Professional Documents
Culture Documents
Barnala Esp Approved From HQ
Barnala Esp Approved From HQ
TRAP/FM,CH:295.279
TP2:CH:-310.353 (C)
TP2:CH:-318.844 (B)
TP1:CH:-281.385 (B)
TP2:CH:-310.953 (E)
1540 SLEEPERS PER KM WITH 250 MM BALLAST CUSHION ON PROPOSED LOOP LINES AND SIDINGS.
TP1:CH:-225.033 (C)
9. ALL ROOMS REQUIRED FOR SERVICES S&T, ELECTRICAL AND FOR COMMERCIAL & PASSENGER AMENITIES, SEPARATE PLAN SHALL BE
CL
SRJ-CH:263.25
KM:112.726 C.L. OF 2x12.19(GIRDER)BR NO-206
PF-CH:-157.350
SRJ-CH:339.65
SRJ-CH:88.95
PF CH:82.174
DE-CH:356.3
DE-CH:96.00
02
CH:375.33
TO BE EXTENDED AS (1x4.0X4.0)RCC BOX
SRJ:CH:400.840
PF-CH:-382.650
13. GRADIENTS AND L-XING GATE DETAILS ARE UPTO 2.5 KM FROM THE OUTER MOST POINT ON EITHER SIDE.
TP2-CH:- 270.00
TP1-CH:- 323.47
CH:00.00
CH:403.850
14. THE PROPOSED SPEED POTENTIAL OF PROPOSED MAIN LINE IS 160 KMPH & PROPOSED LOOP LINE IS 50 KMPH WITH 1 IN 12 CURVED
LC TO BE EXTENDED
TP2:CH:-539.893 (D)
TP2:CH:-523.873 (F)
TP1:CH:-453.573 (D)
ABANDONED ABANDONED DISTRIBUTION.
TP1:CH:-440.953 (F)
BUILT UP AREA
FM/SRJ:CH:-454.721
LHS NOT FEASIBLE
S.S, QRS;
18. THIS PLAN IS BASED ON APPROVED NRHQE PLAN NO. P-929-Y/1996/R4
DETAILS OF X-OVER NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR
DETAILS OF X-OVER
4.UNITS TUPE-I
SRJ-CH:- 756.471
SRJ-CH:- 644.493
SRJ-CH:- 631.493
CH : 1759.458
T-18
SRJ:CH:-552.299
T-16 OLD G.HACT 16 19. DETAIL OF BUILDING AND PASSENGER AMENITIES PLAN WILL BE SUBMITTED SEPARATELY.
TTP-2 CH : 1796.718
E-25, E-24,
TRACK CENTRE = 6.50 M E-27 E-19 TRACK CENTRE = 5.30 M 20. GAD FOR LHS/RUB, BRIDGE EXTENSION, FOB, STATION BUILDING INCLUDING CIRCULATING AREA, LC CLOSURE PLAN, QUARTERS ETC
NR
NR
E-28 E-26 T-15 T-2
T-23 T-15 LAT T-13 TYPE-I TYPE-I DETAILS OF X-OVER
T-1 4 T-11A
S.S.QRS
OVERALL LENGTH = 111.978 M T-13 T-17 OVERALL LENGTH = 97.578 M WILL BE PREPARED SEPARETLY AND SUBMITTED BY RVNL FOR APPROVAL FROM COMPETENT RAILWAY AUTHORITIES.
E-22 TRACK CENTRE = 5.30 M
SRJ:CH:-710.633
AREA OCCUPIED BY MINIMUM RADIUS OF 21. RAIL LEVEL /FORMATION LEVEL OF PROPOSED TRACK SHOULD BE KEPT SAME AS PER EXISTING TRACK AT BRIDGES AND LCS.
MINIMUM RADIUS OF ROAD 3,66 M WIDE E-9 OVERALL LENGTH = 97.578 M
ROB
3.UNITS TYPE-III PATROL COMPANY 22. EXISTING FRIGHT SIDING FACILITIES AT BNN WILL NOT BE DISMANTLED TILL NEW FRIGHT SIDING FACILITIES AT HYA ARE MADE
NR
NR
CONNECTING CURVE = 442 M 6.UNITS TUPE-I 6.UNITS TUPE-I CONNECTING CURVE = 442 M
T-5 CH :68.073
6.UNITS TUPE-I FOUNTAIN MINIMUM RADIUS OF OPERATIONAL.
4 UNITS TYPE-1
4 UNITS TYPE-1
S.S. QRS S.S. QRS S.S. QRS CONNECTING CURVE = 442 M 23. ALL EXISTING DATA IS AS PER ACTUAL SITE.
ELEC.SWITCH ROOM STATIONBUILDING
T.HUT 24.i)100% GLUED JOINT ARE PROVIDED IN YARD .ii)THICK WEB SWITCHES WILL BE PROVIDED ON ALL NEW.
S.S, QRS;
NR
NR
O.H.S.R PWI OFFICE 60.96
S.S, QRS;
(6.5X6.5 M) PROP.STATION BUILDING
60.96 3.02 PUCCA WELL HO/09/10-13 25.LAND BOUNDARY SHOWN AS PER LAND PLAN NO:- 0371/UMB, 0372/UMB.
DG ROOM NRHQ PLAN NO.P-1437-SO/2012
FLOW
FLOW
FLOW
FLOW
FLOW
TMC T-8 (3.0X6.5 M) RPF Booking/ T-2 GRP
OFFICE
PATHWAY 2.00M WIDE 26.S & T BUILDING SHALL BE PROVIDED AS PER DIVISIONAL PLAN NO. 0-230/BNN-2020/UMB/RVNL.
OFC HUT WAITING AT RAIL LEVEL
R.H OFFICE Reservation PWI PREFAB RCC PLATFORM FENCING 27.NEW PROPOSED STATION BUILDING WILL BE CONSTRUCTED ACCORDING TO NSG-5 CLASS STATION.
NR
NR
BUILT UP AREA PATHWAY 2.00M WIDE T-1 HALL TOILET LIFT
BUILT UP AREA BUILT UP AREA BUILT UP AREA GOODS PLATFORM 167.78X10.75 T-5 (FUTURE)
WKSP T-21 HEIGHT 1.5M BUILT UP AREA
AT RAIL LEVEL office BUILT UP AREA
10.18
9.38
RELAY ROOM
NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR
RAMP
GREEN. ZN. 3.0
HIGH LEVEL PASSENGER PLATFORM RAMP
NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR
8.83
PTI ROOM
DUTY HUT DUTY HUT
8.39
DN MAIN LINE
7.06
10.42 540MX9M
DE
5.95
1 IN 12 1 IN 12
4.46
13.71 4.10 13.71 1IN 12 TP-2 C-D T-73 TP-2 C-B TRAP TP-1 TP-2 C-A VERANDAH 6.85 6.83 5.63 13.71 13.71
13.71 TP-1 1 IN 8.5 TP-1 1IN 12 120M CLEAR OVER RUN LINE 13.71
DE
L1 13.20 12.75
DE
1IN 12 R441.3600
DE
10.67 9.00 10.67 10.67 FM 1 IN 12 10.67 10.67
HOT AXLE SIDING 80 M (TRAP TO DE) TRAP OVER RUN 120M TO BE KEPT CLEAR 1 IN 12 TP-2 4.72 UP MAIN LINE CSR 812.765 M.( FM TO FM ) 4.72 COMMON LOOP LINE CSR 812.765 M.( PT TO PT ) F/M 1IN 12 1IN 12 5.38 4.95 10.67
1IN 12 TP-1 L3 C-G TP-1 5.30 120M CLEAR OVER RUN LINE 12.65 13.10 12.50 12.40 5.38 TTP-2 6.33
L4 L4
DE
5.36
NR NR NR NR NR NR NR NR NR NR NR NR NR DUTY
NR HUT
NR NR NR NR DUTY HUT NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR
1 IN 8.5 NR
1 IN 12 L4 FM 4.62 4.62 1IN 12
FM
TRAP
1 IN 8.5NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR B
24.90
5.33 5.33 NR NR NR NR
TP-2 8.94
RAMP
6.40 3.00 RAMP BUILT UP AREA BUILT UP AREA
24.22
TP1:CH:-440.953 (H)
1 IN 12
TRAP
FM/SRJ-CH:- 533.915
BUILT UP AREA C-K F.O.B
TP2:CH:-523.873 (H)
BUILT UP AREA BUILT UP AREA BUILT UP AREA F/M 1.50 1.50
HIGH LEVEL PASSENGER PLATFORM 540M X6.5M 1 IN 12
SRJ:CH:-613.055
NR
TP-1 & 2 28.65
NR
DE:CH:- 574.721
TRAP,CH:653.915
3.98
TTP-2 CH : 1793.108
DE-CH:- 733.915
DE
1.68 L5 TRACK MACHINE SIDING LINE CSR 350.00 M. ( TRAP TO DE )
SRJ-CH:516.35
SRJ-CH:459.60
C-J
TRAP
PREFAB RCC PLATFORM FENCING
SUBWAY
HEIGHT NR
1.5M SHEKHA 'NSG-6' STATION, KM 9.40
POINTS 1 IN 12 CH.453.69
POINTS 1 IN 12 CH.510.36
TP-1NR 2.70
TRAP-CH:343.736
SRJ-CH:406.50
HADIYAYA 'NSG-6' STATION, AT DISTANCE
ROAD
NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR NR
BUILT UP AREA 304.80 mts PUCCA BOUNDARY WALL
KM-5.97 DETAILS OF X-OVER BUILT UP AREA 4.26
RAIL LEVEL PLATFORM 200.00M X 2.00M
LIFT
(FUTURE)
BUILT UP AREA
BUILT UP AREA
TP2:CH:-231.311 (A)
TP1:CH:-225.033 (E)
TP1:CH:-218.752 (A)
TP1-CH:-214.107 (J)
FM/TRAP CH:294.847
TP2-CH:-332.01 (K)
FM-CH:124.50
TP1-CH:-295.340 (K)
TRACK CENTRE = 5.30 M
TP2-CH:-295.340 (J)
FM/SRJ-CH:-278.85
LEVEL
SRJ-CH:165.26
R 1 IN
CH:375.330
FM-CH:157.91
20
PF-CH:-284.150
PF.CH:192.219
IN 4 1475
SRJ-CH:- 390.01
FOB:CH:-45.64
615
SRJ-CH:-376.428
DE.CH:55.153
OVERALL LENGTH = 97.578 M
PF-CH:-255.85
DE CH: 398.85
MINIMUM RADIUS OF PREFAB RCC PLATFORM FENCING
HEIGHT 1.5M
DETAILS OF X-OVER
F 1 IN F1I N 248
59
CONNECTING CURVE = 442 M TRACK CENTRE = 5.30 M IN 8 1250
F 1 IN 5000
CH.3865 F1 F 1 IN CORRESPONDENCES
CH:403.850
822
OVERALL LENGTH = 97.578 M
F 1 IN 4 CH.1230 CH.2532
61 MINIMUM RADIUS OF F 1 IN 1
250 CURVE NO-15B (DN) 985
000 10 IN 5000 CURVE NO:-K
F 1 IN 5000 F 1 IN S.No. DESCRIPTION COMMUNICATION REFERENCE LETTER No. DATE
LVL F 1 IN 10 F 1 IN 0 F1 Δ = 4°45'49" CONNECTING CURVE = 442 M
Δ - 30°52'16.06" 1 IN 14
75 CH.8371
4 837 F 1 IN 1000 CH.902 F
F 1 IN R= 441.36 M
CURVE NO:-C & D
R - 2575.00 M 1 FRESH ESP IN SUPERSESSION TO EARLIER CPM-II/RVNL/CDG LETTER NO:- 08/RVNL
- -
TL= 18.360 M CURVE NO:-G & H TRL - 100 M APPROVED ESP. /RPJ-BTI (DB)/CDG/ESP DATED 11.06.2021
1
CL= 36.70 M
Δ = 1°24'23"
CURVE NO:-E & F Δ = 1°37'46" CURVE NO:-A CH.754 CL - 1387.417 M F1 IN 248 CH.3600
CH.5311 CH.2667 CH.2261 TP-1= 308.980 M Δ = 1°24'23" R= 3000 M Δ = 1°37'46" 420
KM.114/091 KM.111/041 TP-2= 345.680 M R= 3500 M R= 3500 M TL= 42.660 M R= 441.36 M
TL-710.993 M F 1 IN 2
TL= 42.96 M TL= 42.96 M CL= 85.32 M CURVE NO:-J SE- 45 MM
CL= 85.92 M TL= 6.280 M
CL= 85.92 M TRL= 80.00 M CL= 12.559 M Δ = 10°55'55" TTP-1 CH : 3284.155
TRL= 14.785 M SE= 30 MM CH.1553
TRL= 80.00 M TP-1= 218.752 M R= 425.75 M TTP-2 CH : 1796.718 3
SE= 35 MM SE= 35 MM S= 89 MM TP-2= 231.311 M TL= 40.74 M MPS= 130 KMPH
TP-1= 225.033 M S= 76 MM TP-1= 225.033 M CL= 81.23 M
TP-2= 310.353 M TP-2= 310.353 M TP-1= 227.750 M
TP-1= 225.033 M
7 TP-2= 310.353 M MPS=130KMPH TP-2= 308.980 M
R 1 IN 615 F 1 IN 483 4822
R 1 IN 1000 F 1 IN 816 R 1 IN
R 1 IN 630 F 1 IN MPS=130KMPH
F 1 IN 816 630
NR NR NR NR
REFERENCE DRAWINGS
NR NR NR NR NR NR NR NR NR
NR NR NR NR NR
NR NR NR NR
NR NR NR NR NR
CH.2857 NR NR NR
9.40 NR NR
CH.2218 CH.1521 CH.984 NR NR
9
NR NR
NR NR
Box
.92) NO-19
NR NR
NR NR
C-15B (DN)
NR NR
NR
NR
NR NR
NR
NR PINK BOOK ITEM NO.47 OF 2015-16
RCC
NR NR
NR NR
NR NR
R
NR NR
NR 9.00 NR
x3.6 LAB)B
NR NR
LEGEND AND ABBRIVIATION
C-15A (UP)
NR NR NR NR NR NR NR NR NR
061 R 1 IN NR NR NR NR NR NR NR NR
1 IN 1
NR NR NR NR
F 1000 NR
NR
NR NR NR NR NR NR NR NR NR
NR
NR
6X1
NR NR NR NR NR NR
NR NR
NR NR NR NR
S
NR
NR NR
NR NR
NR
NR
NR Sl. Sl.
.155
NR
D A (RCC
NR NR NR
NR NR
NR NR
NR
NR No. ITEM SYMBOL No. ITEM SYMBOL
NR NR
CH.2388 NR NR
NR
NR
S (1
NR NR NR
284
NR NR
NR NR
NR
1.
66
NR NR
NR NR NR PLATFORM 13. SEWAGE / STREAM / WATER LINE
NR
H:3
NR
XTE F 1X3.
NR NR NR
NR
200
NR NR NR NR
NR NR NR NR 2. SERVICE BUILDING 14. WATER SUPPLY LINE
NDE
NR NR
-1 C
NR NR
NO-
NR NR
)BR ox
NR NR NR
O
NR
NR NR NR NR
3. CENTER LINE OF STATION
STATION NAME
15. RAILWAY BOUNDARY
B
CLASS NR NR
TO 50 C.L.
NR NR NR NR Km. / CH.
CC
T
NR NR ℄
NR NR
16.
T
NR NR
FENCING
BE E
NR NR NR NR
8(PR X1.82)R
B
NR NR NR NR
DN M
A
NR NR
AIN 17. L.C. No.
.5
NR
NR
4. F.O.B. LEVEL CROSSING
L
CLASS
NR NR NR
LINE
104
CS
NR Km. / CH.
NR NR NR
NR NR NR NR
-1
F 2X x2.00
5.
KM:
NR NR R.O.B.
TTP
NR
NR
NR NR NR
NR
NR NR NR
NR
6. 18. OHE MAST
6
NR R.U.B.
.L. O AS (1
NR NR
.
NR NR
0
NR
NR NR
NR NR
1
NR NR CURVE NO-15A (UP) NR
7. BRIDGE / CULVERT 19. PIPE LINE CULVERT
13.7
NR
-1
.23 NDED
TTP
6.5
NR NR NR
C
NR
.673
21.
KM: E EXT
13.71 NR NR
TRL - 100 M CURVE DETAIL CURVE No. ............:
8
UP 9. WATER BODY / LOW LAYING AREA
RADIUS ..................:
10.67
NR Km. / CH. ...............:
NR
A SE- 45MM MAI
TP1..................................:
282
CURVE LENGTH.....:
NR NR TANGENT LENGTH:
N LI
106
DRM-UMB NR CL - 1389.545 MM NE
NR
B
6.67
Date:2022.01.28 01:10:53 +05'30'
:3
10.67 NR TL-712.138 M 22. FOULING MARK
TO
NR 10. METTALED / C.C. ROAD F.M.
1 CH
B NR
TTP-1 CH : 3282.673
TP
ADRM-INFRA-U Karan Singh Digitally signed by Karan Singh TTP-2 CH : 1793.108
TO R 11. PAVEMENTS 23. TANGENT POINT
-
AJPU
TTP
MPS= 130 KMPH
MB Date:2022.01.28 01:07:08 +05'30' RA 24.
12. MAIN LINE / LOOP LINE / YARD LINE
(NON-PASSENGER LINE)
NEERAJ BHANDARI Digitally signed by NEERAJ BHANDARI
SRDEN-CO-UMB 31.0 MAJOR BRIDGE MJ BR 33.0 IMPORTANT BRIDGE IMP BR
Date:2022.01.21 11:02:11 +05'30'
32.0 MINOR BRIDGE MN BR
VIRENDER KADYAN Digitally signed by VIRENDER KADYAN
SRDOM-UMB RAIL VIKAS NIGAM LIMITED
Date:2022.01.19 06:00:21 +05'30' RAIL VIKAS NIGAM LIMITED (A Government of India Enterprise) NORTHERN RAILWAY KEY PLAN
ON
C:\Users\Aditya Dhar\Desktop\download.jpg
N
TIO
N
(A Government of India Enterprise)
I
N
AT
ON
STA 0
IO
Signature block HQ
IO
ISH KUMAR ARORA Digitally signed by ISH KUMAR ARORA INTROSOFT SOLUTIONS
ION
1ST FLOOR, AUGUST KRANTI BHAWAN, PLOT NO. 25, BHIKAJI CAMA PLACE, R.K. PURAM, NEW DELHI - 110066
N
AT
ST
CERTIFICATION: THE RESPONSIBILITY OF THE CORRECTNESS AND COMPLETENESS OF THE SITE DETAILS, DESIGN, DRAWING AND NORTHERN RAILWAY, DIVISION (AMBALA ) NORTHERN RAILWAY HEADQUARTER (BARODA HOUSE, NEW DELHI) A 4
SRDEE-G-UMB ABL M. 37.7
I
0.9 TAT
N.R.H.Q.E. PLAN No.
AT
502, DDA-5 BUILDING, DISTRICT CENTRE,
ST
FULL COMLIANCE OF CONTRACT PROVISIONS RESTS WITH THE DESIGN CONSULTANT i.e. INTROSOFT SOLUTIONS.
Date:2021.12.28 05:37:23 +05'30' DH
L
ESP OF BARNALA I/C WITH
TAT
JANKPJURI, NEW DELHI, 110058 011-45523676/47503189 K
HU
N
6.8 ST
PA
0
N
PA M.
0 LA
40
ION
THIS DRAWING IS THE PROPERTY OF
RAJPURA - BATHINDA DOUBLING (172.64KM)
TIO
PU 1.14
IO
TIA
P
KM HA
KM.173.380
4. WA
A
TI 25.
K
ES
JET 132.20
N
60
HARI MOHAN Digitally signed by HARI MOHAN KM
90
Achal Jain Digitally signed by Achal Jain L
AT
A
AL
.2 AC
AL 34
BA .16
TAT
TIO
BH .15
TA
M 4
SRDCM-UMB
R
B
27.8
. 6 AN
DA
:5
BATHINDA JN STATION
GHU 2.390
0. ST
RA M.1
CEP&D S.d/- S.d/- A
HUK
9.5 CONTRACT:
KM
A 0
N
N
NA
KM
KR
Date:2021.12.22 06:33:45 +05'30'
45
TH 4.9
30 NTT
UC 6.3
ALAL STATION
U
SS
10 IO
KM INT
ST
TIO
KM N K
SEKHA STATION
Date:2022.02.22 05:32:51 +05'30'
STA
:5
CONDUCTING FINAL LOCATION SURVEY INCLUDING PREPARATION OF DETAILED PLANS AND
0
. 7 RI
LE M.1
S
DIVL. PLAN No.
K
N
IN 10
KM.
HAD 4.750
KA
92
HC 00
T
1
RAIL VIKAS NIGAM LIMITED
AT
A
KM LSE
TIO
KM
.1
. 7 TA
HR 48
H
DA
.
8.5 LAN
12
KM. 90.930
A
SECTIONS AND DETAILED ESTIMATE, MARKING CENTRE LINE AND DETAILED ENGINEERING
K
0
RAJINDER KUMAR Digitally signed by RAJINDER KUMAR PAWAN KUMAR GARG
KM
V.K. TYAGI C.K. KESHAV R.N. RAJPOOT R.N. SINGH
A STA
CH
HU
TAP
I
N
KA
KM RI S
AM .22
SRDEN-2-UMB
KM.
U
CA
00 ST
000 TA
IN CONNECTION WITH DOUBLING AND S&T WORKS OF RAJPURA-BATHINDA (173KMS) ROUTE
KM. 99.380
N
KM ULI
8.
IAY
0
11
SANJAY BAJPAI Digitally signed by SANJAY BAJPAI
KA
Date:2021.12.24 05:34:06 +05'30' CTPM/BH CE/P&D/BH A
ST
O 0
08.78
N
TIO
U
. 1 STA
. 0. A S
OF AMBALA DEVISION OF NORTHERN RAILWAY IN THE STATE OF PUNJAB, INDIA
CTPM
HA
KM.
TT
DH
AT
Sr.DGM/S&T./UMB Sr.DGM/ELECT./UMB GGM/ELECT./CO GM/S&T/NDLS CPM-II/RVNL/CDG
1.3 N
L
T
Date:2022.02.22 05:20:42 +05'30'
BB
10 ION
ST
IO
SRDEE-TRD-UM ANKUR JAIN Digitally signed by ANKUR JAIN
KM PUR
A
PROPOSED AUGMENTATION IN YARD LAYOUT AND STRUCTURES REQIRED FOR DOUBLING WITH RESPECT TO THE EXISTING YARD LAYOUT AND STRUCTURES
KM.1
N
N
A
W.P. YEAR 2015-16
AT
HAVE BEEN CHECKED AT SITE AND FOUND TO BE FEASIBLE
T
BAR
B Date:2021.12.27 05:45:25 +05'30'
I
STATION : BARANALA
O
ST
RA
S.d/-
N
S.d/- S.d/- S.d/- S.d/- S.d/- S.d/- S.d/-
A TI
VIVEK Digitally signed by VIVEK
O
YASHPAL SINGH PRAVEEN SINGH PRATEEK VERMA ARSHAD ALI REV. SCALE 1ST ISSUED STATUS
SRDSTE-UMB
N
PM/PMC SSE/P.WAY/BNN SSE/W/BTI ADEN/BTI SSE/S&T/ SSE/TRD/BTI TI/ SSE/ELEC. CMI/BTI DRG. NO: RVNL/RPJ-BTI/ESP/BARANALA STATION/013
Date:2021.12.22 05:44:03 +05'30' REV. DATE DESCRIPTION OF REVISION DRAWN BY DESIGNED BY CHECKED BY ISSUED BY REP. ITEM NO. 47 R# 1:1000 DATE: CRD