DC Lights
 For SHS and BCS, DC lights are necessary
– Available power is very limited
– Electricity is very precious
– High efficiency lights are necessary
 Type of DC Lights
– DC Fluorescent Lamp
Compact Fluorescent Lamp (CFL)
– Halogen Lamp
– LED Lamp (Preferred Lamp for HEP Project because of its
high efficiency)
3W&1W LED
1W LED

7 W LED
Load 3/19

DC Lights
 Halogen lamp is easily available at automobile parts shop
– Easily available but power consumption is higher than CFL.
 LED lamp is now popular as lightings for both off-grid and on-grid areas
– Cost of LED is becoming cheaper than CFL light.
– LED light is now one of the component recommended for SHS

Illuminance at each
Lights Current (A) distance from light (Lux)
1m 2m
CFL 9W 0.58 83.0 20.0
Halogen 10W 0.80 50.0 8.0
LED 2.5W 0.23 120.0 35.0
Candle N/A 1.2 0.5
Load Management for SHS30
3.0W LED Lamp
1.0 W LED 5.0W CP 5.0 W Built-in Total
Option
Sala Kitchen Room Overnight Charger Radio/MP3 consumption

1 4 hrs 4 hrs 3 hrs 12 hrs 3 hrs 4 hrs 80 Wh

2 5 hrs 3 hrs 3 hrs 12 hrs 3 hrs 4 hrs 80 Wh

at 61%-80%
State of 6 hrs 2 hrs 2 hrs 11 hrs 1 hrs 2 hrs 56 Wh
Charge
at 41%-60%
State of 4 hrs 2 hrs 2 hrs 11 hrs 0 hrs 1 hrs 40 Wh
Charge
At 21%-40%
State of 4 hrs 2 hrs 0 hrs 2 hrs 0 hrs 1 hrs 25 Wh
Charge
At 0%-20%
State of 2.5 hrs 0 hrs 0 hrs 0 hrs 0 hrs 0 hrs 8 Wh
Charge
Load Management for SHS75
7.0W Linear LED 3.0W LED Lamp
5.0W 5.0 W Built- Total
Option Backdoo CP in consumptio
Office 1 Office 2 Room Frontdoor Charger Radio/MP3 n
r

1 8 hrs 6 hrs 3 hrs 5 hrs 6 hrs 5 hrs 7 hrs 200 Wh

2 8 hrs 7 hrs 5 hrs 0 hrs 10 hrs 2 hrs 8 hrs 200 Wh

at 61%-80%
State of 8 hrs 3 hrs 3 hrs 0 hrs 8 hrs 2 hrs 4 hrs 140 Wh
Charge
at 41%-60%
State of 6 hrs 0 hrs 3 hrs 0 hrs 8 hrs 2 hrs 3 hrs 100 Wh
Charge
At 21%-40%
State of 4 hrs 0 hrs 3 hrs 0 hrs 8 hrs 0 hrs 0 hrs 61 Wh
Charge
At 0%-20%
State of 1 hrs 0 hrs 0 hrs 0 hrs 4 hrs 0 hrs 0 hrs 19 Wh
Charge
21%-40% 41%-60% 61%-80%
SOC SOC SOC

0%-20% 81%-100%
SOC SOC
COMPUTATION of AVAILABLE
ENERGY
Irradiation Data (NASA)
Bislig Butuan CDO/ Cot. Davao Dipolog GenSan Glan Kor. Monkayo Pagadia Surigao Tandag
Lumbia City / Mati n City City

Jan 3.83 4.09 4.67 4.6 4.43 4.77 4.55 5.11 5.13 4.78 4.84 4.43 4.15
Feb 4.3 4.59 5.22 4.94 4.75 5.32 4.88 5.48 5.44 5.22 5.23 5.07 4.83
Mar 4.95 5.24 5.99 5.46 5.32 5.99 5.35 6.03 5.95 5.82 5.64 6 5.51
Apr 5.59 5.83 6.39 5.7 5.71 6.16 5.63 6.23 5.88 6.18 5.82 6.7 6.2
May 5.52 5.59 5.91 5.26 5.37 5.61 5.19 5.62 5.35 5.73 5.21 6.53 5.95
Jun 5.01 4.93 5.33 4.89 4.92 4.97 4.89 5.05 5.02 5.24 4.73 5.69 5.23
Jul 5.13 4.89 5.27 4.86 4.9 4.95 4.96 5.04 5.06 5.25 4.64 5.53 5.24
Aug 5.34 4.9 5.36 4.9 4.99 5.09 5.08 5.27 5.22 5.58 4.74 5.63 5.36
Sep 5.4 4.99 5.51 4.96 5.09 5.14 5.2 5.62 5.35 5.85 4.83 5.8 5.55
Oct 4.91 4.76 5.18 4.79 4.98 4.87 5.06 5.59 5.29 5.7 4.65 5.28 5.07
Nov 4.27 4.41 4.94 4.74 4.75 4.79 4.89 5.34 5.22 5.34 4.72 4.73 4.42
Dec 3.84 4.11 4.63 4.63 4.43 4.66 4.62 5.08 5.17 4.84 4.73 4.39 4.12

Ave 4.84 4.86 5.37 4.98 4.97 5.19 5.03 5.46 5.34 5.46 4.98 5.48 5.14
Model Data (Bislig)
Irradiation Data (kW/m2/day) Available Energy (Wh)
Tilt 0 Tilt 10 Tilt 15 SHS30 SHS75

Jan 3.83 4.06 4.14


Feb 4.3 4.46 4.51
Mar 4.95 5 4.99
Apr 5.59 5.46 5.35
May 5.52 5.24 5.06
Jun 5.01 4.71 4.52
Jul 5.13 4.84 4.65
Aug 5.34 5.15 5.02
Sep 5.4 5.38 5.33
Oct 4.91 5.06 5.09
Nov 4.27 4.51 4.6
Dec 3.84 4.11 4.21
 
Ave 4.84 4.83 4.79
Min 3.83 4.06 4.14
Max 5.59 5.46 5.35
Model Data (Bislig)
6

5
Irradiation Data

3
Tilt 0

2 Tilt 10

Tilt 15
1

0
n b r r y n l g p t v c
Ja Fe Ma Ap Ma Ju Ju Au Se Oc No De

Month

10
Model Data (Bislig)
6

4
Irradiation Data

Ave
2 Min
Max
1

0
Tilt 0 Tilt 10 Tilt 15

Tilt Angle
Model Data (Bislig)
Irradiation Data (kW/m2/day) Available Energy (Wh)
Tilt 0 Tilt 10 Tilt 15 SHS30 SHS75

Jan 4.14 79 199


Feb 4.51 87 216
Mar 4.99 96 240
Apr 5.35 103 257
May 5.06 97 243
Jun 4.52 87 217
Jul 4.65 89 223
Aug 5.02 96 241
Sep 5.33 102 256
Oct 5.09 98 244
Nov 4.6 88 221
Dec 4.21 81 202
     
Ave 4.79 92 230
Min 4.14 79 199
Max 5.35 103 257
Formula

Ep = PVcap x IRR x PR

E – Available Energy
Pvcap – Capacity of PV Module
IRR- Irradiation Data
PR – Performance Ratio
13
Formula

For SHS-30:

E = 30 x 4.14 x 0.64
= 79.49 Wh
approx- 80Wh

14
Formula

For SHS-75:

E = 75 x 4.14 x 0.64
= 198.72 Wh
approx - 200Wh

15
COMPUTATION of ENERGY
CONSUMPTION

16
Formula

Econ = Lp x T

Econ – Energy Consumption


(Wh)
Lp – Load Power Rating (W)
T - Time of Use (h)
17
Energy Consumption of SHS30

LED Charger/Radio/MP3

Rated Power (Watt) 3 3 3 1 5 5

No. of hours Used (hr) 4 4 3 12 3 4

Energy Consumed
12 12 9 12 15 20 80
(Wh)
END OF MODULE 8: