KEY PLAN
NORTH
12 13 14 15 16 17
QIBLA
1 1
INT-L00-1002 INT-L00-1004
1
A INT-000-5013
1 2 3 4
A
CT-SCANNER ROOM X-RAY ROOM
00-RAD-056 00-RAD-019
CH. RM. CH. RM. LOUNGE-
WF-08 STAFF STAFF
WF-09
STORE- STAFF
FLUOROSCOPY ROOM 00-SSS-019 00-SSS-025 00-SSS-032
GENERAL SK-19
00-RAD-021
00-RAD-024
WF-08
WF-09
WF-08
WF-08 WF-08 WF-08 WF-08 SK-19
SK-19
SK-19 SK-05 SK-05 SK-05
WF-39 NOTES:
CONTROL ROOM
TOILET-
TOILET- 00-RAD-023
WP-01/WP-05
00-RAD-022
00-RAD-025 CONTROL ROOM 1 THIS DRAWING IS COPYRIGHT PROTECTED.
LIFT LOBBY-
WF-01 2. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS ARE IN METERS UNLESS NOTED OTHERWISE.
WP-01/WP-05
00-RAD-020 WF-08 WF-08
WF-08 WF-03 WF-03 STAFF/PATIENT
WF-01 SK-05 SK-05 00-VCC-008 3. DO NOT SCALE FROM THIS DRAWING. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. A1 SIZE
SK-04 DRAWING SET IS FULL SIZE.
WP-01/WP-05. WP-01/WP-05 WP-01/WP-05 WP-01/WP-05 WP-01/WP-05 WP-01/WP-05 WP-01/WP-05.
4. ANY DISCREPANCIES BETWEEN ARCHITECTURAL, STRUCTURAL AND SERVICES SHALL BE BROUGHT TO
WP-01/WP-05.
WP-01/WP-05
WF-08 WF-08 WP-01/WP-05. THE ENGINEER'S NOTICE PRIOR TO EXECUTION OF WORK AT SITE.
WP-02
7 WF-08 SK-05 SK-04 5. ALL DIMENSIONS AND LEVELS ARE TO BE CONFIRMED AND ANY DISCREPANCIES OR ERRORS, SHALL BE
7
1 1 WF-08 7 7 CORRIDOR SK-05 1 CORRIDOR WF-08 CORRIDOR REPORTED TO THE ENGINEER PRIOR TO COMMENCEMENT OF WORK.
INT-000-5044 INT-000-5030
SK-04 00-RAD-018 INT-000-5102 00-SSS-010 SK-04 00-EMR-008 6. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT DRAWINGS, TOGETHER
INT-000-5102 INT-000-5102 INT-000-5029 INT-000-5043 WITH THE SPECIFICATIONS AND GENERAL NOTES SHEET.
WP-02 WP-02 WP-02 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PRODUCING A COMPLETE SET OF DETAILED,
WP-01/WP-05 WP-01/WP-05 WP-01/WP-05
WP-01/WP-05
WP-01/WP-05
WP-01/WP-05 WP-01/WP-05 WP-01/WP-05
WP-02 WP-01/WP-05 WP-01/WP-05
WP-01/WP-05
BAY- COORDINATED SHOP DRAWINGS FOR CONSULTANT'S APPROVAL PRIOR TO THE EXECUTION OF WORKS ON
WP-01/WP-05
WP-01/WP-05
WP-01/WP-05
WP-05/WP-05
WP-01/WP-05
WP-05/WP-05
SITE.
B
EM.EQ.
B 00-RAD-026 WF-08 TOILET- SIM 8. ANY COMMUNICATION WITH SPECIALIZED DISCIPLINES REFERENCED IN THE DRAWINGS SHALL BE
WP-01/WP-05
SOILED UTILITY STAFF 7
WP-01/WP-05
WP-05/WP-05 SK-04 VESTIBULE BAY- TRIAGE
00-RAD-032 ULTRASOUND 00-SSS-017 INT-000-5030 00-MEU-040 00-EMR-006 THROUGH THE ENGINEER.
00-RAD-013 BAY-
WF-08 WF-03 1 9. ±0.00 FFL. = 24.6 DMD.
MEDS. ROOM TOILET- MOB.EQ. TOILET- WF-08 10. FOR WALL TYPES REFER : MPH-STD-ARC-000-7800, MPH-STD-ARC-000-7801 & MPH-STD-ARC-000-7802.
SK-05 HSKPG. ROOM
00-RAD-028 00-RAD-014 WF-08 00-RAD-017
00-SSS-011 VISITORS INT-000-5102 SK-03 CONSULTATION ROOM
WF-08 TOILET- CORRIDOR 7
SIM 11. DOORS ARE TO BE PLACED AT AN OFFSET OF 100mm FROM THE INTERNAL FACE OF THE SIDE WALL TO
SK-04 00-MEU-041 00-EMR-007
THE FRAME UNLESS OTHERWISE SPECIFIED.
WP-05/WP-05
SUB WAITING 00-SSS-016 INT-000-5030 WF-06 12. BL01 - BL06 = STAFF/ PATIENT LIFTS.
WF-08
WF-04
(FEMALE) SK-05
WF-03 WF-08 CORRIDOR PL01 - PL06 = PUBLIC LIFTS.
CLEAN UTILITY 00-RAD-016 1 00-EMR-004
SK-06
00-RAD-033 SK-04 BAY- TRIAGE SL01 = STAFF/ SERVICE LIFT.
CORRIDOR INT-000-5102 00-EMR-005
WP-01/WP-05
WF-08 00-RAD-027 TOILET-
WF-09 TOILET- TOILET-
SK-05 ULTRASOUND VIS.-ACC.
WF-08 TOILET-
00-RAD-011
STAFF STAFF
00-RAD-012 SK-04 00-SSS-015 00-SSS-013 00-MEU-039 WF-08
SK-04 ELECTRICAL ROOM
1 CORRIDOR WF-06
WF-03 WF-03 00-SSS-031 SK-03 COUNTER-
WF-08 00-MEU-034
WF-01
WP-05/WP-05
10 PAX 00-EMR-003
1
WP-05/WP-05
WF-04
00-SSS-014 LACTATION ROOM
STAFF
WF-08 INT-000-3036 00-MEU-037 WF-08
00-RAD-035 TOILET-
SK-10 SUB WAITING SIM WF-08 SK-03 VISITORS 1
7
WP-02 WP-02 (MALE) SK-09
WP-01/WP-05
00-MEU-042
ULTRASOUND 00-RAD-015 INT-000-5030 VESTIBULE INT-000-5003
TOILET- 00-MEU-043 WF-06
00-RAD-009 WF-09 1
ISSUED FOR CONSTRUCTION
00-RAD-010 1
SK-04 BABY CARE ROOM
WF-06
WP-05/WP-05 INT-000-5102
WF-08 INT-000-5102 00-MEU-038
WF-01
WF-08
1 SK-04
SK-03
INT-000-5044 CORRIDOR
WP-01/WP-05
C ?
PACS REP.
00-RAD-036
00-RAD-006
WF-08
WP-01/WP-05
?
? ULTRASOUND
SK-04
COUNTER-
TOILET- 00-RAD-007 1
RECEPTION
00-RAD-008
C 00-RAD-002 CORRIDOR
00-MEU-036 INT-000-3009
WF-08
WF-01
SIM SK-04 1
1
WP-01/WP-05
INT-000-5043 INT-000-3005
WP-01/WP-05
OFFICE- 2P OFFICE- 2P
DGL-01
00-RAD-004 00-RAD-003
WF-09
WF-09
LIFT LOBBY-
WF-08 WF-08 PUBLIC
00-VCC-006
SK-10 SK-10
2 Sim
MAIN-ENTRANCE INT-000-3013 4 3
LOBBY
CORRIDOR Stantec International Inc. European Business Center, P.O Box 52764,
00-MEU-031
00-MEU-002 2nd Floor, Dubai
WF09
WF09
SK02
SK02
INT-000-3013
VESTIBULE
INT-000-3013 00-MEU-033 Dubai Investment Park United Arab Emirates
Phone : 00971 4 8125000
Fax : 00971 4 812 5001
WAITING AREA
WF-10 VESTIBULE WF-10 00-MEU-032
00-MEU-001
SUB CONSULTANT:
WF-10 WF-10 WF-10
PROJECT TITLE
AM
STATUS APPROVED
MPH-STD-INT-L00-1003 00