II PEKERJAAN PONDASI
1 Batu Gunung 53.22 Ret
2 Pasir 6.92 Ret
3 Semen 159.65 Sak
III SLOEF
1 Semen 311.90 zak
2 Pasir 15.60 M³
3 Batu Split 29.24 M³
4 Papan cor 2/20 8.00 M3
5 Kaso kayu Meranti 4/6 5.00 btg
6 Besi Ø. 8 ex. Sii ( Sengkang jarak 0.15 ) 265.12 btg
7 Besi Ø. 14 ex.Sii (Tulangan Pokok) 259.92 btg
9 Kawat beton + paku 1.00 ls
IV POER PLAT
1 Semen 346.11 zak
2 Pasir 17.31 M³
3 Batu Split 30.28 M³
4 Papan cor 2/20 1.00 M3
5 Kaso kayu Meranti 4/6 0.50 btg
6 Besi Ø. 8 ex. Sii ( Sengkang jarak 0.15 ) 104.00 btg
7 Besi Ø. 14 ex.Sii (Tulangan Pokok) 312.00 btg
9 Kawat beton + paku 1.00 ls
V PEKERJAAN KOLOM BAJA WF 350.175.7.11.14
1 Plat T 22mm 6.40 m2
2 Plat T 12mm 2.56 m2
3 baut Anchor 25 256.00 Bh
4 WF 350.175.7.11.14 138.40 m1
VI PEKERJAAN KUDA-KUDA BAJA WF 300.150.6.5.9
1 Plat T 8 mm 19.99 m2
2 Plat T 12mm 8.40 m2
3 baut 3/4" 256.00 Bh
4 WF 300.150.6.5.9 420.00 m1
5 Voute WF 300.150.6.5.9 9.80 m1
VII PEKERJAAN KUDA-KUDA BAJA WF 150.75.5.7.8
1 Plat T 8 mm 0.28 m2
2 Plat T 12mm 2.02 m2
3 baut 1/2" 168.00 Bh
4 WF 150.75.5.7.8 33.60 m1
5 Voute WF 150.75.5.7.8 4.20 m1
VIII PEKERJAAN RING BALK ARAH VERTIKAL BAJA WF 250.125.6.9.12
1 Plat T 8 mm 0.36 m2
2 Plat T 12mm 3.90 m2
3 baut 5/8" 312.00 Bh
4 WF 250.125.6.9.12 152.60 m1
5 Voute WF 250.125.6.9.12 13.00 m1
IX PEKERJAAN RING BALK ARAH HORIZONTAL BAJA WF 250.125.6.9.12
1 Plat T 8 mm 0.36 m2
2 Plat T 12mm 0.96 m2
3 baut 5/8" 32.00 Bh
4 WF 250.125.6.9.12 56.00 m1
5 Voute WF 250.125.6.9.12 2.00 m1
X PEKERJAAN CANAL CNP 150.50.20.3,2
LANTAI 1 Page 2
1 Besi Siku 21.00 m1
2 baut 5/8" 840.00 Bh
3 CNP 150.50.20.3,2 2,379.00 m1
LANTAI 1 Page 3
XI PEKERJAAN TARIK ANGIN KABEL BAJA 16
1 Baja Ø 16mm 936.00 m1
2 baut 1/2" 208.00 Bh
3 Plat T 8 mm 1.68 m2
XII PEKERJAAN ATAP SPANDEK TEBAL O,7 MM
1 Atap Spandek 2,588.41 m2
2 Baut 10,353.64 Bh
LANTAI 1 Page 4
LANTAI 1 Page 5
II SLOEF TERAS
1 Semen 14.72 zak
2 Pasir 0.74 M³
3 Batu Split 1.38 M³
4 Papan cor 2/20 0.50 M3
5 Kaso kayu Meranti 4/6 0.50 btg
6 Besi Ø. 8 ex. Sii ( Sengkang jarak 0.15 ) 19.55 btg
7 Besi Ø. 14 ex.Sii (Tulangan Pokok) 19.17 btg
9 Kawat beton + paku 1.00 ls
LANTAI 1 Page 6
GALIAN
PONDASI
PONDASI 1
PV = 74 M1
PH = 52 M1
126 M1
PONDASI 2
PV = 29.32 M
PH = 15.2 M
44.52 M
PONDASI 3
PV +PH = 48.35 M
48.35 M
VOLUME PONDASI 1
V= 1.62 M1
204.12 M3
VOLUME PONDASI 2
V= 0.558 M1
24.84216 M3
VOLUME PONDASI 3
V= 1.35 M1
65.2725 M3
PONDASI 1
V= 0.63 M3
79.38 M3
PONDASI 2
V= 0.207 M3
9.21564 M3
PONDASI 3
V= 0.4275 M3
20.66963 M3
URUGAN PASIR BAWAH PONDASI
T= 0.1
PONDASI 1 13.86 M3
PONDASI 2 3.5616 M3
PONDASI 3 4.835 M3
TOTAL VOLUME 22.2566 M3
SLOEF 30/50
P= 118
DIM = 0.15
17.7
BESI
SLOEF 20/40
P= 115.1 M1
DIM = 0.08
9.208
BESI
P1= 15 BH
P L T V SAT
BETON POER 1.2 1.2 0.25 5.4 M3
TOTAL 9.53 M3
PEMBESIAN POER
PEMBESIAN PED.
NAMA PANJANG JUMLAH BERAT/M DIM
POKOK 2.75 12 2.835 19
EKSTRA 2.835
PINGGANG 2 1.13
BEGEL 1.4 20 0.78
TINGGI 4 M
VOLUME 3.96 M3
BETON
BESI
NAMA PANJANG JUMLAH BERAT/M DIM
POKOK 60 12 2.835 19
EKSTRA 2.835
PINGGANG 1.13
BEGEL 1.4 600 0.78
TINGGI 4 M
VOLUME 4.23 M3
BETON
BESI
NAMA PANJANG JUMLAH BERAT/M DIM
POKOK 60 12 2.835 19
EKSTRA 2.835
PINGGANG 1.13
BEGEL 1.4 600 0.78
P= 54 M1 1.62
BESI PANJANG JUMLAH BERAT/M DIM
POKOK 54 4 0.78 10
BEGEL 0.55 360 0.28 6
BESI
NAMA PANJANG JUMLAH BERAT/M DIM
POKOK 137.7 4 2.835 19
EKSTRA 137.7 2 2.835
PINGGANG 137.7 2 1.13
BEGEL 1.4 1101.6 0.78
BESI
NAMA PANJANG JUMLAH BERAT/M DIM
POKOK 45.2 2 2.835 19
EKSTRA 45.2 1 2.835 19
PINGGANG 45.2 0 1.13 12
BEGEL 1.1 361.6 0.78 10
BESI
NAMA PANJANG JUMLAH BERAT/M DIM
POKOK 14.2 2 2.835 19
EKSTRA 14.2 1 2.835 19
PINGGANG 14.2 2 1.13 12
BEGEL 1.1 113.6 0.78 10
BALOK LT 02 (25/50)
P= 137.5 V= 17.1875
BESI
NAMA PANJANG JUMLAH BERAT/M DIM
POKOK 137.7 4 2.835 19
EKSTRA 137.7 4 2.835 19
PINGGANG 137.7 2 1.13 12
BEGEL 1.6 1101.6 0.78 10
BALOK LT 02 (20/40)
P= 110.5 V= 8.84
BESI
NAMA PANJANG JUMLAH BERAT/M DIM
POKOK 110.7 4 2.835 19
EKSTRA 110.7 3 2.835 19
PINGGANG 110.7 2 1.13 12
BEGEL 1.2 885.6 0.78 10
BETON TANGGA
BALOK = 0.448
PLAT TANG. = 4.608
ANTAK TANG = 3.168
PEDESTAL POER = 0.96
POER PLAT = 1.44
10.624 M3
BESI PLAT
NAMA PANJANG JUMLAH BERAT/M DIM
POKOK 8.2 64 1.13 12
EKSTRA 3 1.13 19
PINGGANG 2 1.13 12
BEGEL 4.8 53 1.13 12
BESI BALOK
NAMA PANJANG JUMLAH BERAT/M DIM
POKOK 8 4 2.835 19
EKSTRA 8 1 2.835 19
PINGGANG 8 2 1.13 12
BEGEL 1.2 50 0.78 10
P1= 21 294
L1= 14
P2= 1.5 12
L2= 8
T= 0.12 36.99
PEMBESIAN PLAT
10 5918.4
632.3077
3.1 14 43.4
1.6
TEBAL 0,1 45
2.7
9.375
27
216
23.07692
P1= 14
L1= 1.35
1.89 18.9
6.5625
32.30769
TOTAL
1,340 KG 34.02 39 btg
1,257 KG 34.02 37 btg
267 KG 13.56 20 btg
1,104 KG 9.36 118 btg
3,969 KG
TOTAL
1,391 KG 24.132 58 btg
- KG 24.132 - btg
261 KG 13.56 19 btg
790 KG 9.36 84 btg
2,442 KG
TOTAL
1,403 KG 34.02 41 btg
- KG 34.02 - btg
- KG 13.56 - btg
328 KG 9.36 35 btg
1,731 KG
TOTAL
549 KG 9.36 59 btg
163 3.36 48 btg
TOTAL
2,041 KG 34.02 60 btg
- KG 34.02 - btg
- KG 13.56 - btg
655 KG 9.36 70 btg
2,696 KG
TOTAL
587 KG 9.36 63 btg
174 3.36 52 btg
TOTAL
2,041 KG 34.02 60 btg
- KG 34.02 - btg
- KG 13.56 - btg
655 KG 9.36 70 btg
2,696 KG
TOTAL
168 KG 9.36 18 btg
55 3.36 17 btg
34.375
TOTAL 189.0625
1,562 KG 34.02 46 btg
781 KG 34.02 23 btg
311 KG 13.56 23 btg
1,203 KG 9.36 129 btg
3,856 KG
TOTAL
256 KG 34.02 8 btg
128 KG 34.02 4 btg
- KG 13.56 - btg
310 KG 9.36 33 btg
695 KG
TOTAL
81 KG 34.02 2 btg
40 KG 34.02 1 btg
32 KG 13.56 2 btg
97 KG 9.36 10 btg
250 KG
TOTAL
1,562 KG 34.02 46 btg
1,562 KG 34.02 46 btg
311 KG 13.56 23 btg
1,375 KG 9.36 147 btg
4,809 KG
TOTAL
1,255 KG 34.02 37 btg 27.675
942 KG 34.02 28 btg 138.375
250 KG 13.56 18 btg
829 KG 9.36 89 btg
3,276 KG
TOTAL
593 KG 13.56 44 btg 2.05
- KG 13.56 - btg 10.25
- KG 13.56 - btg
287 KG 13.56 21 btg
880 KG
32
TOTAL
91 KG 34.02 3 btg
23 KG 34.02 1 btg
18 KG 13.56 1 btg
47 KG 9.36 5 btg
178 KG 53.33333
TOTAL
151 KG 6 25 btg
- KG 6 - btg
- KG 13.56 - btg 23
157 KG 6 26 btg
308 KG
TOTAL
98 KG 13.56 7 btg
89 KG 13.56 7 btg
0 btg 31.33333
0 btg
187 KG
TOTAL
140 KG 13.56 10 btg
- KG 13.56 - btg
- KG 13.56 - btg
99 KG 9.36 11 btg
239 KG
107.0313
2.88
CONTOH PERHITUNGAN BERAT BESI BETON DALAM 1 M3
1 10.00 0.62
2 13.00 1.04
3 16.00 1.58
4 19.00 2.23
5 22.00 2.98
6 25.00 3.85
7 29.00 5.19
8 32.00 6.31
9 36.00 7.99
RENCANA ANGGARAN BIAYA
PROYEK PEMBANGUNAN RUMAH TINGGAL 2 LANTAI PERMANEN
LuasM2 : 240 m2
PEMILIK: BAPAK UDAYA
MATERIAL UPAH
TOTAL BIAYA L ANTAI 1 DAN 2 Rp 108,104,648