Cum Plan 2.5% 7.5% 12.5% 17.5% 22.5% 27.5% 32.5% 37.5% 42.5% 47.5% 52.5% 57.5% 62.

62.5% 67.5% 72.5% 77.5% 82.5% 87.5% 92.5% 97.5% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
PROGRESS MEASUREMENT INSTALLATION HVAC PB Switchgear Room Cum Actual - 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
PO No. Days 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
Date 4-Jan 5-Jan 6-Jan 7-Jan 8-Jan 9-Jan 10-Jan 11-Jan 12-Jan 13-Jan 14-Jan 15-Jan 16-Jan 17-Jan 18-Jan 19-Jan 20-Jan 21-Jan 22-Jan 23-Jan 24-Jan 25-Jan 26-Jan 27-Jan 28-Jan 29-Jan 30-Jan 31-Jan
Total
No Description MP MP Qty Unit Duration Total Man Weight Week 1 Week 2 Week 3 Week 4
(hour) Hour Hours (%) % Complete
I Instalation Unit Baru
1 Transfer AHU 1,2 dan Panel dari Barge ke PB 4 4 1 lot 8 8 32 2.87%
2 Pembongkaran wooden box AHU 1,2 2 2 2 unit 2 4 8 0.72%
3 Pembongkaran wooden box Panel 2 2 2 unit 1 2 4 0.36%
4 Knock Down AHU 4 4 4 unit 2 8 32 2.87%
5 Transfer AHU dari PB Deck ke Roof Switchgear 4 4 2 unit 8 16 64 5.73%
6 Transfer Panel unit dari PB Deck ke Roof Switchgear 4 4 2 unit 2 4 16 1.43%
7 Re-Assy AHU 4 4 4 unit 8 32 128 11.47%
8 Install panel baru 2 2 2 unit 4 8 16 1.43%
9 Transfer PF unit 1,2 & ducting dari Barge ke PB 4 4 1 lot 8 8 32 2.87%
10 Bongkar wooden box PF unit 1,2 & ducting 2 2 2 unit 4 8 16 1.43%
11 Knock Down PF 2 2 1 unit 4 4 8 0.72%
12 Transfer PF dan ducting dari PB Deck ke Roof Switchgear 4 4 1 unit 4 4 16 1.43%
13 Re-Assy PF 2 2 1 unit 8 8 16 1.43%
14 Install ducting PF 4 4 1 lot 16 16 64 5.73%
15 Transfer Outdoor unit 1,2 dari Barge ke PB 4 4 1 lot 8 8 32 2.87%
16 Bongkar wooden box outdoor unit 1,2 2 2 4 unit 2 8 16 1.43%
17 Knock Down Outdoor unit 1,2 4 4 4 unit 4 16 64 5.73%
18 Transfer outdoor unit 1,2 dari Deck ke Roof Switchgear 4 4 2 unit 4 8 32 2.87%
19 Re-Assy Out door unit 1,2 4 4 2 unit 8 16 64 5.73%
20 Pengukuran kebutuhan instalasi pipa dan support pipa refrigerant (isometric) 2 2 4 unit 4 16 32 2.87%
21 Pabrikasi support untuk kabel tray 2 2 2 lot 4 8 16 1.43%
22 Install kabel tray 2 2 2 lot 4 8 16 1.43%
23 Pulling cable (power & accessories) Outdoor, Indoor, PF 2 2 2 lot 8 16 32 2.87%
24 Test insulation resistan and continuity motor, compressor 2 2 2 lot 4 8 16 1.43%
25 Glanding, Splicing, Terminasi, Grounding, Bonding, Tagging 2 2 2 lot 8 16 32 2.87%
26 Instalasi pipa drain 2 2 1 lot 8 8 16 1.43%
27 Instalasi support Pipa reffrigerant 2 2 4 unit 2 8 16 1.43%
28 Instalasi Pipa reffrigerant 2 2 4 unit 8 32 64 5.73%
29 Leak Test (test kebocoran system) and monitoring 2 2 4 unit 8 32 64 5.73%
30 Vaccum dan isi freon R 417A (monitoring) 2 2 4 unit 4 16 32 2.87%
II Commissioning dan Test Online
31 Persiapan test run unit 4 2 4 unit 1 4 8 0.72%
32 Internal test panel (dry test) 2 2 2 unit 2 4 8 0.72%
33 De isolasi energi 1 & 2 2 2 2 unit 0.5 1 2 0.18%
34 Test arah putaran dari motor CU dan Blower AHU unit 1 & 2 dan PF 2 2 2 unit 2 4 8 0.72%
35 De isolasi energi 3 & 4 2 2 2 unit 0.5 1 2 0.18%
36 Test arah putaran dari motor CU dan Blower AHU unit 3 & 4 dan PF 2 2 2 unit 2 4 8 0.72%
37 Preparation start up unit 1 & 2 + PF (check power, setting HP - LP, Valve, OL) 2 2 2 unit 2 4 8 0.72%
38 Start up HVAC unit 1 & 2 dan Monitoring 2 2 1 lot 1 1 2 0.18%
39 Record data running unit 1 & 2 dan monitoring 2 2 1 unit 16 16 32 2.87%
40 Preparation start up unit 3 & 4 + PF (check power, setting HP - LP, Valve, OL) 2 2 2 unit 2 4 8 0.72%
41 Start up HVAC unit 3 & 4 dan Monitoring dan Switch Over 2 2 1 lot 1 1 2 0.18%
42 Record data running unit 3 & 4 dan monitoring 2 2 1 unit 16 16 32 2.87%
Sub Total 213 414 1116 100.00%

Activity to day:
1
2
3
4
5

Kendala jika ada:


1 Pekerjaan dilakukan oleh man power 3 ORANG, ( 1 orang tdk bisa berangkat )
CURVA PROGRESS MEASUREMEN
Start: 4 Jan - Feb, 2014

100%

95%

90%

85%

80%

75%

70%

65%

60%

55%

50%

45%

40%

35%

30%

25%

20%

15%

10%

5%

0%
1 2 3 4 5 6 7 8 9 10 11
MEASUREMENT PROGRESS INSTALATION HVAC PB SWITCHGEAR "PLAN vs

Cum Plan
Cum Actual

9 10 11 12 13 14 15 16 17 18 19 20
GEAR "PLAN vs ACTUAL"

19 20 21 22 23 24 25 26 27 28