1. This document is an electricity bill from BSES Rajdhani Power Ltd for customer Ms. Richa Taneja for the period of 11 February 2022 to 16 March 2022.
2. The bill shows no electricity consumption during this period. Previous reading was 1.00 kWh and current reading is also 1.00 kWh.
3. The net amount payable is Rs. 0 as the customer has a credit of Rs. 192 from a previous provisional bill refund which offsets the fixed and other charges of Rs. 61.06.
1. This document is an electricity bill from BSES Rajdhani Power Ltd for customer Ms. Richa Taneja for the period of 11 February 2022 to 16 March 2022.
2. The bill shows no electricity consumption during this period. Previous reading was 1.00 kWh and current reading is also 1.00 kWh.
3. The net amount payable is Rs. 0 as the customer has a credit of Rs. 192 from a previous provisional bill refund which offsets the fixed and other charges of Rs. 61.06.
1. This document is an electricity bill from BSES Rajdhani Power Ltd for customer Ms. Richa Taneja for the period of 11 February 2022 to 16 March 2022.
2. The bill shows no electricity consumption during this period. Previous reading was 1.00 kWh and current reading is also 1.00 kWh.
3. The net amount payable is Rs. 0 as the customer has a credit of Rs. 192 from a previous provisional bill refund which offsets the fixed and other charges of Rs. 61.06.
Date of Print Out: 18.03.2022 BSES Rajdhani Power Ltd.
Bill of Supply for Electricity Due Date:
EBILL Customer GSTIN : 07AAGCS3187H2Z3 -- Name : Ms. RICHA TANEJA . . Billing Address : D/O SH DAVINDER TANEJA FLAT NO Sanctioned Load : 2.00 (kW) CA No. : 151496541 Energisation Date : 17.06.2015 12 S/F BLOCK-D-9 PKT 8 . SEC-23B DWARKA NEW Contract Demand : Meter Type : 1PSK DELHI 110077 MDI : .00 Supply Type : LT Power Factor : 1.000 Bill No. : 100696219620 Pole No. : NJFPCJ84S1 Bill Basis : Actual O.D. No. : R/21/10270494788 Meter Reading Status : DL CCTV Tagged : No Mobile / Tel. No. :9810075274 Cycle No. : 23 Street Light Tagged : No WI-FI Tagged : No Email ID :vardaani10@yahoo.com District / Division :Najafgarh Tariff Category : Domestic [ Residential ] Walking Sequence :PC1110392A0AA Bill Month :MAR-22 Bill Date :16-03-2022 Customer Care Centre No. 19123 (24x7 Toll Free) Meter No Units Billed Consumption (Current) Billed Consumption (Previous) Multiplication Current Consumption Factor Date of Meter Reading Date of Meter Reading Days Units Reading Reading 40051340 kWh 16-03-2022 1.00 10-02-2022 1.00 1.00 34 40051340 kW 16-03-2022 1.00
Billing Details Current Period Charges ( 11-02-2022 to 16-03-2022 )
Fixed Charges Slab-wise Energy Charges Slab-wise FPA/PPA TOD Srch@8% on Elec.tricity Total Amount (A) (E= Tax @ 5% (A+B+C+D+E+ Cons. Measrd Billed Units Unit Amount(B) PPAC% Amount(C) TOD% Surg/Rebt . A+B+D+R) (H) F+G+H+I) During Rate on B on B Amount (D) 46.36 3.71 0.00 61.06 1.16 Mth(s) Pension Surcharge @7% PPAC on Fix (F) Chg(G) 3.25 7.74 TCS Amount (I) Base Amt. Surcharge CCTV Units 0.00 0.00 0.00 CCTV Bill Amount Street Light Units 0.00 TOTAL -> 0 0.00 .00 Street Light Points (W) WI-FI Units 10W 20W 40W
Past Dues / Refunds / Subsidy
Provisional Bill Refunds Arrears Late Payment Other Total Charges Rebate(R) / Subsidy* Net Amount Surcharge Charges, Payable Payable Refund Refund Amount Period to which (LPSC) if any * Unit Amount it relates 0 0.00 (192.00) 0.00 0.00 (130.94) 0.00/(61.06) (192.00) Amount not immediately payable, if any. BG Security Deposit Rs. 0.00 Rs. 0.00 Bill Amount Payable BG Expiry Date 00-00-0000 Service line cum development charges paid Rs. 0.00 Cash Security Deposit Rs. 1200.00 Rs. 0.00 Interest accrued for FY 2020-21 already adjusted in bill No.100605604187 Rs. (93.00) ( generated for the period 16-03-2021 to15-04-2021). Due Date of Payment Interest for FY 2021-22 will be adjusted in your first bill to be generated in FY 2022-23 -- If payment is made after the due date, LPSC for the delay, shall be charged in Last payment Rs. 100.00 received on 26-08-2019 Payment Accounted Upto. 13-03-2022 the next bill. The connection shall be liable for disconnection on non payment of all dues(including arrears of previous bill(s)) by due date, after notice as per Section 56(1) of the Electricity Act, 2003. #GoNCTD vide Order No. F.11(111)/2012/Power/Vol-III/1417-1427 dated 20.04.2020 has extended subsidy to domestic consumers w.e.f. 01.04.2020 of entire bill amount upto 200 Units/month. Slab 201-400 Units/month will get subsidy upto Rs.800/month.No subsidy for consumption above 400 Units/month.##In case any variation in SLD charges noted, consumer may visit divisional office for requisite correction. Pension Surcharge @ 7.00% has been levied on energy & fixed charge w.e.f. 01.10.2021. ##The amount of Security Deposit against your connection is mentioned herewith under the heading "Security Deposit with DISCOM". Please check this amount and report any discrepancy by furnishing documentary proof in that regard available with you, at the customer care centre of respective division office. #
(This bill is computer generated, hence does not require signature.)
------------------------------------------------------------------------------------------------------------------------------------------------ PAYNOW Payment Slip * Make your cheque/DD payable to BRPL CA No. 151496541 * Cheque should be account payee and payable at Delhi * Cheque should not be post dated. * Do not Staple.Only clip the cheque to payment slip.. * Write your telephone number on reverse of the cheque. Bill amount payable: Rs.0.00 Bill month:MAR-22 Cheque/DD No. Date: 2300R151496541000000000000202203160000000000 Regd.Office: BSES Rajdhani Power Limited (A joint venture of Reliance Infrastructure Ltd & Govt.of NCT of Delhi) BSES Bhawan, Nehru Place, NEW DELHI-110019 CIN NO.:U40109DL2001PLC111527, Telephone No: 011-3999 9707, Fax No: 011-3999 9890, Email: brpl.customercare@relianceada.com, Website: www.bsesdelhi.com