1. PART 1 GENERAL
1.2.2. Sewage treatment plant Contractor shall be fully responsible for design,
supply, installation, and testing and commissioning of complete sewage
treatment works from sewage lift station to treated effluent backwash
tank (both inclusive), and the equipment shelter as required. The
Contractor shall be responsible for civil, mechanical and electrical
(power, lighting, panel boards and controls) works for the proposed
sewage treatment facility. Contractor's design for all sewage treatment
works including equipment, lift station, tanks and equipment shelter
shall be subject to approval of the Contracting Officer. Contractor shall
follow the recommendations of Soil Investigation Report (available with
the Owner) for the design of foundations for tanks, lift station and pump
house or equipment shelter.
1.2.3. Sewage treatment plant Contractor shall coordinate closely with other
Contractors for works and requirements affecting sewage treatment
system.
1.3. REFERENCES
ASTM A 194/A Carbon and Alloy-Steel Nuts for Bolts for High-
pressure and High- Temperature Service
1.4.2. Calculations and drawings for the proposed plant and associated
construction work shall be submitted to the Contracting Officer for
review and approval. Manufacturing shall not start until the design has
2. PART 2 - PRODUCTS
2.1.1. General:
2.1.1.3. All the pumps, except for chlorine dosing pumps, shall be
from single manufacturer.
2.1.2.2. Sewage treatment plant shall be virtually free from foul odor.
The plant design shall enable sufficient dissolved oxygen in
the process water at any given time.
2.1.4.2. Raw waste water shall gravitate into the influent lift station
provided with a minimum working volume of 20 m3 to ensure
less than 10 start/stop per hour operations of the lift station
pumps provided in the station.
2.1.4.3. The influent shall be pumped by the two duty/one lag non-clog
submersible pumps into the above ground bio-reactor tanks
through the coarse bar screen, each pump shall be sized for
required average hourly flow. An electromagnetic flowmeter
complete with flow indicator and totalizer shall be provided on
the pump discharge line.
o Training of personnel.
q. Laboratory equipment.
2.2.1. Piping:
2.2.1.3. Painting for Above Ground Piping: All above ground piping
shall have enamel paint finish.
2.3.1. Above ground Bio-Reactor and Chlorine Contact tanks, shall be bolted
type glass coated steel tanks. The inert glass shall be chemically bonded to
the steel sheet by spraying the grit blasted with specially prepared slip and
then drying it prior to firing it in a furnace at a temperature of up to 90
degree C. The molten glass fuses with the surface of the steel giving a
permanent high bond strength. Rubber gaskets shall be used at bolted
connections. Material, design, fabrication, and erection of bolted steel
tanks shall conform to AWWA D103 or equivalent Standards. Steel sheets
shall conform to ASTM A 570, Grade 33. Galvanized steel bolts shall
conform to ASTM A 307. All coatings shall be factory applied. Field
coating, except for touch-up will not be acceptable. Size and shape of tanks
shall be as shown on drawings. Tanks shall be with reinforced concrete
foundation designed by the Contractor and approved by the Contracting
Officer. Reinforced concrete shall comply with the requirements of
Division 3 - CONCRETE. Concrete shall be of minimum 30 MPa
compressive strength at 28 days. Waterproofing concrete foundation shall
comply with the requirements of Division 7 - THERMAL AND
2.5.1. Chlorine dosing system tank shall be of polyethylene construction, size and
shape as shown on drawings, and shall be provided with complete chlorine
dosing system including chlorine dosing pumps as manufactured by
PROMINENT PUMPS or WALLACE TIERNAN or LMI or approved
equal; type and capacity as shown on drawings. Pumps shall be with
control panel provided in weatherproof enclosure.
2.6.1. Shall be manufacturer's standard suitable for the sewage treatment plant
operation. Control panel shall be installed in weatherproof polyester
enclosure with IP 55 protection.
3. PART 3 - EXECUTION
3.1 INSTALLATION
3.2.1. General: Provide clean water, appliances, consumable stores and sewage
necessary for the complete testing of the sewage treatment plant and
pumps.
3.2.4. Prior to backfilling of any excavation, perform the hydraulic test for the
piping below. Sewage treatment plant shall be filled with water and kept
filled for 2 days during which time it will be regularly inspected for loss
of water and for signs of leakage externally.
- Dissolved Oxygen
- Settable Matter
- Sludge Settlement
- Chlorine
- pH
- Temperature
3.4. WARRANTY
3.4.1. Sewage treatment plant and the related equipment specified herein shall be
guaranteed against defects for one year starting from the date of substantial
hand over.
END OF SECTION