You are on page 1of 4

Group 5 Member: Amad, Ladra, Lumantas, and Paco

Topics: Item 100-107, Item 200-208, Item 300-313

Test I. Multiple Choice

1. This item shall consist of roadway drainage and borrow excavation, and the disposal of material in
accordance with this Specification and in conformity with the lines, grades and dimensions shown
on the Plans or established by the Engineer
a. Item 100- Clearing and Grubbing
b. Item 101- Removal of Structures and Obstruction
c. Item 102- Excavation
d. Item 103- Structural Excavation

2. This item shall consist of clearing and grubbing, removing and disposing all vegetation and debris
as designated in the contract, except those objects that are designated to remain in place or are to
be removed in consonance with other provisions of this specification.
a. Item 100- Clearing and Grubbing
b. Item 101- Removal of Structures and Obstruction
c. Item 102- Excavation
d. Item 103- Structural Excavation

3. This item shall consist of the removal wholly or in part, and satisfactory disposal of buildings,
fences, structures, old pavements, abandoned pipe lines, and any other obstructions which are not
designated or permitted to remain, except for the obstructions to be removed and disposed off under
other items in the contract.
a. Item 100- Clearing and Grubbing
b. Item 101- Removal of Structures and Obstruction
c. Item 102- Excavation
d. Item 103- Structural Excavation

4. This Item shall consist of furnishing, placing and compacting an aggregate base course on a
prepared subgrade/subbase in accordance with this specification and the lines, grades, thickness
and typical cross-sections shown on the Plans, or as established by the Engineer.
a. Item 200- Aggregate Subbase Course
b. Item 201- Aggregate Base Course
c. Item 202- Crushed Aggregate Base Course
d. Item 203- Lime Stabilized Road Mix Base Course

5. This Item shall consist of a foundation for surface course composed of soil aggregate, lime and
water in proper proportions, road-mixed and constructed on a prepared subgrade/subbase in
accordance with this Specification and the lines, grades and typical cross-sections shown on the
Plans or established by the Engineer.
a. Item 200- Aggregate Subbase Course
b. Item 201- Aggregate Base Course
c. Item 202- Crushed Aggregate Base Course
d. Item 203- Lime Stabilized Road Mix Base Course

6. Thickness of Layer of Item 201- Aggregate Base Course


a. ±10mm
b. +5mm, -10mm
c. - 5mm
d. ±0.2 mm

7. This item shall consist of preparing and treating an aggregate base course with material in
accordance with the Plans and Specifications, preparatory to the construction of a bituminous
surface course.
a. Item 300- Aggregate Surface Course
b. Item 301- Bituminous Prime Coat
c. Item 302- Bituminous Tack Coat
d. Item 303- Bituminous Seal Coat

8. his item shall consist of an application of bituminous material with or without an application of
aggregate of an existing bituminous surface course in accordance with the Plans and Specifications.
a. Item 300- Aggregate Surface Course
b. Item 301- Bituminous Prime Coat
c. Item 302- Bituminous Tack Coat
d. Item 303- Bituminous Seal Coat

9. Method of Measurement for Item 306- Bituminous Road Mix Surface Coarse. Bituminous material
and aggregate for Bituminous Road Mix Surface Course will be measured by
a. Tonne
b. Cubic Meter
c. Millimeter
d. Square Meter

10. Method of Measurement for Item 311- Portland Cement Concrete Pavement. The area to be paid
for under this Item shall be the number of _____ of concrete pavement placed and accepted in the
completed pavement.
a. Tonne
b. Cubic Meter
c. Millimeter
d. Square Meter
11. ___ shall be constructed so as to protect green concrete against damage from sudden rising of the
stream and to prevent damage to the foundation by erosion.
a. Bridges
b. Cofferdams
c. Drainage
d. Highways

12. Unit of Measurement for Item 103- Structural Excavation


a. Tonne
b. Cubic Meter
c. Millimeter
d. Square Meter

13. This item shall consist of Pavement of Portland Cement Concrete, with or without reinforcement,
constructed on the prepared base in accordance with this specification and in conformity with the
lines grades, thickness and typical cross section shown on the Plans.

a. Item 308- Cold Asphalt Plant- Mix


b. Item 309- Bituminous Plant- Mix (Stockpile Maintenance Mixture-)
c. Item 310- Bituminous Concrete Surface Course Hot- Laid
d. Item 311- Portland Cement Concrete Pavement

14. This item shall consist of constructing Bituminous Surface Course (Asphalt Cold Mix) prepared in
central mixing plant, laid cold, on the prepared base in accordance with this Specification and in
conformity with the lines, grades and typical cross-section shown on the Plans.

a. Item 308- Cold Asphalt Plant- Mix


b. Item 309- Bituminous Plant- Mix (Stockpile Maintenance Mixture-)
c. Item 310- Bituminous Concrete Surface Course Hot- Laid
d. Item 311- Portland Cement Concrete Pavement

15. This Item shall consist of a bituminous stockpile maintenance mixture composed of aggregate,
mineral filler, hydrated lime and bituminous material mixed in a central plant. The mixture is
stockpiled for immediate or future maintenance needs.

a. Item 308- Cold Asphalt Plant- Mix


b. Item 309- Bituminous Plant- Mix (Stockpile Maintenance Mixture-)
c. Item 310- Bituminous Concrete Surface Course Hot- Laid
d. Item 311- Portland Cement Concrete Pavement

Test II. Enumeration

1. Construction Requirement (Item 203 )

Curing at least 5 days by either of the following curing methods:


1. Maintain in a thorough and continuosly moist condition by sprinkling with water

2. Covered the complete surface with 50mm layer of earth and maintain moist condition

3. Apply on the surface an asphalt membranea and quantity approved by the Engineer

4. Apply on the surface a liquid membrane curing compound of the type and quantity approved
by the Engineer.

2. Enumerate the 4 Road Pavement Structure layers:

a. Subgrade

b. Subbase Course

c. Base Course

d. Surface Course

Test III. Essay

1. What is the importance of DPWH Blue Book?

2. As a Civil Engineering Student, why do we need to study the DPWH Blue Book?