CLIENT NAME: MRS. MARINETTE INES ADARLO PROJECT: MATERIALS AND LABOR
We are pleased to submit our quotation
Item No. Materials Unit Material Cost Labor Cost Total Unit Cost 4.0 WINDOW GRILLS 8pcs 4.1 Installation of grills for t and b and materials1.5 tubluar gi pipe 1 lot Php 3,200.00 4.2 Welding rod, cutting disc Paint primer and paint finish OSM 1 lot 0.50X0.50 8 pcs Php 4,000.00