SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff -March 2013) Rev 7 31-Mar-13

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

System Lay-up Report (Certificate) SATR-A-2009 30-Apr-13 Mech


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ONSHORE MAINTAIN POTENTIAL PROJECT BR CAT INTERNATIONAL

Note: This Cert is used for Lay-up Checklists SAIC-A-2018 (Plant Piping & Equipment) & SAIC-L-2124 (Pipelines)
Certificate No. Date:
Equipment: Service Fluid:
System Lay-up Duration: Start - End Date:
Hydro Test Medium: Type of Lay-up:
S.NO METHOD OF LAY-UP Actual Pass Fail Remarks
A Wet Lay-Up
Minimum residual oxygen scavenger concetration in water shall
A1 be 20 ppm & maximum O2 concentration of 10 ppb
Maintain the system under a positive pressure between 30 to 50
A2 psig using nitrogen, sweet hydrocarbon gas or hydraulic
pressure of the treated water
Use gauges to monitor the positive pressure in the system
A3 during lay-up with a scale range not exceeding three times the
target pressure. (Gauges must withstand MAOP)
B Dry Lay-Up

Remove the hydrotest water from the system. For facilities other
B1 than pipelines, drain the system completely, sweep and mop as
required to ensure that no visible traces of water remain.

When seawater or similar high salinity water has been used as


the hydrotest media, remove salts from the metal surface by
B2 rinsing with a low-salinity water containing less than 4,500 ppm
total dissolved solids.

Immediately after dewatering, start drying the system to a dew


B3 point that will ensure a dew point of -1°C or less at the final lay-
up pressure at all exit points.
Shut in the system, maintain and monitor the pressure per
B4 SAES-A-007 para 5.2.2.4 during the lay-up period.
B5 Measure Dew Point Temp -1°C or less after Shut-In Period
B6 Shut in system, maintain & monitor during lay-up period.
C Inert Gas Lay-Up
Displace the hydrostatic test water with nitrogen or sweet gas
C1 until no water drains out of the system.
Shut in the system at 2-10% of operating pressure but not
C2 exceeding 50 psig with nitrogen or hydrocarbon gas.
D Ambient Lay-Up

Displace the hydrostatic test water by positive pressure with


D1 nitrogen or sweet gas until no water drains out of the system.

Ensure that systems being drained have vacuum relief valves


D2 and pressure relief valves as necessary to protect the system.

Shut in the system under positive pressure until commissioning


D3 and start-up.
E Vapor-Phase Corrosion Inhibitor (VCI)

When the bulk of the water has been removed, blow vapor
Volume of System: _______
E1 phase corrosion inhibitor Cortec VpCI 309 or equivalent with
Amount of VCI Applied: _______
nitrogen until it is visibly discharged at the bottom of the valve.

E2 System shut-in to prevent ingress of moisture and debris


Contractor / Third-Party Saudi Aramco
Construction Representative* PMT Representative
Name, Initials and Date: Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date:

QC Inspector PID Representative


Name, Initials and Date: Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date:

QC Supervisor Proponent and Others


Name, Sign and Date: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Initials and Date:
Quality Record Approved:

Page 1 of 2
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff -March 2013) Rev 7 31-Mar-13

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

System Lay-up Report (Certificate) SATR-A-2009 30-Apr-13 Mech


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ONSHORE MAINTAIN POTENTIAL PROJECT BR CAT INTERNATIONAL

Note: This Cert is used for Lay-up Checklists SAIC-A-2018 (Plant Piping & Equipment) & SAIC-L-2124 (Pipelines)
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 2 of 2