You are on page 1of 5

JADUAL PEMBAHAGIAN MASA PEMBELAJARAN BERSEMUKA

EE-021-2-2012 ELECTRONIC PRODUCT TROUBLESHOOTING, REPAIR AND MAINTENANCE OPERATION


EE-021-2-2012-C03 INDUSTRIAL ELECTRONIC EQUIPMENT INSTALLATION
Masa Masa
Pelan Mengajar Teori Pelan Mengajar Amali Bersemuka
Work Activities Bersemuka
(Tajuk) (Tajuk) ( Amali )
( Teori )

EE-021-2:2012-C03/P (1/20) PM
(Langkah Keselamatan dan Jenis 3
Peralatan Elektronik)

EE-021-2:2012-C03/P (2/20) PM
(Mengenalpasti keperluan EE-021-2:2012-C03/K(1/3)PM
3
1. Identify electronic equipment pemasangan peralatan elektronik – (Buat Pemasangan Peralatan Elektronik
Installation requirements Sistem Komputer) (Pasang Peranti Komputer)
EE-021-2:2012-C03/P (3/20) PM
(Mengenalpasti keperluan
3
pemasaangan peralatan elektronik EE-021-2:2012-C03/K(2/3)PM 74.7
– Sistem Siaraya) (Buat Pemasangan Peralatan Elektronik
EE-021-2:2012-C03/P (4/20) PM (Pasang CCTV)
(Mengenalpasti keperluan
3 EE-021-2:2012-C03/K3/3)PM
pemasangan peralatan elektronik –
Sistem CCTV) (Sedia Borang Maklumbalas Pelanggan)

EE-021-2:2012-C03/P (5/20) PM
(Keadaan Lokasi, Manual & 3
Senarai Semak Pemasangan)
EE-021-2:2012-C03/P (6/20) PM 3
(Pemasangan Perisian, Pelan
Lokasi Pemasangan dan Rajah
Litar)

EE-021-2:2012-C03/P (7/20) PM
3
(Jenis Alat Pemasangan)
EE-021-2:2012-C03/P (8/20) PM
3
(Jenis Bahan)
EE-021-2:2012-C03/P (9/20) PM
3
(Teknik Pemasangan)
7. Install Industrial Electronic EE-021-2:2012-C03/P (10/20) PM
3
Equipment (Teknik Mengikat)
EE-021-2:2012-C03/P (11/20) PM
(Prosedur Mengendali Peralatan 3
Elektronik)
EE-021-2:2012-C03/P (12/20) PM 3
(Jenis & Prosedur Mengisi Senarai
Semak)
13. Confirm customer EE-021-2:2012-C03/P (13/20) PM
acceptance (Isu Pemasangan Peralatan
Elektronik)

2.7
EE-021-2:2012-C03/P (14/20) PM
2.7
(Sikap Terhadap Keselamatan )

EE-021-2:2012-C03/P (15/20) PM
2.7
(Jenis Maklumbalas Pelanggan)

EE-021-2:2012-C03/P (16/20) PM
2.7
(Kemahiran Komunikasi)

EE-021-2:2012-C03/P (17/20) PM 2.7


(Halangan Komunikasi Komunikasi)
EE-021-2:2012-C03/P (17/20) PM
2.7
(Kemahiran Menulis Laporan)
EE-021-2:2012-C03/P (18/20) PM
2.7
18. Report industrial electronic (Format Laporan)
equipment installation EE-021-2:2012-C03/P (19/20) PM
activites (Borang Laporan Peralatan 2.7
Pemasangan)
EE-021-2:2012-C03/P (20/20) PM
2.7
(Borang Kerja Pemasangan)
JUMLAH JAM
74.7
60.3

RUJUKAN UNTUK PENGIRAAN MASA BERSEMUKA TEORI DAN AMALI


(RUJUK CoCU: C05)
TRAINING HOURS
WORK ACTIVITIES
RELATED RELATED
KNOWLEDGE SKILLS
1.Identify electronic equipment Installation requirements
20 30
2.Install Industrial Electronic Equipment 20 30
3.Confirm customer acceptance
15 15
4.Report industrial electronic equipment installation
12 8
activites
(TRAINING DURATION = 109 JAM) 67 83

JADUAL PENETAPAN PERATUSAN MASA AKTIVITI PEMBELAJARAN DAN PENILAIAN


EE-021-3-2012 ELECTRONIC PRODUCT TROUBLESHOOTING, REPAIR AND MAINTENANCE OPERATION
EE-021-2-2012-C03 INDUSTRIAL ELECTRONIC EQUIPMENT INSTALLATION

Pecahan Masa (%) Pecahan Masa (Jam)


Jumlah
Kod CU Bersemuka Kendiri Penilaian Bersemuka Kendiri Penilaian
Jam (Y) Jumlah
(A) (B) (C) (A/100 X Y) (B/100 X Y) (C/100 X Y)
EE-021-2-2012-C03 150 60 25 15 100 90 38 23

You might also like