NOTE:

FROM LAUNDRY

Φ50 VP Φ50 VP CO 11
Φ50 VP T/A
Φ50 VP T/A Φ75 WP
Φ110 SP
Φ50 WP Φ50 VP Φ50 VP Φ110 SP Φ110 SP
F/A T/A T/A Φ110 SP T/B F/A
Φ50 VP Φ110 SP
Φ75 VP T/A LEGEND
Φ50 WP LAV T/A WP WASTE PIPE
AFC
Φ110 SP
SP SOIL PIPE

Sl
VP VENT PIPE

op
WC WC WC WC

e:
1%
Φ75 WP Φ75 WP
Φ75 WP
CO RWP RAIN WATER PIPE
WC Φ75 WP
CO CND CONDENSATE PIPE

CO Φ75 WP Slope: 1% Φ75 WP


AFC AFC
Φ75 WP ABBREVIATIONS
FD FLOOR DRAIN

Φ75 WP CO CLEAN OUT


AFC FCO FLOOR CLEAN OUT
WCO WALL CLEAN OUT

Slope: 1%
GT GULLY TRAP
RD ROOF DRAIN
AD AREA DRAIN
VTC VENT CAP
22
Showers WC WATER CLOSET
23.25 m² Φ50 VP
F/B LAV LAVATORY
HB HOSE BIB
JNT JANITORIAL UNIT
Φ75 WP SH SHOWER
12 KS KITCHEN SINK

Φ50 VP 21 CONDENSATE PIPE IC INSPECTION CHAMBER


Janitor 20
T/A Toilets Φ75 WP CONNECTION U/T UNDER TILE
3.75 m² Φ50 VP
F/B 33.45 m² T/B CO U/G UNDER GROUND
Slope: 1%
AFC ABOVE FALSE CEILING
CO
Φ50 WP T/B TO BELOW
JNT WC WC
Φ75 WP WC WC Φ75 WP F/A FROM ABOVE
AFC
Φ75 WP Φ50 WP Φ75 WP
Slope: 2% Slope: 1%
AFC F/A T/B
CO

Φ50 WP CO
Φ50 WP Φ50 WP
Φ50 VP Φ50 VP
Φ50 VP Φ50 VP Slope: 1% AFC
T/A AFC T/A Φ50 VP Φ50 VP
AFC Φ50 VP
LAV T/A Φ50 VP Φ50 VP Φ110 SP
Φ50 VP T/A T/A F/A
Φ50 VP T/A Φ50 VP
T/A CO Φ50 VP Φ75 VP Φ50 VP
CO
Φ50 VP Φ110 SP
CO T/A CO KEY PLAN:
SH SH SH SH SH Φ50 VP T/A T/A T/B
Φ50 VP Φ50 VP
AFC Φ50 VP
F/B T/A
13
Φ50 VP Φ50 VP Φ50 VP Φ50 VP Φ50 VP Φ50 VP Φ50 VP
T/A T/A T/A T/A F/B T/A T/A AFC
C D E F

GF - SHOWERS 22 & JANITOR 21 & TOILETS 20 HIGH LEVEL


01 1 : 25

FROM PANTRY

Slope: 1%
Φ50 VP CO
Φ50 VP Φ50 VP Φ110 SP CO CO 11
Φ50 WP Φ110 SP T/A Φ110 SP 01 27/12/2021 Revised as per comments
T/A T/A F/A
U/T LAV
Φ110 SP
00 29/7/2021 First Issue

Slope: 1%

Slope: 1%
Φ50 WP Client:
Φ110 SP
U/G
FD FD
Φ75 WP
FD
Φ50 VP MINISTRY OF DEFENSE
FD U/G T/A
ROYAL SAUDI AIR FORCES
WC WC WC
FD
Supervision:

Φ75 WP Φ75 WP Φ75 WP


ENGINEERING AND WORKS
Φ75 WP WC
WC U/G
U/G
U/G U/G DEPARTMENT
ENGINEERING AFFAIRS
Slope: 1%
FCO
DEPARTMENT OF PROJECTS

1%
Consultant:

e:
op
Sl
DAR AL-HANDASAH
22 20
Showers FD Toilets
23.25 m² 33.45 m²

Slope: 1%
FCO
Φ50 VP 21
T/A Janitor
Φ75 WP
3.75 m²
U/G
Φ75 WP FCO
12 Contractor:
FCO Φ75 WP Φ75 WP Φ110 WP Slope: 1% Φ75 WP
Slope: 1% U/G U/G
U/G U/G U/G

Φ75 WP
Φ50 WP Slope: 1%
Φ50 WP F/A WC Φ75 WP
U/G Φ50 VP Φ75 WP Contractor's Consultant:
U/G T/A U/G WC Φ50 VP WC U/G WC
Φ50 WP Φ50 WP Φ50 WP FD CO U/G ONEWORKS s.p.a.
CONDENSATE PIPE U/G U/G FD FD FD
U/G Φ50 VP Via Amatore Sciesa 3, 20135 MILANO
CONNECTION Φ75 WP Φ50 VP
U/G T. +39 02 655913 1 F. +39 02 655913 60
U/G FD U/G Φ50 VP
Φ50 VP e-mail: milano@one-works.com
Φ50 WP F/A U/G
Φ50 WP U/G U/G
U/G JNT Slope: 1% Φ50 WP
Φ75 WP LAV
U/T CO SETS
Φ50 VP U/G Hamra Square, 2034 4605 BEIRUT
Φ110 SP Φ110 SP Φ110 SP
Slope: 1%

Slope: 1%

Φ50 VP T. +961 1 755 411 F. +961 1 755 422


T/A F/A e-mail: info@setsintl.net
T/A
FD Φ50 VP CO CO Facility Name:
Φ50 VP T/A

Slope: 1%
SH SH SH SH SH CO Police and Intelligence Wing area - AP-07 - Air police housing buildings
WCO T/A

‫ ﻣﺑﺎﻧﻲ ﻣﺳﺎﻛﻥ ﺍﻟﺷﺭﻁﺔ ﺍﻟﺟﻭﻳﺔ‬AP-07 ‫ﻣﻧﻁﻘﺔ ﺟﻧﺎﺡ ﺍﻟﺷﺭﻁﺔ ﻭﺍﻟﻣﺧﺎﺑﺭﺍﺕ‬


13
Drawing Title:
Police and Intelligence Wing area - AP-07 - Air police housing buildings
Φ50 VP Drainage System - Enlarged Details
Φ50 VP Φ50 VP Φ50 VP Φ50 VP Φ110 RNW Φ50 WP Φ50 WP Φ50 WP
T/A T/A T/A T/A T/A F/A ‫ ﻣﺑﺎﻧﻲ ﻣﺳﺎﻛﻥ ﺍﻟﺷﺭﻁﺔ ﺍﻟﺟﻭﻳﺔ‬AP-07 ‫ﻣﻧﻁﻘﺔ ﺟﻧﺎﺡ ﺍﻟﺷﺭﻁﺔ ﻭﺍﻟﻣﺧﺎﺑﺭﺍﺕ‬
‫ ﺍﻟﺭﺳﻭﻣﺎﺕ ﺍﻟﺗﻔﺻﻳﻠﻳﺔ‬- ‫ ﻧﻅﺎﻡ ﺍﻟﺻﺭﻑ ﺍﻟﺻﺣﻲ‬- ‫ﺍﻟﻁﺎﺑﻖ ﺍﻻﺭﺿﻲ‬
C D E F
Scale Sheet
1/25 2/2
GF - SHOWERS 22 & JANITOR 21 & TOILETS 20 LOW LEVEL
02
Drawn by: Checked by: Approved by: Certified by: Date:
EA MA AD AY 29/07/2021
1 : 25 Sheet No. Revision
S19091-DIB-BSSJV-PK2-APH-FD-M-MDR-01-GF-02-0201 01