You are on page 1of 1

Doc no - OPPL/F/QA/17

OBSC PERFECTION PVT LTD QUALITY ALERT Rev no & Date - 02.10.2017

Part No.: 5819163-01 Date:09.03.2022


Part Description:Pulley with bearing (sub assly)
Nonconfirmance observed at (Inhouse/Customer end): CUSTOMER END
Horizontally Applied to: NA
Non Confirmance Details:
At customer end Rust and Coating defect observed .
NOT OK OK

Department Name Instructions Given

1)Process verification is done


Production Mr Anil singh (Production Manager) 2) As per SOP followed by Assy operator and Quality inspector.

Prashant Dinakar (QA) 1).Visual inspection should be done 100%


Quality 2)Proper tranning given to final inspector.
Gulshan kumar (inprocess inspector )

Sr. No Corrective Action / Preventive Action Responsibility Target Date

1 Process Verification and correction if required Mr.anil shing 09.03.2022

2 100% Verification for any inhouse stock avilable Prashant D 09.03.2022

Prepared By:Prashant Dinakar Approved By: Bushan Lokhande