APPLICATION FOR CONSTRUCTION PERMIT

STEP 1 : DATA TO BE FILLED UP BY HOMEOWNER AND DEVELOPER ACCORDINGLY


To be filled up by Homeowner To be filled up by Developer
OWNER'S NAME : VILLAMOR, LAURA DAEZ APPLICATION NO. :
SUBDIVISION : CAMELLA PROVENCE PH10 DATE FILED :
BLOCK / LOT : 006-0024 PERMIT DATE ISSUE :
HOUSE MODEL : CARA EXPIRY DATE :
CONTACT NUMBER :
EMAIL ADDRESS :

STEP 2 : DEVELOPER TO IDENTIFY THE NATURE OF CONSTRUCTION AND HOMEOWNER TO COMPLETE THE REQUIRED DOCUMENTS

NATURE AND CONSTRUCTION TO BE IDENTIFIED BY DEVELOPER REQUIREMENTS TO BE COMPLETED BY HOMEOWNER


MAJOR CONSTRUCTION MINOR CONSTRUCTION MAJOR CONSTRUCTION MINOR CONSTRUCTION
HOUSE CONSTRUCTION HOUSE REPAIRS AND ENHANCEMENT x SIGNED CONSTRUCTION GUIDELINES x SIGNED CONSTRUCTION GUIDELINES
X HOUSE EXPANSION INTERIOR RENOVATION x SITE DEV PLAN x SITE DEV PLAN
AUXILLIARY STRUCTURES MINOR AUXILLIARY STRUCTURES x PLANS (with dimensions) x PLANS (with dimensions)
CARPORT/BALCONY/PORCH X CANOPY/TRELLIS x ELEVATIONS (with specs) x ELEVATIONS (with specs)
X FENCE LANDSCAPING SECTIONS x MATERIAL SAMPLES (IF NOT SAME AS UNIT)
OTHERS (SPECIFY) ACU & GRILLES DETAILS x BOM & SPECS
X OTHERS (SPECIFY): PERSPECTIVE x HOA CLEARANCE RPT PAYMENT
SPIRAL STAIRS x MATERIAL SAMPLES (IF NOT SAME AS UNIT)
x BOM & SPECS
x HOA CLEARANCE RPT PAYMENT
Once Homeowner completed the requirements, Developer will assess the drawings.
STEP 3 : DEVELOPER ASSESSMENT

REMARKS ASSESSMENT
1
* PROCEED
FOR REVISION
APPROVED WITH COMMENTS
INCOMPLETE ATTACHMENTS
AR.DAD-PLANNING ENDORSED FOR BUILDING PERMIT APPLICATION
Signature over Printed Name - DEVELOPER (Subject to Owner's compliance with the Building Code)
2 PROCEED
FOR REVISION
APPROVED WITH COMMENTS
INCOMPLETE ATTACHMENTS
ENDORSED FOR BUILDING PERMIT APPLICATION
Signature over Printed Name - DEVELOPER (Subject to Owner's compliance with the Building Code)
Once documents are approved, Homeowners should secure building permit to major construction or proceed to Step 5 for minor construction.
Once building permit is approved by LGU, return to developer for Step 4.
STEP 4 : TO BE FILLED UP BY DEVELOPER

BUILDING PERMIT APPROVAL (FOR MAJOR CONSTRUCTION)

BUILDING PERMIT NUMBER ISSUANCE DATE OF BUILDING PERMIT DEVELOPER Signature - Date
Once assessed by Developer, proceed to step 5
STEP 5 : TO BE CHECKED AND ASSESSED BY DEVELOPER

ADDITIONAL REQUIREMENTS PRIOR RELEASE OF PERMIT


MAJOR CONSTRUCTION MINOR CONSTRUCTION
SUBMIT APPROVED PRELIMINARY PLANS SUBMIT APPROVED PRELIMINARY PLANS
SUBMIT (2) SETS COPY OF APPROVED BUILDING PERMIT PLANS PROVIDE LIST OF MANPOWER/WORKERS WITH SAMPLE ID
PROVIDE LIST OF MANPOWER/WORKERS WITH SAMPLE ID PROVIDE LIST OF EQUIPMENT
PROVIDE LIST OF EQUIPMENT PAY CONSTRUCTION BOND OR NO.
PAY CONSTRUCTION BOND OR NO. PAY PROCESSING FEE OR NO.
PAY PROCESSING FEE OR NO. INDICATE CONSTRUCTION DURATION:
INDICATE CONSTRUCTION DURATION:

VERIFIED BY:

Signature over Printed Name - DEVELOPER DATE SIGNED

SERIES_MARCH_2021
RTY R TY
MA K

MA K
ROP E

ROP E
R

R
ER P ER P

PHASE 10

006-0024
F F

3 4

2 5

CARA

F
1 6

10

Remarks:
Client Request

GENERAL NOTES:
F

ANY CHANGES MADE & INSTRUCTED BY THE


CLIENT SHALL AUTOMATICALLY WAIVED THE
DEVELOPERS WARRANTY ON THE WORKMANSHIP
AND QUALITY OF THE PRODUCT INTRODUCED.
F

PREPARED BY:

APPROVED BY:
RTY R TY
MA K

MA K
ROP E

ROP E
R

R
ER P ER P

CONFORME / OWNER: