You are on page 1of 1

DOLE/BWC/OHSD/IP-5

Republic of the Philippines


Department of Labor and Employment
BUREAU OF WORKING CONDITIONS
Manila

REPORT ON HEALTH AND SAFETY ORGANIZATION


Date April 05, 2021
Regional Labor Office No.
File Number

Name of Establishment: ROCKVIEW INDUSTRIAL FACILITIES CONSTRUCTION


Address: No. 6376 Gerason Subd., Sta. Rita Karsada, Batangas City, Batangas
Nature of Business: General Contractor - general building, general engineering, contracting

Number of Persons Employed (Including Management) Twenty-two (22) Employees

1st Shift: Male: 17 Female 5


2nd Shift: Male: Female
3rd Shift: Male: Female
TOTAL: Male: 17 Female 5

A. POLICY AND PROGRAM ON SAFETY AND HEALTH:


- Please see attached Rockview Industrial Facilities Const. HSE Safty Program
B. COMPOSITION OF SAFETY AND HEALTH COMMITTEE: TYPE: D
CENTRAL SAFETY COMMITTEE
NAME POSITION IN ESTABLISHMENT

Chairman: Almario J. Sagun Operations Manager


Members: Joselito Fruelda Project Manager
Cathlene Lyka Manalo Certified First Aider
Stefanie Precious Fainsan Project Engineer
Secretary: Fedora Daphne Darm Safety Officcer (SO-3)

B. TECHNICAL INFORMATION:
A. Brief description of process operation and number and kind of equipment.
Construction of Ashpond Storage A5 will be done at Brgy. Sinisian, Calaca, Batangas with a total area
of 22,000 square meters (Approx. 2 hectares) with a total depth of 15-meters considering 3-benches
of gradual inclination (1.5 meter bench each at every 5-meters height) with 45 degrees inclination to
be excavated by Heavy Equipment (4-dump truck and 2-backhoe).

Submitted by:

Ponchito F. Fronda
General Manager / Owner

You might also like