu Cầu Dùng Quantity/Số Water demand/Nhu Cầu Water supply/Nước Cấp Irrigation (Nước
STT Shift per day/(Ca/Ngày) Thải Notes/Ghi Chú 1.2-1.5 (l/m2) 1.5 (l/m2) Table 1-TCVN4513-1988
Nước Lượng (person) Dùng Nước (m3/ngày) tưới )
(m3/day)
Cleaning floor
A Factory F2/ Khu nhà xưởng F2 1.2-1.5 (l/m2) 1.5 (l/m2) Table 3.3-TCVN33-2006
(Nước rửa sàn)
1 Staff office/Nhân viên văn phòng 150 person 60 lít/người/ca 1 shift 9.00 7.20 Following TCVN Hotel (Special Grade250-300 (l/day.person300 l/day.person -- Table 1-TCVN4513-1988
2 Worker/Công nhân 367 person 45 lít/người/ca 3 shift 49.50 39.60 Total 1250 staffs/day Hotel (Special Grade250-300 (l/day.person300 l/day.person -- Table 1-TCVN4513-1988
Following number of seats in
3 Canteen/Nhà Ăn 288 person 18 lít/người/ca 4 shift 20.74 16.59 Hotel (Special Grade250-300 (l/day.person300 l/day.person -- Table 1-TCVN4513-1988
cantten
4 Washing floor/Rửa sàn 18000 m2 0.5. l/m2 1 shift 9.00 7.20 Following TCVN Swimming pool 10% of tank volume 5% (experience estiTable 1-TCVN4513-1988
Irrigation for Landscape/ Tưới
5 1800 m2 3. l/m2 1 shift 5.40 Following TCVN Swimming pool 10% of tank volume 5% (experience estiTable 1-TCVN4513-1988
Cỏ
Storage during time T=2h
Process water supply/Nước cấp Following Goshukosan & Hoya/
6 521 l/min 62.52 50.02 Occupancy (cư ngụ) Refer. To
sản xuất Yêu cầu từ Hoya &
Goshukosan
9 Guard House/ Nhà bảo vệ 2 person 45 lít/người/ca 3 shift 0.27 0.22 Following TCVN Occupancy (cư ngụ) Refer. To
Tổng ` 163.00 77.00
Hệ số dự phòng k=1.1 175.00 93.00
2,477,919,172
1 Water fire/Nước cho chữa cháy 350.00
2 Water demand for Process & Domestec factory-2/Nước cho SX & Sinh hoạt nhà máy 2 151.00
TRÍCH DẪN TÀI LIỆU TÍNH TOÁN THEO TCVN 4513, TCVN4474, QCVN07-2010, QCVN-2000, TCVN-33-2006
Vui lòng kiểm tra kỹ các tiêu chuẫn trước khi tham khảo tính toán
HOYA PROJECT
AMATA-BÌNH DƯƠNG
CALCULATION SHEET
PLUMBING WATER DEMAND Công nhân:
Prepared by: Date:
Checked by: Rev:
A- STANDARDS REFERENCE
Plumbing Engineering Services Design Guide, 2002.
TCVN 4513-1998: Internal Water Supply– Design Requirements
B-WATER DENABD
Waste Water/Nước
Water demand/ Nhu Cầu Dùng Quantity/Số Water demand/Nhu Cầu Water supply/Nước Cấp
STT Shift per day/(Ca/Ngày) Thải Notes/Ghi Chú
Nước Lượng (person) Dùng Nước (m3/ngày)
(m3/day)
1 Staff office/Nhân viên văn phòng 150 person 45 lít/người/ca 1 shift 6.75 5.40
0 l/min 0 m3/day
48 l/day 0.048 m3/day
0.048 m3/day
55.20833